Reasons for Starting A Business in Malawi

The business environment has been favorable for private businesses in recent years, with economic growth rates averaging 6.7% between 2011 and 2014. The economy is expected to grow by 7.1% in 2015, making it one of Africa’s fastest growing economies. Foreign direct investment grew at an average rate of 19% per year between 2005 and 2013. As of October 2014, there were nearly 70 registered foreign companies operating in Malawi; most are engaged in mining or manufacturing.

 

 What are the Natural Resources In Malawi?

Bauxite, coal, tin, niobium, tantalum and timber are among Malawi’s key natural resources. The southern region also has large deposits of granite and marble. Alluvial gold is found along several rivers. There are some small salt deposits at Lake Nyasa. Diamonds have been discovered near Kasugai. Copper and nickel deposits have been located in Nkhotakota District. Several million tons of high-grade iron ore are located near Chitipa, which may be exploited when mining technology improves. Significant deposits of gypsum, limestone and silica sand exist in various parts of Malawi. In addition, there are known petroleum reserves off Lake Malawi that could prove valuable if exploration finds an economically viable method for extracting them. There are large undeveloped deposits of phosphates in Rumphi District. Additional deposits have been located on Zomba Plateau but they remain unexploited due to a lack of infrastructure. However, phosphate is obtained from seaweed collected on local beaches.

 

What are the Business Opportunities In Malawi

Many African countries who have achieved prosperity and could potentially offer a business opportunity as well. And one of these countries is known as Malawi. There are various industries that you can look into if you want to establish your own company

The International Finance Corporation of World Bank Group (IFC) estimates that 40 percent of people in Malawi survive on less than $1.25 per day, and only 9 percent of children under 5 are fully immunized. But its strategic location along Africa’s eastern coast, proximity to South Africa and Tanzania, and small population Malawi, a lots of business Opportunity country in south-eastern Africa, is blessed with vast natural resources and potential for economic growth. It has one of Africa’s largest forests, huge deposits of natural gas, coal, gold and other minerals that have attracted several investors from all over the world.

 

 Business-Friendly Policies and Government Initiatives;

With its beautiful beaches, world-class resorts and some of Africa’s best scuba diving and snorkeling, it might come as no surprise that Malawi is fast becoming an attractive destination for businesses seeking a tropical paradise on which to set up shop. The country offers low taxes, an educated workforce (98% literacy rate) and business-friendly policies that have helped it attract international firms like Mars Incorporated. As a result, Malawi has one of Africa’s fastest growing economies with GDP growth projected at 7.5% over 2015-2017. The first step to starting your own business in Malawi is obtaining a Certificate of Registration from the Registrar General’s Office within 30 days of arrival or prior to commencement of business activities. To apply for registration, you will need to provide:

1) A completed application form with supporting documents;

2) A non-refundable fee of MK100,000 (US$900); and

3) A copy of your passport. Once registered, you will be issued a certificate that must be displayed at all times when conducting business operations.

 

The first step to starting your own business in Malawi is obtaining a Certificate of Registration from the Registrar General’s Office within 30 days of arrival or prior to commencement of business activities.

 

What Are The Steps For Starting A Business In Malawi?

The first step for starting a business in Malawi is registering your business. For businesses with one or more employees, register at The National Investment Bank of Malawi. Fill out an application and submit it along with $200 as registration fee. For businesses without employees, register at The Development Bank of Southern Africa. Deposit $250 and make three checks payable to different government agencies involved in processing your license. Send these documents through DHL or post them physically to reach them within two weeks. Next, apply for licenses from various government agencies including: Ministry of Labor, Department of Trade and Industry (DTI), Ministry of Finance, Ministry of Justice and Constitutional Affairs, Department of Immigration Services (DIS), Malawi Revenue Authority (MRA) and others. Also obtain permits required by law such as: Fire Safety Certificate, Electrical Permit, Construction Permit and Environmental Impact Assessment Approval. You will also need to file for an Employer’s Registration Number which you can get from DTI. This number will be used when you pay taxes every month. Get insurance coverage before opening your doors to customers; you will need business interruption insurance and liability insurance among other types of coverage depending on what kind of business you run.

 

Is Malawi good for business?

Malawi is one of Africa’s countries. It borders Zambia, Tanzania, and Mozambique. The country has an abundance of natural resources, but as of now, isn’t using them. Corruption and economic mismanagement have left Malawi in poverty. According to UNICEF, more than 30% of people in Malawi live below the national poverty line; more than half are under 18 years old. The country faces drought conditions every year that make food scarce. However, according to Forbes magazine, there are many opportunities for businesses in Malawi because of its high unemployment rate (which makes workers cheap) and low cost of living. So if you want to start a business there, you should take advantage of these opportunities before they disappear!

 

Market size of Malawi

Malawi is one of Africa’s smallest economies. The country experienced rapid economic growth between 1995 and 2007, but its performance has declined since then. Inflation remains a problem; it was 10% on average from 2008 to 2013. Since 2012, inflation has averaged about 7%. Malawi’s economy relies heavily on agriculture. The sector accounts for roughly 40% of GDP and employs 80% of people who work in the formal economy. Agriculture also provides employment for more than half of all rural residents. Major export crops include tobacco, tea, sugarcane, corn (maize), and cotton. Major import commodities include petroleum products, foodstuffs, machinery and equipment, chemicals, textiles and clothing. The United States is Malawi’s largest trading partner; other major trading partners are South Africa and Tanzania.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Zero QI Pitch for Graphite
Zero QI Pitch for Graphite
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct ... Read More
Capacity : High Grade Pitch 35400 MT/Annum
Plant and Machinery cost: 875.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):49.00 %
TCI :1447.00 Lakhs
Cost of Project : 1447.00Lakhs
Add To Inquiry Basket
COAL BASED POWER PLANT (500 MW)
COAL BASED POWER PLANT (500 MW)

Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and... Read More

Capacity : 500 MW
Plant and Machinery cost: 143200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):56.00%
Break Even Point (BEP):25.00 %
TCI :158700.00 Lakhs
Cost of Project : 158700.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 3000000 Bottles/Annum
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):52.00 %
TCI :108.00 Lakhs
Cost of Project : 108.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 0
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):54.00 %
TCI :100.00 Lakhs
Cost of Project : 100.00Lakhs
Add To Inquiry Basket
FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste)
FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste)

Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly an... Read More

Capacity : 4800 MT/Annum
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):38.00 %
TCI :129.00 Lakhs
Cost of Project : 129.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity : 7500 Pcs./Annum
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):38.00 %
TCI :118.00 Lakhs
Cost of Project : 118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost: 41.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):25.00 %
TCI :923.00 Lakhs
Cost of Project : 923.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost: 128.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):72.00 %
TCI :570.00 Lakhs
Cost of Project : 570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity : 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):48.00 %
TCI :135.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite (By Calcination Process)
Alumina from Bauxite (By Calcination Process)

-

Read More
Capacity : 66.66 MT/Day
Plant and Machinery cost: 671.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):38.00 %
TCI :2112.00 Lakhs
Cost of Project : 2112.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity : 0
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):54.00 %
TCI :125.00 Lakhs
Cost of Project : 125.00Lakhs
Add To Inquiry Basket
WOODEN DOORS AND FRAMES
WOODEN DOORS AND FRAMES

Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such ... Read More

Capacity : 80 Pcs./day
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):42.00 %
TCI :93.00 Lakhs
Cost of Project : 93.00Lakhs
Add To Inquiry Basket
CALCIUM CARBONATE FROM LIME STONE
CALCIUM CARBONATE FROM LIME STONE

Calcium compounds such as calcium carbonate, calcium phosphate and calcium sulphate are widely distributed in nature. Calcium carbonate, CaCO3, for... Read More

Capacity : 20 MT/Day
Plant and Machinery cost: 64.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):81.00%
Break Even Point (BEP):33.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity : 1440 Cubie Meter/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):18.19%
Break Even Point (BEP):75.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)

The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating l... Read More

Capacity : 1500 Lacs/Annum
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):43.00 %
TCI :213.00 Lakhs
Cost of Project : 213.00Lakhs
Add To Inquiry Basket
Calcined Bauxite
Calcined Bauxite

The industry grow steadily based soundly on new and expanding markets created largely by its own study of the properties of aluminium and of the av... Read More

Capacity : 20000 MT/Annum
Plant and Machinery cost: 615.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.00%
Break Even Point (BEP):61.00 %
TCI :1898.00 Lakhs
Cost of Project : 1898.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Rolls & Facial Tissue
Paper Napkins, Toilet Rolls & Facial Tissue

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world with out a printed books and news... Read More

Capacity : 1000 Kgs/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 38.00
Rate of Return (ROR):96.61%
Break Even Point (BEP):25.40 %
TCI :53.00 Lakhs
Cost of Project : 53.00Lakhs
Add To Inquiry Basket
Calcium Carbonate from Marble Chips
Calcium Carbonate from Marble Chips

Marble is metamorphic, calcium carbonate of ultrafine, crystalline structure. It is used as building and ornamental stone (chips), artifical stone,... Read More

Capacity : 10.00 MT/Day
Plant and Machinery cost: 119.00 Lakhs
Working Capital : 69.00
Rate of Return (ROR):27.68%
Break Even Point (BEP):59.04 %
TCI :314.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Charcoal From Bagasse
Charcoal From Bagasse

Bagasse is one of the major by product of sugar crushing industries. Charcoal is a highly porous form of amorphous carbon. It is one of the half b... Read More

Capacity : 2.0 MT/Day
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 25.00
Rate of Return (ROR):26.41%
Break Even Point (BEP):62.20 %
TCI :154.00 Lakhs
Cost of Project : 154.00Lakhs
Add To Inquiry Basket
Artificial Marble Tiles
Artificial Marble Tiles

With the vast potential of plastics, artificial synthetic marble is virtually replacing the use of natural marble. The qualities of artificial synt... Read More

Capacity : 3 MT/Day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 54.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):49.00 %
TCI :121.00 Lakhs
Cost of Project : 121.00Lakhs
Add To Inquiry Basket
Granite Marble Cutting and Polishing Unit
Granite Marble Cutting and Polishing Unit

The use of granite and other decorative stones has been increasing world over. India is endowed with vast deposits of these natural resources and i... Read More

Capacity : 100 Sq. M./Day
Plant and Machinery cost: 168.00 Lakhs
Working Capital : 151.00
Rate of Return (ROR):47.73%
Break Even Point (BEP):42.87 %
TCI :388.00 Lakhs
Cost of Project : 388.00Lakhs
Add To Inquiry Basket
Aquaculture Fish Farming
Aquaculture Fish Farming

Aquaculture technology of sweet water fish farming is a good project for new entrepreneur and to meet up the demand growth of fish utilization.

Read More
Capacity : 1000 MT Fish/Annum
Plant and Machinery cost: 150.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):47.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity : 90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost: 1017.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 4978.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar photovoltaic (PV) modules electrically conne... Read More

Capacity : Solar Panel :83.3 KW / day
Plant and Machinery cost: 162.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 804.00Lakhs
Add To Inquiry Basket
Synthetic Soda Ash Production  from Limestone and Brine
Synthetic Soda Ash Production from Limestone and Brine

Soda ash is the trade name for sodium carbonate, a chemical refined from the mineral trona or sodium-carbonate-bearing... Read More

Capacity : Synthetic Soda Ash :60.0 MT / day Calcium Chloride : 48.0 MT/ day
Plant and Machinery cost: 685.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 2093.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity : L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost: 867.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity : Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity : Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity : Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost: 355.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity : Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost: 413.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity : Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost: 373.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity : -
Plant and Machinery cost: 1519.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity : Ammonium Nitrate 2 MT per Day
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity : Silicon Wafers 20 MT Per Day
Plant and Machinery cost: 2505.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity : -
Plant and Machinery cost: 189.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity : -
Plant and Machinery cost: 289.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity : -
Plant and Machinery cost: 1783.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity : Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost: 489.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

 

Laundry soap bars... Read More

Capacity : Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 65.00Lakhs
Add To Inquiry Basket
Start Business of Solar Panel
Start Business of Solar Panel

 

Solar panels are the bac... Read More

Capacity : Solar Panel 19,980 KW Per Annum
Plant and Machinery cost: 160.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 581.00Lakhs
Add To Inquiry Basket
A Business Plan for Calcium Gluconate
A Business Plan for Calcium Gluconate

Calcium Gluconate is a chemical compound that serves as a crucial supplement for thos... Read More

Capacity : Calcium Gluonate 20 MT Per Day
Plant and Machinery cost: 293.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 1130.00Lakhs
Add To Inquiry Basket
Start Business of Steel Containers (Cargo Containers)
Start Business of Steel Containers (Cargo Containers)

 

Explore the robust world of steel cargo containers used globally for shipping, storage, and modular construc... Read More

Capacity : Cargo Containers (Size 20 Feet) 40,000 Nos Per Annum
Plant and Machinery cost: 300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 3105.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Ready to Eat Food (Retort Packaging) Vegetable Pulao, Dal Makhani, Palak, Rajma, Potato Peas and Muutter Mushroom)
Set Up Ready to Eat Food (Retort Packaging) Vegetable Pulao, Dal Makhani, Palak, Rajma, Potato Peas and Muutter Mushroom)

RTE food includes wide range of products viz. vegetarian/non- vegetarian, basic food/delectable desserts, south ... Read More

Capacity : 0
Plant and Machinery cost: 331.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 718.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity : Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity : Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost: 449.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity : Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity : Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost: 1924.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity : Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost: 800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Low Relaxation Pre Stressed Concrete Steel Strand (LRPC) Most Profitable and High Demandable Business of Low Relaxation Pre-Stressed Concrete Steel Strand (LRPC)
Manufacturing Business of Low Relaxation Pre Stressed Concrete Steel Strand (LRPC) Most Profitable and High Demandable Business of Low Relaxation Pre-Stressed Concrete Steel Strand (LRPC)

A high-grade, low-relaxation, 7-strand steel cord known as pre-stressed concrete strand (PC strand) is used to reinfor... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity : 5,000 MT Per Annum
Plant and Machinery cost: 2206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity : 1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost: 107.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Recovery of Fe2O3 & TiO2 ... Ferric Oxide (Fe2O3): 27,000 MT per Annum Titanium Dioxide (TiO2): 9,000 MT per Annum Remains Mate 29.00 1741.00
Active Pharma Ingredients... Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500 31.00 729.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
12345678910...

Showing 421 - 480 of 648 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR