Overview:

APIs are individual compounds or a blend of pharmacological or medical product-manufacturing ingredients. These medical molecules get generated by processes, including chemical synthesis, fermentation, extraction, or restoration of natural resources. 

The producers of active pharmaceutical ingredients may have varied cleaning needs in facilities dependent on the process stage of the cleaning and production of the following product. The manufacturer must show that cleaning and validation are appropriate based on each circumstance and a scientific explanation that is justified.

 

Here is all you need to know about the production of APIs.

 

Opportunities of API Manufacturing Industry:

 

India:

India has the most compliant pharmaceuticals factories outside the United States of America, according to the FDA. Indian pharmaceutical businesses create medicines for a fraction of their worldwide expense because of their low labor cost, infrastructure, and quality research capacity. 

Top MNCs like Pfizer, Merck, GSK, Sanofi Aventis, Novartis, Teva, and many more, depending on many of its APIs and intermediaries for Indian businesses. To enhance local productive capacity, the Indian pharmaceutical markets are supported by following production-linked incentives schemes.

 

Globally:

Promoting market expansion are favorable government policies for API generation and changes in geopolitical conditions. Due to COVID-19 supply chain disruption, the API industry is witnessing huge upheaval. 

Countries like India have been favored to China for API exports due to geopolitical circumstances and demands for API products to lessen their dependency on China. In addition, several nations' governments have established programs and given incentives for promoting API manufacturing. 

The high capital requirements for the creation of APIs are because the process requires very systematic procedures, which lead to the outsourcing of different APIs.

 

List of things we include while preparing Feasibility Study Report:

 

The practicality of the suggested plan or approach is essentially an assessment of a feasibility study. The list of things that we cover during the preparation of the feasibility study report is as follows:

 

Preliminary analysis:

Start with your plan. You should concentrate on our needs, a market in which demand exceeds supply, and the specific benefits of the product or service.

 

Projected Income:

Begin with what you estimate the project's revenue, and then what investment is required to reach this objective.

 

Market Research:

It is extremely vital to employ a company outside of your business if your corporation does not have the means to execute anything properly.

 

Operations:

The moment has come to establish the organization and operations of the intended company once the basis of earlier phases has been laid. The cost of startup, fixed capital, and operational charges should be detailed and inclusive.

 

Balance Sheet:

Create a list of goods, sources, costs, and funding available. Liabilities to consider include leasing or acquiring, financing of assets and accounts payable, land, buildings, and equipment.

 

Analysis of Data:

The evaluation and analysis are crucial to ensure that everything is as it should be and nothing has to be changed or modified.

 

Final Review:

Before making this binary decision, some other considerations include if the commitment pays for time, effort, and funding and is linked with the business's strategic objectives and long-term aspirations.

 

What will Business Plan for API Manufacturing Industry get included in our Project Report?

 

Pharmaceutical supply chains:

Significant capital requirements for producing APIs are because the process demands highly systematic protocols resulting in the externalization of different APIs. 

Moreover, pharmaceutical businesses gain from outsourcing API production by eliminating the requirement for costly installation and workforce of their production units. The demand for savings hence increases externalization. 

Strategic externalization of organizations helps them to concentrate on core competencies, thereby enhancing production. 

 

Balance sheet:

List of available products, sources, expenses, and financing. Passives include leases or acquisitions, financing of assets and accounts payable, land, constructions, and equipment.

 

Aspects of IPR-relevant trade:

As a result of COVID-19 supply chain disruption, the API industry is undergoing enormous changes. Countries like India have been favored to China for API exports due to geopolitical circumstances and demands for API products to lessen their dependency on China. In addition, several nations' governments have established programs and given incentives for promoting API manufacturing.

 

Evolve India:

In the world pharmaceutical business, India has a huge and quickly increasing position. It is the world's biggest supplier of generic pharmaceuticals with a 20% share of worldwide supplies and 62% of global demand for vaccines.

 

Key Market Trends for API Pharmaceutical Processing Plant:

 

The surge in demand:

In recent decades there has been an increase in the prevalence of chronic illnesses such as diabetes, coronary artery disease, COPD, asthma, hepatitis, arthritis, and cancer in vital regions worldwide.

 

Product Cost:

One of the largest issues facing market participants is the high cost to produce these APIs. Herstellers frequently need to invest expensive to enhance their production facilities so that requirements such as the cGMP.

 

Market biosimilar:

In the many therapeutic applications, the growing prevalence of various disorders, the increasing number of biological products available outside of the panel, the positive results of ongoing clinical biosimilars, and the increasing demand for biosimilars are vital drivers in biological growth.

 

Dividing APIs:

Based on the kind, the market gets divided into innovative and generic APIs for active pharmaceutical ingredients. The novel API sector has recently represented the greatest proportion of the world market for active pharmaceutical products.

 

Oncological demand:

The increase in demand for powerful APIs for cancer treatment in this market sector is driving growth.

 

Active Pharmaceutical Ingredient Manufacturing Process:

The API is not created by only one raw materials reaction, but rather by multiple chemical compounds it creates an API. The chemical compound is an API of the raw material gets referred to as an intermediate. Some APIs travel through more than ten kinds of intermediates when a raw material turns into an API. 

The extensive production process gets maintained to a very high degree of purity and purity. The production section subsequently produces huge reactors for any number of APIs. 

It is then tested for cleanliness before it gets sold to medication producers. If an API is not very pure, the drug does not fulfill the rigorous quality standards. The quality of an API, therefore, plays a crucial role.

 

The items you should remember throughout the API production are:

     Active component

     Fact Sheet for Active Pharmaceuticals

     Production of active pharmaceuticals

     Active pharmaceutical ingredients manufacture, process, or holding

     Good Guide for Active Pharmaceutical Ingredients for Manufacturing

     Sterile pharmaceutical active ingredients manufacture

 

API Manufacturing Industry FAQ:

     What are the driving forces in the production of APIs?

Increases in the production of active drugs (APIs) and the increasing incidence of chronic conditions, such as cardiovascular illnesses and cancer, might be due to the market expansion. Promoting market growth is favored by government policies for API manufacturing together with changes in geopolitical conditions.

 

     What is the largest share of the API market?

With a 72,8 percent interest in 2020, Synthetic APIs led the whole API industry. It is because raw materials are readily available, and methods to summarize these compounds are much simple.

 

Conclusion:

In short, we can state that expanding drug research and development efforts for drug manufacturing, the growing importance of generics, and the increasing use of biopharmaceuticals are crucial drivers supporting the expansion in the market for active pharmaceutical ingredients.

 

BB_20Art21


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Investment Opportunities in DCDA (Dicyandiamide)
Investment Opportunities in DCDA (Dicyandiamide)

Dicyandiamide is a strongly alkaline and water-soluble white crystalline compound with the scientific name of cyan guanidine. The chemical is the d... Read More

Capacity : Dicyandiamide (DCDA): 10 MT / Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 373.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity : Paracetamol Powder 7 MT Per Day
Plant and Machinery cost: 274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 779.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity : Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost: 1111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 5246.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity : Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost: 962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2887.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity : Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost: 155.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 729.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity : 600 kg/day
Plant and Machinery cost: 371.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. It ... Read More

Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum
Plant and Machinery cost: 349.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 863.00Lakhs
Add To Inquiry Basket
Ciprofloxacin HCl -Cipro
Ciprofloxacin HCl -Cipro
PRODUCT PROFILE Ciprofloxacin belongs to a class of drugs called quinolone antibiotics. It is a second generation fluoroquinolone antibacterial. It w... Read More
Capacity : 180 MT/ Annum
Plant and Machinery cost: 225.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):59.00 %
TCI :549.00 Lakhs
Cost of Project : 549.00Lakhs
Add To Inquiry Basket
Startup Opportunities in Active Pharma Ingredients
Startup Opportunities in Active Pharma Ingredients

 

Startup Opportunities in Active Pharma Ing... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

Active pharmaceutical ingredients are the active substances that are used in the manufacture of a drug and have ... Read More

Capacity : Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day
Plant and Machinery cost: 175.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1322.00Lakhs
Add To Inquiry Basket
API Production. Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol
API Production. Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol

API Production. Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol. Production of Active ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Sitagliptin (API) Business
Setup Sitagliptin (API) Business

 

Sitagliptin API, ... Read More

Capacity : Sitagliptin 10 MT Per Day By Products 10 MT Per Day
Plant and Machinery cost: 377.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 5217.00Lakhs
Add To Inquiry Basket
Aluminium Foil (Pharma Grade) Manufacturing Business
Aluminium Foil (Pharma Grade) Manufacturing Business

A thin metal sheet is aluminium foil. As a result, it can operate as a complete barrier to mould, moisture, gases, scents, ... Read More

Capacity : 12 MT per day
Plant and Machinery cost: 1500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2200.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient

Production of Ciprofloxacin Hydrochloride (CIPRO) - Active ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of DCDA - Dicyandiamide (2-Cyanoguanidine)
Production of DCDA - Dicyandiamide (2-Cyanoguanidine)

Production of DCDA - Dicyandiamide (2-Cyanoguanidine). Active Phar... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’
Vitamin ‘C’

Vitamin C is a physiological antioxidant of major importance for protection against diseases and degenerative processes caused by... Read More

Capacity : 2400 MT/annum
Plant and Machinery cost: 123.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

Paracetamol, also known as acetamino... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Pharmaceutical Unit (Tablets, Syrup & Injectables)
Pharmaceutical Unit (Tablets, Syrup & Injectables)

The Indian Pharmaceutical Industry today is in the front rank of India’s science-based industry with wide ranging capabilities i... Read More

Capacity : 69 Lakh Nos./Annum,Bruphen Tablets(10 Pcs):9 Lakh Nos./Annum (Strips),Paracetamol Syrup: 24 Lakh Nos
Plant and Machinery cost: 112.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):55.00 %
TCI :584.00 Lakhs
Cost of Project : 584.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

Paracetemol is an important intermediate in the manufacture of other pharmaceuticals like the antimalarial amodiaquine. Two types of paracetamol ar... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Ciprofloxacin
Ciprofloxacin

Ciprofloxacin is a broad-spe... Read More

Capacity : 300 Kgs./Day
Plant and Machinery cost: 44.00 Lakhs
Working Capital : 130.00
Rate of Return (ROR):66.49%
Break Even Point (BEP):35.01 %
TCI :231.00 Lakhs
Cost of Project : 231.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity : -
Plant and Machinery cost: 275.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 963.00Lakhs
Add To Inquiry Basket
Industrial Production of Ascorbic Acid Powder from Sorbitol Startup Business Opportunities for Entrepreneurs
Industrial Production of Ascorbic Acid Powder from Sorbitol Startup Business Opportunities for Entrepreneurs

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setting up Paracetamol Acetaminophen API Manufacturing Unit Rising Demand of Paracetamol Tablets in Covid-19 Pandemic
Setting up Paracetamol Acetaminophen API Manufacturing Unit Rising Demand of Paracetamol Tablets in Covid-19 Pandemic

Pain reliever and fever red... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

 

Active pharmaceutical ingredients are the active substances that are used in th... Read More

Capacity : Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg
Plant and Machinery cost: 175.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1322.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO)
Production of Ciprofloxacin Hydrochloride (CIPRO)

Ciprofloxacin may be a synthetic chemotherapeutic antibiotic of the fluoroquinolone drug class. It’s a second-generation fluoroquinolone anti... Read More

Capacity : Ciprofloxacin Hydrochloride : 600 Kegs’/Day
Plant and Machinery cost: 201.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 580.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity : Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost: 347.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1656.00Lakhs
Add To Inquiry Basket
Acyclovir
Acyclovir

Aciclovir (ACV), also known as acyclovir, is an antiviral medication. It is primarily used for the treatment of herpes... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Paracetamol (Acetaminophen) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis
Production of Paracetamol (Acetaminophen) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis

Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mi... Read More

Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum
Plant and Machinery cost: 349.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 863.00Lakhs
Add To Inquiry Basket
VITAMIN C
VITAMIN C
PRODUCT PROFILE Vitamin C is an essential nutrient for humans and certain other animal species. In living organisms ascorbate acts as an antioxidant ... Read More
Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

The development in pharmaceutical industry is very rapid and continuous research work throughout the world has resulted in a number of new medicine... Read More

Capacity : 500.00 KGS./day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business

Metformin (also known as Gl... Read More

Capacity : Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day
Plant and Machinery cost: 104.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 584.00Lakhs
Add To Inquiry Basket
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin

An active pharmaceutical in... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

 

Paracetamol (an i... Read More

Capacity : Paracetamol Tablets:5 MT per day Paracetamol Powder:1.4 MT per day
Plant and Machinery cost: 385.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 794.00Lakhs
Add To Inquiry Basket
Investment Business Idea in Vitamin C Manufacturing Plant
Investment Business Idea in Vitamin C Manufacturing Plant

Investment Business Idea in Vitamin C Manufacturing Plant. Start Own Industry of Ascorbic Acid manufacturing. Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Amoxicillin
Amoxicillin

Amoxicillin is an antibiotic often used for the treatment of a number of bacterial infections. It may be used for midd... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost: 448.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):44.00 %
TCI :958.00 Lakhs
Cost of Project : 958.00Lakhs
Add To Inquiry Basket
7 AMINOCEPHALOSPORANIC ACID (7 ACA)
7 AMINOCEPHALOSPORANIC ACID (7 ACA)
7 ACA or 7 Aminocephalosporanic acid is made from Cephalosporin C and is a key intermediate for synthesizing cephalosporin antibiotics, the B lactam ... Read More
Capacity : 150 MT/Annum
Plant and Machinery cost: 1486.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):64.00%
Break Even Point (BEP):42.00 %
TCI :2167.00 Lakhs
Cost of Project : 2167.00Lakhs
Add To Inquiry Basket
Paracetamol Used Phenol As Building Block
Paracetamol Used Phenol As Building Block

Block using purification of Para – Aminophenol (pap) antipyretic analgesic or febrifuges are remedial agents that lower the temp... Read More

Capacity : 5 Mt/Day
Plant and Machinery cost: 24500.33 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):53.00 %
TCI :1219.78 Lakhs
Cost of Project : 1219.78Lakhs
Add To Inquiry Basket
Vitamin C
Vitamin C
Vitamin is crucial component for good health.Vitamins are generated in the body itself however any irregularity or sickness disturbs this automatic ge... Read More
Capacity : 1870 MT/Annum
Plant and Machinery cost: 102.00 Lakhs
Working Capital : 135.00
Rate of Return (ROR):43.07%
Break Even Point (BEP):45.21 %
TCI :282.00 Lakhs
Cost of Project : 282.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Investment Opportunities ... Dicyandiamide (DCDA): 10 MT / Day 29.00 373.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Start Production of Para... Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day 32.00 2887.00
Active Pharma Ingredients... Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500 31.00 729.00
Vitamin ‘C’ Manufacturing... 600 kg/day 24.00 717.00
Paracetamol Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum 27.00 863.00
Ciprofloxacin HCl -Cipro 180 MT/ Annum 43.00 549.00
Startup Opportunities in ... 0 0.00 0.00
Active Pharma Ingredients... Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day 29.00 1322.00
API Production. Cephalexi... 0 0.00 0.00
Setup Sitagliptin (API) B... Sitagliptin 10 MT Per Day By Products 10 MT Per Day 34.00 5217.00
Aluminium Foil (Pharma Gr... 12 MT per day 27.00 2200.00
Emerging Business Investm... 0 0.00 0.00
Production of Ciprofloxac... 0 0.00 0.00
Production of DCDA - Dicy... 0 0.00 0.00
Vitamin ‘C’ 2400 MT/annum 29.00 563.00
Paracetamol 0 0.00 0.00
Pharmaceutical Unit (Tabl... 69 Lakh Nos./Annum,Bruphen Tablets(10 Pcs):9 Lakh Nos./Annum (Strips),Paracetamol Syrup: 24 Lakh Nos 27.00 584.00
Paracetamol 0 0.00 0.00
Ciprofloxacin 300 Kgs./Day 66.49 231.00
Active Pharmaceutical Ing... - 12.00 963.00
Industrial Production of ... 0 0.00 0.00
Setting up Paracetamol Ac... 0 0.00 0.00
Active Pharma Ingredients... Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg 29.00 1322.00
Production of Ciprofloxac... Ciprofloxacin Hydrochloride : 600 Kegs’/Day 27.00 580.00
Active Pharma Ingredients... Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen 32.00 1656.00
Acyclovir 0 0.00 0.00
Production of Paracetamol... Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum 27.00 863.00
VITAMIN C 0.00 0.00
12

Showing 40 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR