We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
TITANIUM DIOXIDE (ANATASE GRADE)
TITANIUM DIOXIDE (ANATASE GRADE)

The year 1992 will mark the start of the third century since the discovery of Titanium, stated to be the ninth most plentiful element in the earths... Read More

Capacity : 150 MT/Day
Plant and Machinery cost: 2000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):30.00 %
TCI :8500.00 Lakhs
Cost of Project : 8500.00Lakhs
Add To Inquiry Basket
Start a Business Of LPG Cylinders
Start a Business Of LPG Cylinders

LPG cylinders are pressurized containers and transport lique... Read More

Capacity : LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day
Plant and Machinery cost: 911.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 3475.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity : PP Woven Fabric 12 MT per day
Plant and Machinery cost: 943.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1637.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity : Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost: 962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2887.00Lakhs
Add To Inquiry Basket
Flat Glass Manufacturing Business
Flat Glass Manufacturing Business

 

Glass has a microscopic structure similar to that of a liquid, where the various components come together to... Read More

Capacity : 4000 Sq.Mtrs. per day
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):30.00 %
TCI :0.00 Lakhs
Cost of Project : 18700.00Lakhs
Add To Inquiry Basket
Poly-lactic Acid (PLA) - Polylactic Acid Manufacturing
Poly-lactic Acid (PLA) - Polylactic Acid Manufacturing

 

Poly-lactic acid (... Read More

Capacity : Polylactic Acid (PLA): 100 Ton / Day
Plant and Machinery cost: 23945.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 30838.00Lakhs
Add To Inquiry Basket
Production of Woven PP Cement Sacks
Production of Woven PP Cement Sacks

 

Woven polypropylene bags are ideal for transporting and packing bulk goods. Weaved polypropylene bags are th... Read More

Capacity : PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15
Plant and Machinery cost: 566.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):14.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 891.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost: 524.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.78%
Break Even Point (BEP):35.60 %
TCI :0.00 Lakhs
Cost of Project : 345.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2890.00Lakhs
Add To Inquiry Basket
Urea Fertilizer- Start Business in Fertilizer Industry
Urea Fertilizer- Start Business in Fertilizer Industry

Fertilizers provide three primary nutrients: Nitrogen (N), Phosphorus (P) and Potassium (K). Nitrogen supports vegetat... Read More

Capacity : Urea Fertilizer: 972.2 MT / Day
Plant and Machinery cost: 4320.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 15110.00Lakhs
Add To Inquiry Basket
Business Plan for Rewinding of Burnt Electric Motors
Business Plan for Rewinding of Burnt Electric Motors

Electric motors are relatively simple mechanical devices, given the sheer number of various motors and winding pattern... Read More

Capacity : Rewinding Brunt Electric Motors: 10 Nos./ Day
Plant and Machinery cost: 885.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 1320.00Lakhs
Add To Inquiry Basket
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity : Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr
Plant and Machinery cost: 1100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):15.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2006.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan-Dehydrated Onion
Manufacturing Business Plan-Dehydrated Onion

Onion is one of the most important commercial vegetable crops grown in India. Both immature and mature bulbs are used ... Read More

Capacity : Dehydrated Onion Sliced/Chopped: 50 MT / Day Cattle Feed as By Product: 35 MT / Day
Plant and Machinery cost: 2976.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 5116.00Lakhs
Add To Inquiry Basket
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE

Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enou... Read More

Capacity : 30,000 MT/ Annum each ores
Plant and Machinery cost: 896.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):49.00 %
TCI :3528.00 Lakhs
Cost of Project : 3528.00Lakhs
Add To Inquiry Basket
Manufacturing of Pasta and Macaroni
Manufacturing of Pasta and Macaroni

Pasta may be a food that's loved by people of all age bracket. It not just ea... Read More

Capacity : Pasta (1 Kg Pack): 13,000 Packs / Day Macaroni (1 Kg Pack) : 13,000 Packs / Day
Plant and Machinery cost: 863.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 1300.00Lakhs
Add To Inquiry Basket
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)

 

CPVC could be a high-temperature plastic pressure piping system introduced for ... Read More

Capacity : Chlorinated Polyvinyl Chloride: 80 MT/ Day
Plant and Machinery cost: 588.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2283.00Lakhs
Add To Inquiry Basket
Beer Production from Rice with Packaging in Can & Bottles
Beer Production from Rice with Packaging in Can & Bottles

Beer is distributed in bottles and cans and is additionally commonly available on draught, particularly in pubs and bars. The brewing industry may ... Read More

Capacity : Rice Beer (650 ml Bottle):12,924 No’s/Day Rice Beer (500 ml Can): 16,800 No’s/Day
Plant and Machinery cost: 2631.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 4596.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags from Corn Starch
Biodegradable Plastic Bags from Corn Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation charac... Read More

Capacity : Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day
Plant and Machinery cost: 1053.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1498.00Lakhs
Add To Inquiry Basket
Maize and It’s By Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)
Maize and It’s By Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)

Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total prod... Read More

Capacity : Maize Starch: 50 MT per day Sorbitol : 8.5 MT per day Liquid Glucose: 8.5 MT per day Dextrose Monohy
Plant and Machinery cost: 4670.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 6631.00Lakhs
Add To Inquiry Basket
Potato Flakes
Potato Flakes

The power of potato is known for sustaining millions of lives by providing food and nutrition during distress ti... Read More

Capacity : 10 MT per day
Plant and Machinery cost: 1653.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2093.00Lakhs
Add To Inquiry Basket
Mining of Mineral Ore with Processing and Beneficiation  for Production of Red Iron Oxide
Mining of Mineral Ore with Processing and Beneficiation for Production of Red Iron Oxide

Iron & steel is that the drive behind industrial development in any country. The vitality of the Iron & ... Read More

Capacity : Iron Ore: 2,400 MT / Day
Plant and Machinery cost: 527.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 1798.00Lakhs
Add To Inquiry Basket
Beer & Wine Manufacturing Plant
Beer & Wine Manufacturing Plant

Beer is that the world's oldest beverage, possibly dating back to the 6th millennium BC. It’s also the most wide... Read More

Capacity : Beer (650 ml size Bottle): 30,077 Bottles / Day Wine (750 ml size Bottle): 445 Bottles / Day
Plant and Machinery cost: 2086.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 3913.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

A condom is a thin, fitted tube. Condoms prevent pregnancies and STDs. They create a barrier that keeps semen an... Read More

Capacity : 500 Boxes per day
Plant and Machinery cost: 965.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1963.00Lakhs
Add To Inquiry Basket
Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding con... Read More

Capacity : 40000 Sq.mt. per day
Plant and Machinery cost: 944.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 1835.00Lakhs
Add To Inquiry Basket
Porcelain Insulators
Porcelain Insulators

An electrical insulator is a material whose internal electric charges do not flow freely, and therefore make it ... Read More

Capacity : Porcelain Insulators : 500.0 MT / day
Plant and Machinery cost: 695.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 2804.00Lakhs
Add To Inquiry Basket
Methanol from Bio-Waste
Methanol from Bio-Waste

Methanol is a clean burning drop in fuel which can replace both petrol & diesel in transportation & LPG,... Read More

Capacity : Methanol from Biowaste:100.0 MT / day
Plant and Machinery cost: 28700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):9.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 32721.00Lakhs
Add To Inquiry Basket
Craft Beer
Craft Beer

A microbrewery or craft brewery is a brewery that produces small amounts of beer (or sometimes root beer), typically m... Read More

Capacity : Craft Beer (Cans & Bottles 650 ml Size) : 9230 Nos./Day
Plant and Machinery cost: 890.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 1628.00Lakhs
Add To Inquiry Basket
Hydrogen Peroxide
Hydrogen Peroxide

Hydrogen peroxide (H2O2) is a very pale blue liquid which appears colorless in a dilute soluti... Read More

Capacity : 12,000 MT per annum
Plant and Machinery cost: 3932.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):34.00 %
TCI :0.00 Lakhs
Cost of Project : 5737.00Lakhs
Add To Inquiry Basket
Ferrosilicon
Ferrosilicon

Ferrosilicon is an alloy called silicon (Si02) with small percentage of Aluminium (Al203) and many other elements. Ferrosilicon is an alloy of iron... Read More

Capacity : 18,000 MT per annum
Plant and Machinery cost: 3694.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 6670.00Lakhs
Add To Inquiry Basket
Soda Ash (Light & Dense)
Soda Ash (Light & Dense)

Sodium carbonate (Na2CO3<... Read More

Capacity : Soda Ash Light: 300,000 MT per annum Soda Ash Dense: 300,000 MT per annum
Plant and Machinery cost: 12804.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 25704.00Lakhs
Add To Inquiry Basket
Citric Acid Monohydrate
Citric Acid Monohydrate

Citric acid monohydrate occurs as colourless crystals or as white, crystalline powder with a strongly acidic taste. It... Read More

Capacity : 3,000 MT per Annum
Plant and Machinery cost: 1204.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2166.00Lakhs
Add To Inquiry Basket
Polylactic Acid (PLA)
Polylactic Acid (PLA)

PLA is a unique polymer that in many ways behaves like PET, but also performs a lot like polypropylene (PP), a polyole... Read More

Capacity : 50000 MT/Annum
Plant and Machinery cost: 90680.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 144248.00Lakhs
Add To Inquiry Basket
Quartz Slabs
Quartz Slabs

Quartz slab is basically used primarily for kitchen countertops. Engineered quartz is a manmade product created mostly... Read More

Capacity : Quartz Slabs (3250 x 1650 x 15 mm) : 125 Nos./Day
Plant and Machinery cost: 1100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 2033.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates Using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates Using Sugarcane Bagasse

Sugarcane bagasse products are perfect solution for biodegradable food packaging which are environment friendly. These... Read More

Capacity : 2800 Kgs/Day
Plant and Machinery cost: 940.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 1369.00Lakhs
Add To Inquiry Basket
Ground Calcium Carbonate with 90% Brightness and Whiteness and > 90% CaCO3
Ground Calcium Carbonate with 90% Brightness and Whiteness and > 90% CaCO3

Ground calcium carbonate, commonly referred to as GCC in industrial applications, is widely used as a filler material.... Read More

Capacity : Ground Calcium Carbonate 5-10 Micron size : 200 MT/Day
Plant and Machinery cost: 1200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 2400.00Lakhs
Add To Inquiry Basket
Textile Industry (Cotton Fabric)
Textile Industry (Cotton Fabric)

A textile or cloth is a flexible woven material consisting of a network of natural or artificial fibres often referred... Read More

Capacity : 600000 Mtrs./Day
Plant and Machinery cost: 3306.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 36312.00Lakhs
Add To Inquiry Basket
Warehouse
Warehouse

Warehousing refers to the activities involving storage of goods on a large-scale in a systematic and orderly manner an... Read More

Capacity : 250000 Sacks/Day
Plant and Machinery cost: 1497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):28.00 %
TCI :0.00 Lakhs
Cost of Project : 14544.00Lakhs
Add To Inquiry Basket
Paper, Pulp and Paper Board from Bamboo
Paper, Pulp and Paper Board from Bamboo

Pulp is a raw material used in the manufacturing of paper. This material contains man-made, mineral or vegetable fiber... Read More

Capacity : Writing Paper : 100 MT/Day Paper Board : 100 MT/Day
Plant and Machinery cost: 3584.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 8929.00Lakhs
Add To Inquiry Basket
Fatty Alcohol
Fatty Alcohol

Fatty alcohols (or long-chain alcohols) are high-molecular-weight, straight-chain primary alcohols, but can also range... Read More

Capacity : Fatty Alcohol : 40 MT/Day Lauryl Alcohol (bye product) : 240 MT/Day Myrystyl Alcohol (bye prod
Plant and Machinery cost: 1287.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 4271.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are def... Read More

Capacity : 192000 Pkts/day
Plant and Machinery cost: 569.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 1486.00Lakhs
Add To Inquiry Basket
Soft Gelatin Capsules
Soft Gelatin Capsules

Soft gelatin (also called softgel or soft elastic) capsules consist of one piece hermetically-sealed soft shells. Soft... Read More

Capacity : 3120000Nos./Day
Plant and Machinery cost: 649.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):31.00 %
TCI :0.00 Lakhs
Cost of Project : 10871.00Lakhs
Add To Inquiry Basket
Kraft Paper
Kraft Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is a porous kraft paper with ... Read More

Capacity : Kraft Paper : 50 MT/day Duplex Board as by product : 9 MT/day
Plant and Machinery cost: 1069.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 2131.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Sleepers
Prestressed Concrete Sleepers

Prestressed concrete is that in which internal stresses are introduced to such a magnitude and distribution that the t... Read More

Capacity : 1000 Pcs./Day
Plant and Machinery cost: 1516.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):39.00 %
TCI :0.00 Lakhs
Cost of Project : 3058.00Lakhs
Add To Inquiry Basket
Optical Fiber Cable
Optical Fiber Cable

An optical fiber (or fiber) is a glass or plastic fiber that carries light along its length. Fiber optics is the overl... Read More

Capacity : 1000000 Kmtrs./Annum
Plant and Machinery cost: 1411.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 8342.00Lakhs
Add To Inquiry Basket
Gypsum Mining for Production of Plaster of Paris Powder
Gypsum Mining for Production of Plaster of Paris Powder

Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula CaSO4•2H2O. It is wide... Read More

Capacity : Gypsum Powder : 4800 MT/Day Plaster of Paris Powder : 7200 MT/Day
Plant and Machinery cost: 338700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):16.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 394800.00Lakhs
Add To Inquiry Basket
Craft Beer
Craft Beer

A microbrewery or craft brewery is a brewery that produces small amounts of beer (or sometimes root beer). The main ra... Read More

Capacity : 10000 Ltrs./Day
Plant and Machinery cost: 522.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1040.00Lakhs
Add To Inquiry Basket
Edible Oil Refinery from Crude Palm Oil
Edible Oil Refinery from Crude Palm Oil

Palm oil is edible oil which is extracted from the pulp of fruit of oil palms. The color of pulp is red. That's why cr... Read More

Capacity : 80 MT/Day
Plant and Machinery cost: 1087.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 5329.00Lakhs
Add To Inquiry Basket
Sulphuric Acid Plant
Sulphuric Acid Plant

Sulphuric Acid Plant

 

...
Read More
Capacity : Sulphuric Acid 98% : 150 MT/Day Oleum 65% : 50 MT/Day Oleum 23% : 60 MT/Day Chlorosulphonic Acid
Plant and Machinery cost: 1482.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):27.00 %
TCI :0.00 Lakhs
Cost of Project : 2357.00Lakhs
Add To Inquiry Basket
Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contribu... Read More

Capacity : 50000 Sq.mt./Day
Plant and Machinery cost: 1605.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 12502.00Lakhs
Add To Inquiry Basket
Baby Diaper and Sanitary Napkins
Baby Diaper and Sanitary Napkins

A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. Most materials in the diaper are held togethe... Read More

Capacity : Sanitary Napkins (8 Pcs/Pkt) : 31250 Packets/Day Baby Diapers (4 Pcs/Pkt) : 25000 Packets/Day
Plant and Machinery cost: 704.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 1331.00Lakhs
Add To Inquiry Basket
Mango Pulp Wit6h Cold Storage
Mango Pulp Wit6h Cold Storage

Mango Pulp is prepared from selected varieties of Fresh Mango Fruit. Fully matured Mangoes are harvested, quickly transported to the fruit processi... Read More

Capacity : Mango Pulp : 32.50 MT/Day Mango Concentrate : 16.25 MT/Day
Plant and Machinery cost: 1885.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 3232.00Lakhs
Add To Inquiry Basket
Glass Sheet
Glass Sheet

Glass is a transparent material, particularly in the visible region of electromagnetic spectrum. The transparent and colouration have made the glas... Read More

Capacity : 53550 MT./Annum
Plant and Machinery cost: 11100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 13900.00Lakhs
Add To Inquiry Basket
Discontinuous Sandwich Panel
Discontinuous Sandwich Panel

A sandwich panel is any structure made of three layers: a low-density core and a thin skin-layer bonded to each side. Sandw... Read More

Capacity : 1000000 Sq.mt. /Annum
Plant and Machinery cost: 7081.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 8431.00Lakhs
Add To Inquiry Basket
Curcumin Extraction Unit
Curcumin Extraction Unit

Curcumin is the main biologically active phytochemical compound of turmeric. It is extracted, concentrated, standard... Read More

Capacity : Curcumin Powder : 350 Kgs/day Turmeric Oil : 350 Kgs/day
Plant and Machinery cost: 593.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 1016.00Lakhs
Add To Inquiry Basket
Aluminium Collapsible Tubes
Aluminium Collapsible Tubes

A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, althoug... Read More

Capacity : 300000 Nos./day
Plant and Machinery cost: 4684.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):10.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 10012.00Lakhs
Add To Inquiry Basket
Fusion Bonded Epoxy Coating (FBE) on TMT Bars
Fusion Bonded Epoxy Coating (FBE) on TMT Bars

Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applie... Read More

Capacity : 72,000 MT/annum
Plant and Machinery cost: 768.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 2932.00Lakhs
Add To Inquiry Basket
Production of Aluminium Fluoride Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis
Production of Aluminium Fluoride Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis

Aluminium fluoride (AlF3) is an inorganic compound used primarily in the production of aluminium. This colorless solid can be prepared syntheticall... Read More

Capacity : Aluminium Fluoride: 60,000MT/annum Silica as bye product: 20,400MT/annum
Plant and Machinery cost: 1739.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 3496.00Lakhs
Add To Inquiry Basket
Kraft Paper From Waste Paper
Kraft Paper From Waste Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is... Read More

Capacity : 7500 MT/annum
Plant and Machinery cost: 914.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1756.00Lakhs
Add To Inquiry Basket
Poly Aluminium Chloride (Water Treatment Grade)
Poly Aluminium Chloride (Water Treatment Grade)

Poly aluminium chloride (PAC) is a general name given to poly aluminium chloride compounds, namely poly aluminium chloride ... Read More

Capacity : Poly Aluminium Chloride Liquid Form : 16,500 MT/Annum Poly Aluminium Chloride Powder Form :
Plant and Machinery cost: 1266.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 2418.00Lakhs
Add To Inquiry Basket
Aluminium Fluoride
Aluminium Fluoride

Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF... Read More

Capacity : Aluminium Fluoride : 60,000MT/annum Silica as bye product : 20,400MT/annum
Plant and Machinery cost: 1739.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 3496.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
TITANIUM DIOXIDE (ANATASE... 150 MT/Day 52.00 8500.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Manufacturing of PP... PP Woven Fabric 12 MT per day 27.00 1637.00
Start Production of Para... Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day 32.00 2887.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Poly-lactic Acid (PLA) - ... Polylactic Acid (PLA): 100 Ton / Day 26.00 30838.00
Production of Woven PP Ce... PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15 14.00 891.00
Setup a Manufacturing Pla... Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D 30.78 345.00
Disposable Nitrile Examin... Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day 30.00 2890.00
Urea Fertilizer- Start Bu... Urea Fertilizer: 972.2 MT / Day 27.00 15110.00
Business Plan for Rewindi... Rewinding Brunt Electric Motors: 10 Nos./ Day 27.00 1320.00
How to Start Disposable P... Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr 15.00 2006.00
Manufacturing Business Pl... Dehydrated Onion Sliced/Chopped: 50 MT / Day Cattle Feed as By Product: 35 MT / Day 27.00 5116.00
BENEFICIATION OF CHROMIUM... 30,000 MT/ Annum each ores 45.00 3528.00
Manufacturing of Pasta an... Pasta (1 Kg Pack): 13,000 Packs / Day Macaroni (1 Kg Pack) : 13,000 Packs / Day 12.00 1300.00
Manufacturing of CPVC (Ch... Chlorinated Polyvinyl Chloride: 80 MT/ Day 28.00 2283.00
Beer Production from Rice... Rice Beer (650 ml Bottle):12,924 No’s/Day Rice Beer (500 ml Can): 16,800 No’s/Day 27.00 4596.00
Biodegradable Plastic Bag... Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day 28.00 1498.00
Maize and It’s By Product... Maize Starch: 50 MT per day Sorbitol : 8.5 MT per day Liquid Glucose: 8.5 MT per day Dextrose Monohy 26.00 6631.00
Potato Flakes 10 MT per day 27.00 2093.00
Mining of Mineral Ore wit... Iron Ore: 2,400 MT / Day 30.00 1798.00
Beer & Wine Manufacturing... Beer (650 ml size Bottle): 30,077 Bottles / Day Wine (750 ml size Bottle): 445 Bottles / Day 30.00 3913.00
Condoms 500 Boxes per day 28.00 1963.00
Gypsum Plaster Board 40000 Sq.mt. per day 27.00 1835.00
Porcelain Insulators Porcelain Insulators : 500.0 MT / day 29.00 2804.00
Methanol from Bio-Waste Methanol from Biowaste:100.0 MT / day 9.00 32721.00
Craft Beer Craft Beer (Cans & Bottles 650 ml Size) : 9230 Nos./Day 27.00 1628.00
Hydrogen Peroxide 12,000 MT per annum 25.00 5737.00
Ferrosilicon 18,000 MT per annum 26.00 6670.00
Soda Ash (Light & Dense) Soda Ash Light: 300,000 MT per annum Soda Ash Dense: 300,000 MT per annum 28.00 25704.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 331 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR