We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Manufacturing of Banana Wafers (Deep Fried Snack Food)
Manufacturing of Banana Wafers (Deep Fried Snack Food)

Fried banana wafers are a deep fried snack food prepared from green fresh mature bananas of the cookin... Read More

Capacity : Banana Wafers (40 gms size): 10,700 Packets / Day Banana Wafers (20 gms size): 21,300 Packets / Day
Plant and Machinery cost: 37.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 393.00Lakhs
Add To Inquiry Basket
Rice Husk based Biodegradable Cutlery Making Plant
Rice Husk based Biodegradable Cutlery Making Plant

People around the world hav... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 222.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity : -
Plant and Machinery cost: 2700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 6000.00Lakhs
Add To Inquiry Basket
Production of Phenolic Formaldehyde Resin
Production of Phenolic Formaldehyde Resin

 

Phenol formaldehyde resins (PF) or Phenolic resins are artificial polymers o... Read More

Capacity : 1,000 kg/day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 144.00Lakhs
Add To Inquiry Basket
Fresh Dips
Fresh Dips

Fresh DIP is a creamy liquid that is served with food or used to prepare foods. Sauces add flavor and moisture to food... Read More

Capacity : Fresh Dips 50 gms Size Pkts: 1,500,000 Pkts per annum Fresh Dips 20 gms Size Pkts: 3,750,000 Pkts
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 213.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. In addition to sanitary na... Read More

Capacity : 23040 Pcs./day
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 127.00Lakhs
Add To Inquiry Basket
Palm Oil
Palm Oil

Palm oil is a fatty edible vegetable oil, yellowish in color, derived from the flesh and the kernel of the fruit of th... Read More

Capacity : Palm Oil : 500 Ltrs/Day Palm Kernel : 115 Kgs/ Day Palm Fibres (Cake) : 500 Kgs/ Day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):68.00 %
TCI :0.00 Lakhs
Cost of Project : 75.00Lakhs
Add To Inquiry Basket
Cheese Analogues
Cheese Analogues

Cheese analogues (more widely known as cheese alternatives) are products used as culinary replacements for cheese. These in... Read More

Capacity : 1000 Kgs./Day
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 126.00Lakhs
Add To Inquiry Basket
Adhesive (Fevicol Type) Water Proofing Grade
Adhesive (Fevicol Type) Water Proofing Grade

Fevicol type adhesives come under the category of synthetic resins and latex adhesives are made from polyvinyl acetate is a therm... Read More

Capacity : 3MT/Day
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 183.00Lakhs
Add To Inquiry Basket
Nuts & Bolts (M S Fasteners)
Nuts & Bolts (M S Fasteners)

A fastener is a connective mechanism that mechanically joins or affixes two or more objects toget... Read More

Capacity : Mild Steel/HT Bolts : 625 Kgs. /Day Mild Steel/HT Nuts : 125 Kgs. /Day
Plant and Machinery cost: 33.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 54.00Lakhs
Add To Inquiry Basket
Spices in Pouch Packing
Spices in Pouch Packing

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, alt... Read More

Capacity : 360,000 kgs./annum
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 181.00Lakhs
Add To Inquiry Basket
Tennis Ball  (Used in Playing Cricket)
Tennis Ball (Used in Playing Cricket)

Tennis ball cricket is a variant of cricket popular in the Indian subcontinent, and a very South Asians living in the US &a... Read More

Capacity : 1,500,000 NOS/annum
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 164.00Lakhs
Add To Inquiry Basket
EXERCISE NOTE BOOK AND OFFSET PRINTING
EXERCISE NOTE BOOK AND OFFSET PRINTING

Exercise note book, registers, pads and files are widely known and vastly used as day to day products. Exercise note books are of different shapes ... Read More

Capacity : 7500 Nos. Exercise Note Books/Day and Offset Press for Printing Job Work
Plant and Machinery cost: 35.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):46.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
PAN MASALA, MEETHA, SADA, ZARDA  (GUTKA)
PAN MASALA, MEETHA, SADA, ZARDA (GUTKA)

-

Read More
Capacity : 700 Kg./day
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):32.00 %
TCI :189.00 Lakhs
Cost of Project : 189.00Lakhs
Add To Inquiry Basket
PAN MASALA SADA, MEETHA, ZARDA (GUTKA) & PACKAGING
PAN MASALA SADA, MEETHA, ZARDA (GUTKA) & PACKAGING

Pan Masala is widely used to remove bad odour of mouth and for scenting the breath in order to impart it a pleasant feeling. Now-a-days Pan Parag, ... Read More

Capacity : (200 Kgs. Sada Masala, 200 Kgs. Meetha Masala, 500 Kgs. Zarda) Per Day
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):56.00%
Break Even Point (BEP):34.00 %
TCI :189.00 Lakhs
Cost of Project : 189.00Lakhs
Add To Inquiry Basket
CAFFEINE FROM TEA WASTE
CAFFEINE FROM TEA WASTE

Caffeine is widely used in pharmaceuticals as free base and mixtures, such as citrated caffeine’... Read More

Capacity : 0.30 MT/day
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):49.00 %
TCI :138.00 Lakhs
Cost of Project : 138.00Lakhs
Add To Inquiry Basket
Activated Carbon from Coconut Shell
Activated Carbon from Coconut Shell

Activated carbon is a amorphous from of carbon which has been treated to produce a highly developed pore structure resulting in a very large intern... Read More

Capacity : 1.0 Tonnes/Day
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 29.00
Rate of Return (ROR):47.21%
Break Even Point (BEP):46.53 %
TCI :108.00 Lakhs
Cost of Project : 108.00Lakhs
Add To Inquiry Basket
Bleaching Powder
Bleaching Powder

Bleaching process are those which remove colour from natural or artificial products. In early times bleaching was done by mechanical means and blea... Read More

Capacity : 5 MT/Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 14.00
Rate of Return (ROR):59.38%
Break Even Point (BEP):40.74 %
TCI :75.00 Lakhs
Cost of Project : 75.00Lakhs
Add To Inquiry Basket
Cheese Analogues
Cheese Analogues

Cheese is basically milk product, which is manufactured from milk by acidulation and then by filtration. The precipitate is cheese, there are few s... Read More

Capacity : 1000 Kgs/Day
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 4.00
Rate of Return (ROR):24.60%
Break Even Point (BEP):57.92 %
TCI :126.00 Lakhs
Cost of Project : 126.00Lakhs
Add To Inquiry Basket
Sodium Hypochlorite (Bleach Liquor)
Sodium Hypochlorite (Bleach Liquor)

Prior to the development of chlorinated bleaches the process of bleaching textiles was a long and laborious one which required several months at a ... Read More

Capacity : 10 Ton/Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):53.00 %
TCI :191.00 Lakhs
Cost of Project : 191.00Lakhs
Add To Inquiry Basket
Setting Up Banana Ripening Chamber
Setting Up Banana Ripening Chamber

A banana ripening chamber is a controlled environment where ... Read More

Capacity : Ripe Banana 8 MT per day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 193.00Lakhs
Add To Inquiry Basket
A Business Plan  Cosmetic Unit (Serum, Cream & Shampoo)
A Business Plan Cosmetic Unit (Serum, Cream & Shampoo)

A cosmetic unit typically includes a serum, cream, and shampoo that work together to hydrate, nourish, and protect your skin and hair. Serums are l... Read More

Capacity : Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 552.00Lakhs
Add To Inquiry Basket
Business Plan for Baby Diaper (T-shape and Pull-up Pants)
Business Plan for Baby Diaper (T-shape and Pull-up Pants)

 

Diapers are primarily worn by children who are not yet potty trained and exp... Read More

Capacity : Pull-up Baby Pant Single Diaper (4 Pcs/Pkt): 60000 Pkt/day T-shape Open Style Baby Diaper (4 Pcs/Pkt
Plant and Machinery cost: 2600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):36.00 %
TCI :0.00 Lakhs
Cost of Project : 4178.00Lakhs
Add To Inquiry Basket
Start Business of  A2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

 

Milk is the most ... Read More

Capacity : A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
HAND SANITIZER MANUFACTURING
HAND SANITIZER MANUFACTURING

 

Hand sanitizer is alcohol-based or alcohol-free liquid, which is used for c... Read More

Capacity : Hand Sanitizer (50 ml size Bottles): 10,000 Bottle Per day
Plant and Machinery cost: 16.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 157.00Lakhs
Add To Inquiry Basket
Biodegradable Plates & Bowls From Areca Tree Leaf
Biodegradable Plates & Bowls From Areca Tree Leaf

Areca Leaf Plates are made from areca leaf, which are eco friendly and sanitized, Manufacturing in high Quality ... Read More

Capacity : Bio-Degradable Areca Leaf Round Plates (Size 10"/12") 3,200.0 Pcs./Day Bio-Degradable Areca Leaf Rou
Plant and Machinery cost: 35.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):13.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 79.00Lakhs
Add To Inquiry Basket
Dragon Fruits Farming
Dragon Fruits Farming

A pitaya or pitahaya is the fruit of several cactus species. "Pitaya" usually refers to fruit of the genus Stenocereus... Read More

Capacity : 36,000 Kgs per annum
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):74.00 %
TCI :0.00 Lakhs
Cost of Project : 73.00Lakhs
Add To Inquiry Basket
Dental Materials (Alginate, GI Cement, Composite Resin and Polycarboxylate Cement)
Dental Materials (Alginate, GI Cement, Composite Resin and Polycarboxylate Cement)

A dental impression is a negative imprint of hard (teeth) and soft tissues in the mouth from which a positive reproduction ... Read More

Capacity : Composite Resin Poly Carboxylate Cement (500 gms Pack) : 80 Packs/ Day Glass Ionomer Cement (
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):75.00 %
TCI :0.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Infrared Reflected (IR) Paint
Infrared Reflected (IR) Paint

The sun energy reaches Earth as UV, visible and infrared radiation. The last one is largely responsible for heat build-up.&... Read More

Capacity : 300 Ltrs. /Day
Plant and Machinery cost: 33.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
Nuts & Bolts (MS Fasteners)
Nuts & Bolts (MS Fasteners)

Nuts & Bolts (M.S. Fasteners)

A... Read More

Capacity : Mild Steel/HT Bolts: 625 Kgs. /Day Mild Steel/HT Nuts : 125 Kgs. /Day
Plant and Machinery cost: 33.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 54.00Lakhs
Add To Inquiry Basket
Baby Cereal Food
Baby Cereal Food

The Baby-cereal-foods is that enriched food which has a requisite level of nutrition. This requisite level is prescribed... Read More

Capacity : 600,000 Kgs/annum
Plant and Machinery cost: 35.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 82.00Lakhs
Add To Inquiry Basket
Repair & Refurbishment of Power Transformers
Repair & Refurbishment of Power Transformers

Transformer is a machine that transfers electrical energy from one electrical circuit to another without changing frequency by the principle of ele... Read More

Capacity : Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann
Plant and Machinery cost: 33.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):65.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity : Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.18%
Break Even Point (BEP):56.37 %
TCI :314.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Banana Powder
Banana Powder

Good quality banana powder is produced from the bananas of right variety and degree of ripeness. Immature or over ripe fruits should be excluded fr... Read More

Capacity : 300000.00 Kgs./Annum
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):43.00 %
TCI :123.00 Lakhs
Cost of Project : 123.00Lakhs
Add To Inquiry Basket
Pan Masala, Sada, Meetha & Zarda
Pan Masala, Sada, Meetha & Zarda

Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other ingredients. It is an agricu... Read More

Capacity : Sada Pan Masala :330.0 Kgs./Day.,Meetha Pan Masala:330.0 Kgs./ Day.,Zarda Pan Masala:340.0 Kgs. / Da
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):45.00 %
TCI :251.00 Lakhs
Cost of Project : 251.00Lakhs
Add To Inquiry Basket
Copper Powder
Copper Powder

Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers... Read More

Capacity : 2 MT/ day
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):29.70 %
TCI :792.00 Lakhs
Cost of Project : 792.00Lakhs
Add To Inquiry Basket
MAGNESIUM SULPHATE (FERTILISER GRADE)
MAGNESIUM SULPHATE (FERTILISER GRADE)

The name earth was given by the older chemist to all substances that remained unchanged by fire. Lime, magnesia, strontium, and baryta were found t... Read More

Capacity : 20 MT/day
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):41.00 %
TCI :210.00 Lakhs
Cost of Project : 210.00Lakhs
Add To Inquiry Basket
DESICCATED COCONUT POWDER
DESICCATED COCONUT POWDER

Coconut powder is the one of the common oldest name which is basically used in making cakes, pastries & chocolates. Coconut powder is usually c... Read More

Capacity : 16 MT/day
Plant and Machinery cost: 56.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):51.00%
Break Even Point (BEP):29.00 %
TCI :1400.00 Lakhs
Cost of Project : 1400.00Lakhs
Add To Inquiry Basket
PET PREFORM FROM PET RESIN
PET PREFORM FROM PET RESIN

PET (also named PETE) is a kind of polyester material for fiber, injection molded parts, as well as blow-molded bottles and jars. Special grades ar... Read More

Capacity : 100000 Nos. PET Preform / day or 500 ml. each PET Preform
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):35.00 %
TCI :225.00 Lakhs
Cost of Project : 225.00Lakhs
Add To Inquiry Basket
PAN MASALA, ZARDA, KHAINI, GUTKA, SWEET & SCENTED SUPARI
PAN MASALA, ZARDA, KHAINI, GUTKA, SWEET & SCENTED SUPARI

Panmasala, Zarda, Khaini, Gutka, Sweet & Scented supari now-a-days are very common demandable products. Increasing likings of people for tobacc... Read More

Capacity : Pan Masala 180 MT / Annum, Zarda 180 MT / Annum,Gutka 180 MT / Annum,Khaini 90 MT / Annum,Scented
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):89.00 %
TCI :177.00 Lakhs
Cost of Project : 177.00Lakhs
Add To Inquiry Basket
MAGNESIUM SULPHATE AS FERTILIZER GRADE
MAGNESIUM SULPHATE AS FERTILIZER GRADE

Magnesium sulphate is used, as fertilizer for supplying trace amounts of magnesium and sulphate to the plant. Magnesium sulphate is manufactured by... Read More

Capacity : 20 MT / Day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):44.00 %
TCI :97.00 Lakhs
Cost of Project : 97.00Lakhs
Add To Inquiry Basket
SANITARY NAPKINS
SANITARY NAPKINS

The sanitary napkin industry is clos... Read More

Capacity : 120000 Pcs./Day
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):63.00%
Break Even Point (BEP):31.00 %
TCI :183.00 Lakhs
Cost of Project : 183.00Lakhs
Add To Inquiry Basket
Precipitated Silica from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Precipitated silica (also called particulate silica) is compound of aggregates of ultimate particles of colloidal size that have not become linked ... Read More

Capacity : 2 Ton/Day
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):41.00 %
TCI :174.00 Lakhs
Cost of Project : 174.00Lakhs
Add To Inquiry Basket
Bricks From Fly Ash
Bricks From Fly Ash

Bricks may be made from a number of different kinds of materials, but they must usually possess (can be capable of developing) a certain amount of ... Read More

Capacity : 83333 Nos./Day
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.80%
Break Even Point (BEP):53.00 %
TCI :192.00 Lakhs
Cost of Project : 192.00Lakhs
Add To Inquiry Basket
Zinc Oxide From Zinc Dross
Zinc Oxide From Zinc Dross

This is by far the most important zinc compound. Zinc oxide is valuable both for direct application and for production of other zinc compounds. It ... Read More

Capacity : 15 MT/Day
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 458.00
Rate of Return (ROR):97.72%
Break Even Point (BEP):21.85 %
TCI :557.00 Lakhs
Cost of Project : 557.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Fiberglass Wool Ceiling Tiles
Investment Opportunities in Fiberglass Wool Ceiling Tiles

A secondary ceiling, hung below the primary (structural) ceili... Read More

Capacity : 3000 Sq. Mtr. per Day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 213.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity : Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

Laundry soap bars are a con... Read More

Capacity : Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 65.00Lakhs
Add To Inquiry Basket
Readymade Khaini Chewing Tobacco Manufacturing Business
Readymade Khaini Chewing Tobacco Manufacturing Business

 

Read More

Capacity : Readymade Khaini (Packed in 10 gms Pouches Size) 200,000 Pouches per day
Plant and Machinery cost: 40.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 360.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity : Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 227.00Lakhs
Add To Inquiry Basket
Biodegradable, Eco-Friendly Cutlery using Rice Husk (Rice Hulls or Rice Husks)
Biodegradable, Eco-Friendly Cutlery using Rice Husk (Rice Hulls or Rice Husks)

Biodegradable cutlery has emerged as a far better alternative to plastics across the world and Indians are early adopt... Read More

Capacity : Biodegradable Cutlery (Per Set 9 Pcs. Flatware): 1,852 Sets / Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 142.00Lakhs
Add To Inquiry Basket
Indian Kitchen Spices (Masala Powder) Spices Powder and Blended Spices, Readymade mixes   (Red Chilli Powder, Sambhar Masala, Biryani Masala, Chicken Fry Masala, Garam Masala)
Indian Kitchen Spices (Masala Powder) Spices Powder and Blended Spices, Readymade mixes (Red Chilli Powder, Sambhar Masala, Biryani Masala, Chicken Fry Masala, Garam Masala)

A spice is a seed, fruit, root, bark, berry, bud or other vegetable substance primarily used for flavoring, coloring o... Read More

Capacity : Red Chilli Powder: 100 Kgs. / day Sambhar Masala :100 Kgs. / day Biryani Masala:100 Kgs. / day Chick
Plant and Machinery cost: 35.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 195.00Lakhs
Add To Inquiry Basket
Drumstick -Moringa Oleifera Powder (Moringa Oleifera, Drumstick Leaf Powder, Drumstick tree-सहजन) Manufacturing
Drumstick -Moringa Oleifera Powder (Moringa Oleifera, Drumstick Leaf Powder, Drumstick tree-सहजन) Manufacturing

Moringa Oleifera is that the most widely cultivated species of the genus Moringa, which is that th... Read More

Capacity : Drumstick (Moringa Oleifere) Powder : 400 Kgs / Day
Plant and Machinery cost: 31.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Biodegradable Plates & Bowls from Areca Tree Leaf
Biodegradable Plates & Bowls from Areca Tree Leaf

Areca Leaf Plates are made from areca leaf, which are eco friendly and sanitized, Manufacturing in high Quality ... Read More

Capacity : Bio-Degradable Areca Leaf Round Plates (Size 10"/12"):3200 Pcs per day Bio-Degradable Areca Leaf Rou
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):14.00%
Break Even Point (BEP):77.00 %
TCI :0.00 Lakhs
Cost of Project : 79.00Lakhs
Add To Inquiry Basket
E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to c... Read More

Capacity : 4 Nos./Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 323.00Lakhs
Add To Inquiry Basket
Cross-Linked Sodium Carboxymethyl Cellulose
Cross-Linked Sodium Carboxymethyl Cellulose

Cross-linked sodium carboxymethyl cellulose is also known as croscarmellose sodium or modified cellulose gum. ... Read More

Capacity : 1000 Kgs./Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 144.00Lakhs
Add To Inquiry Basket
Dish Wash  (Liquid & Soap Bar)  and Detergent  (Liquid Soap Bar and Powder)
Dish Wash (Liquid & Soap Bar) and Detergent (Liquid Soap Bar and Powder)

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-a... Read More

Capacity : Dishwash Liquid :300,000 Kgs/annum Dishwash Soap Bar : 300,000 Kgs/annum Detergent
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 204.00Lakhs
Add To Inquiry Basket
Thermocol Moulded Items Plates and Glass
Thermocol Moulded Items Plates and Glass

Thermocol has been employed almost exclusively in the packing and thermoacoustic isolation sectors; utilizing new processes and sophisticated equip... Read More

Capacity : Thermocol Glasses: 64,800 Kgs/Annum Thermocol Plates : 211,200 Kgs/Annum
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :109.00 Lakhs
Cost of Project : 109.00Lakhs
Add To Inquiry Basket
Bricks from Fly Ash
Bricks from Fly Ash

Fly Ash is a burnt residue of pulverized coal (bituminous or sub-bituminous) and is siliceous in nature. In past few decades, R&D efforts were ... Read More

Capacity : Fly Ash Bricks 24000 Nos/Day
Plant and Machinery cost: 40.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.86%
Break Even Point (BEP):59.27 %
TCI :194.00 Lakhs
Cost of Project : 194.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing of Banana W... Banana Wafers (40 gms size): 10,700 Packets / Day Banana Wafers (20 gms size): 21,300 Packets / Day 30.00 393.00
Rice Husk based Biodegrad... Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day 27.00 222.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Mink Blankets Production - 27.00 6000.00
Production of Phenolic Fo... 1,000 kg/day 24.00 144.00
Fresh Dips Fresh Dips 50 gms Size Pkts: 1,500,000 Pkts per annum Fresh Dips 20 gms Size Pkts: 3,750,000 Pkts 30.00 213.00
Sanitary Napkins 23040 Pcs./day 28.00 127.00
Palm Oil Palm Oil : 500 Ltrs/Day Palm Kernel : 115 Kgs/ Day Palm Fibres (Cake) : 500 Kgs/ Day 28.00 75.00
Cheese Analogues 1000 Kgs./Day 26.00 126.00
Adhesive (Fevicol Type) W... 3MT/Day 27.00 183.00
Nuts & Bolts (M S Fastene... Mild Steel/HT Bolts : 625 Kgs. /Day Mild Steel/HT Nuts : 125 Kgs. /Day 27.00 54.00
Spices in Pouch Packing 360,000 kgs./annum 29.00 181.00
Tennis Ball (Used in Pla... 1,500,000 NOS/annum 28.00 164.00
EXERCISE NOTE BOOK AND OF... 7500 Nos. Exercise Note Books/Day and Offset Press for Printing Job Work 48.00 200.00
PAN MASALA, MEETHA, SADA,... 700 Kg./day 50.00 189.00
PAN MASALA SADA, MEETHA, ... (200 Kgs. Sada Masala, 200 Kgs. Meetha Masala, 500 Kgs. Zarda) Per Day 56.00 189.00
CAFFEINE FROM TEA WASTE 0.30 MT/day 45.00 138.00
Activated Carbon from Coc... 1.0 Tonnes/Day 47.21 108.00
Bleaching Powder 5 MT/Day 59.38 75.00
Cheese Analogues 1000 Kgs/Day 24.60 126.00
Sodium Hypochlorite (Blea... 10 Ton/Day 21.00 191.00
Setting Up Banana Ripenin... Ripe Banana 8 MT per day 23.00 193.00
A Business Plan Cosmetic... Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum 34.00 552.00
Business Plan for Baby Di... Pull-up Baby Pant Single Diaper (4 Pcs/Pkt): 60000 Pkt/day T-shape Open Style Baby Diaper (4 Pcs/Pkt 29.00 4178.00
Start Business of A2 Cow... A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P 25.00 484.00
HAND SANITIZER MANUFACTUR... Hand Sanitizer (50 ml size Bottles): 10,000 Bottle Per day 31.00 157.00
Biodegradable Plates & Bo... Bio-Degradable Areca Leaf Round Plates (Size 10"/12") 3,200.0 Pcs./Day Bio-Degradable Areca Leaf Rou 13.00 79.00
Dragon Fruits Farming 36,000 Kgs per annum 0.00 73.00
Dental Materials (Alginat... Composite Resin Poly Carboxylate Cement (500 gms Pack) : 80 Packs/ Day Glass Ionomer Cement ( 33.00 71.00
Infrared Reflected (IR) P... 300 Ltrs. /Day 26.00 196.00
123
« Back1 2Next »

Showing 1 - 60 of 84 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR