Reasons for Starting a Business in Rwanda:

The Rwandan economy is growing largely due to foreign investment and exports, mainly focused on manufacturing. Other sectors are growing as well but not at such high rates as manufacturing; these include telecommunications, construction and business services.


What are the Natural Resources in Rwanda?

Rwanda’s Lake Kivu was estimated to contain 60 billion m3 of natural gas that was in great demand by companies planning to construct gas-fired power stations. In 2010, natural gas was extracted by Kibuye Power 1 Ltd. from Lake Kivu. Rwanda Investment Group S.A. planned to provide a capacity of 3.6 MW to a gas-fired power station using the natural gas from Lake Kivu.

In 2010, Kivuwatt Ltd. also planned to construct a gas-fired power station and extract natural gas from Lake Kivu. Gold exploration activities were carried out by Trans Africa Resources Ltd. in the Gicumbi District. In 2010, the company estimated that this site had resources that amounted to 5.55 million Mt at a grade of 1.48 g per Mt gold. Mining is an important contributor to the country’s economy, generating about US$ 90 million in 2008.

Minerals extracted in Rwanda include tantalum, tin ore, tungsten, and gold. The minerals are mainly produced by private companies and artisanal miners. Cassiterite, tungsten, and tantalite are mined by at least 283 companies and artisanal miners.


What are the Business Opportunities in Rwanda?

1. One of the most lucrative businesses in Rwanda is agriculture. Like many other countries in Africa, Rwanda is rich in natural edible resources. The process of exporting unprocessed commodities such as coffee beans and raw cocoa annually has provided Africa, in general, with thousands of job opportunities, raking in billions of dollars in potential income.


2. Many farmers and entrepreneurs in Rwanda have created businesses that fill the gap in both local and international markets through the development of uniquely African product brands. These brands are processed so that they have the potential to become significant hit products on the market.

Some of these are 'Made in Africa' organic chocolate brands and chocolate bars made from cocoa beans, which are harvested and processed within the continent. These chocolate bars are then exported internationally, raising thousands of dollars from international investors.


3. Coffee beans. The world's largest coffee producer is found in Africa, no, it's not Starbucks. By investing in locally processed coffee beans, you help in the creation of more reliable product brands that can compete on the same level as foreign competitors.

This is one of Rwanda's key priorities and a significant contributor to its economy. The business of exports in Rwanda builds a number of profitable businesses while supporting national development. Your business can be managed from abroad with ease, making it perfect for the African diaspora.

With exports, you also get to provide services to your clientele, which may be located in the UK, US, Dubai, or the Americas. Furthermore, in Rwanda, there are many lucrative export businesses you can invest in, but the route that offers you a lot of opportunities is coffee.

In Sub-Saharan Africa, Rwanda is recognized as a major conference and convention hub, second to South Africa. Considering how small the nation is, such a position is imposing. It also means that for investors, conference tourism is another business opportunity they can venture into.


4. The growing demand for apartments and hotels in Rwanda stems from the rise in global business travel, corporate mobility, and an increase in international job assignments. As the rise of businesses and investment opportunities in Africa continues to attract global players across the globe, it is safe to say that the demand for sophisticated, massive and well-scaled apartment hotels will also rise, causing a boom in the real estate niche.

There are several Business Opportunities in Rwanda, and in Africa as a whole. The best thing to do, is research lucrative sectors, to find out how they work and the best investment methods to consider.


What Businesses are Successful in Namibia?

Before you can start your own business, it’s important to understand what type of business ventures are likely to be successful in your region. This information can help you better evaluate an idea for a new business and/or predict potential problems or challenges you may face.

The following businesses have been successful historically, based on location and economic conditions: Retail stores; Restaurants/bars; Entertainment (e.g., clubs, hotels); Travel services (e.g., guides, taxis) If you're looking to set up shop online, e-commerce is a great option for many entrepreneurs as well.

 

Business-Friendly Policies and Government Initiatives:

Starting up a business in Rwanda may seem like an easy feat, but without proper regulatory frameworks, you might have trouble getting your idea off the ground. Fortunately, Rwanda’s government is showing signs of improvement when it comes to business-friendly policies. While licensing and tax policies are still somewhat nascent, startups can seek support from several institutions.

In Rwanda’s government made it easier for businesses to register property. Among other reforms, they abolished capital gains taxes Rwanda’s government has made a concerted effort to encourage foreign investment and business development through new policies, laws, and tax incentives.

Rwanda is ranked as one of Africa’s fastest-growing economies; according to World Bank data, between 2010 and 2013, annual growth was 5.8 percent—well above East Africa’s regional average of 4.5 percent.

Rwanda Industrial Infrastructure:

Rwanda understands the importance of infrastructure in the development of a competitive private sector. To this end, the government continues to invest heavily in infrastructure. Almost a tenth of Rwanda’s annual budget is committed to transport and other infrastructure. To develop a vibrant private sector, Rwanda is investing in Roads, Rail, and water transport infrastructure with the intent of dramatically reducing the cost of transport to businesses and individuals.

Rwanda has been very successful in supporting structural change the movement of economic resources out of agriculture into more productive sectors (industry and services). However, aggregate productivity growth, one of the most important elements of having a successful business is having access to reliable infrastructure. In most parts of Africa, it’s rare for businesses and homes to have consistent access to reliable electricity, internet and phone service. This is especially true for those in rural areas. However, Rwanda has recently taken steps to create more consistent industrial infrastructure across its entire country. The Rwandan government launched an initiative called Vision 2020 that aims to make Rwanda one of Africa’s leading economies by 2020.

Part of that plan includes building out a national network of power lines that can deliver energy reliably across all regions. The government also plans on expanding fiber optic cables and other communication networks so that people living in rural areas will be able to connect with others around them and access information online. Finally, they want to expand their road system so transportation between cities is easier than ever before.

What are the steps for Starting a Business in Rwanda?

To start a business you must meet certain requirements and there are specific procedures you must follow. The following guide will provide detailed information on how to start your own business in Rwanda. Before you can register a company, you need to be. You also need to have lived in Rwanda for at least one year before registering a company here. If you do not meet these criteria, then an individual who meets them can act as your representative (this is called being authorized).

This person needs their own authorization letter from you stating that they have been given power of attorney over all matters related to starting up your business. The   steps to Starting a Business in Rwanda:  Register with relevant government agencies: If you want to start your own business, there are several steps that must be taken before officially launching your venture.

First, register with all relevant government agencies such as local tax offices and trade bureaus. In Rwanda, these include: Ministry of Trade (MOT) Ministry of Finance (MOF) National Bank of Rwanda (BNR) 2Obtain required permits and licenses: Once you’ve registered with government agencies, you’ll need to obtain any required permits or licenses from them—this will vary depending .

Market Size of Rwanda:

The Rwandan economy is characterized by remittances, agriculture, and coffee and tea exports. In 2010 coffee production was estimated at 28% of total export earnings. Other crops include beans, sorghum, potatoes, bananas, and cassava. Industrial activity centers on construction materials (lumber and bricks), food processing, metal fabrication for machinery and equipment, textiles, sugar refining, cement production and light manufacturing (bottles).

A third of all households engage in subsistence farming. It’s estimated that there are approximately 800,000 broadband internet users in Rwanda. The majority of Rwandans live on less than $2 USD per day, making it extremely difficult for most people to afford goods and services beyond what is absolutely necessary The Rwandan economy is dominated by agriculture, which accounts for about three-quarters of GDP and employs 85% of its labor force.

Coffee, tea, pyrethrum (insecticide), and cotton are Rwanda's main cash crops. Tourism is an increasingly important sector and is encouraged by government tax incentives. According to official statistics tourism receipts doubled from US$17 million in 1995 to US$35 million in 1998.

 

Industrial Growth:

The Rwandan economy is one of Africa’s fastest growing, with growth averaging over 6% per year since 2005. The country has great potential for both service and industrial development. Industries that are currently booming include information technology (IT), agro processing, light manufacturing, tourism and energy. In Rwanda was ranked as the best place to do business in Africa by Forbes magazine.

Rwanda is also considered one of the most transparent countries on earth, ranking 20th out of 175 on Transparency International’s Corruption Perceptions Index This makes it an attractive prospect for foreign investment from companies who want to set up operations there but don’t want corruption issues to get in their way.

Despite these positive factors, however, starting a Business in Rwanda isn’t easy. There are many things you need to consider before you begin your journey.

 

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit

Vehicle recycling is the de... Read More

Capacity : -
Plant and Machinery cost: 300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2500.00Lakhs
Add To Inquiry Basket
Badminton Rackets Manufacturing Business
Badminton Rackets Manufacturing Business

Badminton rackets productio... Read More

Capacity : 1000 Pcs Per Day
Plant and Machinery cost: 81.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 353.00Lakhs
Add To Inquiry Basket
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap

Cold rolling is a work hard... Read More

Capacity : -
Plant and Machinery cost: 2400.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 8300.00Lakhs
Add To Inquiry Basket
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan

Children's clothing may not... Read More

Capacity : T-Shirts: 84 Pcs. per day | Bottom Wear: 84 Pcs. per day
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):74.00 %
TCI :0.00 Lakhs
Cost of Project : 68.00Lakhs
Add To Inquiry Basket
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business

 

Start Traction Motors Permanent Magnet Synchronous Motors, Br... Read More

Capacity : Permanent Magnet Synchronious Motors (5 KW, 48/72 Volt with 3000 RPM) 40 Nos. Per Day Brushless
Plant and Machinery cost: 114.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 510.00Lakhs
Add To Inquiry Basket
Dental Care Products GI Cement & Composite Lite Cure Business Plan
Dental Care Products GI Cement & Composite Lite Cure Business Plan

Consider starting a glass i... Read More

Capacity : GI Cement (Part A Powder 5 gms each & Part B Liquid 5 ml each) 20000 Pcs. per Day | Compsite Lite Cu
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):74.00 %
TCI :0.00 Lakhs
Cost of Project : 340.00Lakhs
Add To Inquiry Basket
Citric Acid Production Business Plan
Citric Acid Production Business Plan

Citrus fruits have a sour t... Read More

Capacity : 100 MT Per Day
Plant and Machinery cost: 8400.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 13200.00Lakhs
Add To Inquiry Basket
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business

A Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Epoxy Hardener Plant
Set Up Epoxy Hardener Plant

In order to create an epoxy resin for its intended use, epoxy hardeners are nearly always required. Epoxies do not com... Read More

Capacity : Polyamide Hardener: 6 MT per Day Cycloaliphatic Amine Hardener:1.2 MT per Day
Plant and Machinery cost: 400.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1300.00Lakhs
Add To Inquiry Basket
ZINC INGOTS Manufacturing Business Plan
ZINC INGOTS Manufacturing Business Plan

 

Zn, zinc is a chemical element. At normal temperature, zinc is a slightly brittle metal that, when its oxida... Read More

Capacity : 6 MT per Day
Plant and Machinery cost: 4500000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 52500000.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity : 100 CBM per Day
Plant and Machinery cost: 1800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 3100.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Surgical Products (Surgical Absorbable Suture, Non Absorbable Suture,  Surgical Mesh, Bone Wax, C Section Kits,  Surgical Glue & Surgical Stapling)
Business Plan for Production of Surgical Products (Surgical Absorbable Suture, Non Absorbable Suture, Surgical Mesh, Bone Wax, C Section Kits, Surgical Glue & Surgical Stapling)

Choosing surgical items wisely will help you avoid wasting money or purchasing subpar equipment. Surgical products are an e... Read More

Capacity : 0
Plant and Machinery cost: 6900000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1800.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica From Rice Husk Ash
A Business Plan for Silica From Rice Husk Ash

 

The high silica content in the rice husk ash has attract... Read More

Capacity : 0
Plant and Machinery cost: 745.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 1288.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules

 

Biodegradable plastic is plastic that decomposes naturally in t... Read More

Capacity : 0
Plant and Machinery cost: 101.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):75.00 %
TCI :0.00 Lakhs
Cost of Project : 324.00Lakhs
Add To Inquiry Basket
Red Chilli Oleoresin Manufacturing Business
Red Chilli Oleoresin Manufacturing Business

 

Chili oleoresin is a natural extract of chili pepp... Read More

Capacity : Chilli Oleoresin 6,250 Kg Per Day
Plant and Machinery cost: 1988.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 3250.00Lakhs
Add To Inquiry Basket
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)

Since the 1950s, Low Relaxation Pre-stressed Concrete Steel ... Read More

Capacity : Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC)
Plant and Machinery cost: 3561.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 5370.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder Production Business
Moringa Leaf Powder Production Business

 

India is the prime producer of Moringa (Drumstick) with an annual production of... Read More

Capacity : Moringa Leaf Powder 1,000 Kg Per Day
Plant and Machinery cost: 55.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 189.00Lakhs
Add To Inquiry Basket
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages

Aluminium cans and easy open end (EOE) for beverages are a t... Read More

Capacity : Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day
Plant and Machinery cost: 46000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):27.00 %
TCI :0.00 Lakhs
Cost of Project : 72100.00Lakhs
Add To Inquiry Basket
Production Business Of Medium-Density Polyethylene (MDPE) Pipes
Production Business Of Medium-Density Polyethylene (MDPE) Pipes

Medium-density polyethylene (MDPE) is a type of polyethylene... Read More

Capacity : MDPE Pipes 5,400 Kgs per day
Plant and Machinery cost: 94.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 376.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing

The Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant

The oil-soluble red chilli extract known as Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel

Energy production using Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Copper Powder  Using Electrolytic Copper Refining and  Water Atomization Technology
Copper Powder Using Electrolytic Copper Refining and Water Atomization Technology

Copper powder is an essenti... Read More

Capacity : 1,20,000 Kgs Per Annum
Plant and Machinery cost: 170.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 338.00Lakhs
Add To Inquiry Basket
ISO Freight Containers
ISO Freight Containers

 

An ISO freight co... Read More

Capacity : 15,000 Nos. Per Annum 15,000 Nos. Per Annum
Plant and Machinery cost: 4560.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 9658.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Potassium Permanganate
Manufacturing Business of Potassium Permanganate

 

Potassium permang... Read More

Capacity : 5,000 MT Per Annum
Plant and Machinery cost: 176.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1287.00Lakhs
Add To Inquiry Basket
Start a Business Of Ethyl Acetate
Start a Business Of Ethyl Acetate

 

Ethyl Acetate, al... Read More

Capacity : 30,000 MT Per Annum
Plant and Machinery cost: 2665.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):39.00 %
TCI :0.00 Lakhs
Cost of Project : 7206.00Lakhs
Add To Inquiry Basket
Manufacturing Plant of Copper Powder Using Electrolytic Copper Refining and Water Atomization Best Famous and Popular Industry Business Plan of Copper Powder Using Electrolytic Copper Refining and Water Atomization
Manufacturing Plant of Copper Powder Using Electrolytic Copper Refining and Water Atomization Best Famous and Popular Industry Business Plan of Copper Powder Using Electrolytic Copper Refining and Water Atomization

By running an electric current through Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)

In order to make a distinctive and delectable blend, different teas, including ... Read More

Capacity : -
Plant and Machinery cost: 41.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 242.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Blood Bags
Start Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity : Blood Bags 10,000 Nos per day
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):75.00 %
TCI :0.00 Lakhs
Cost of Project : 1092.00Lakhs
Add To Inquiry Basket
Start Production of Decorative Laminated Sheet (Sunmica)
Start Production of Decorative Laminated Sheet (Sunmica)

Decorative laminated sheet is a versatile material used in the manufacturing of various produ... Read More

Capacity : Decorative Laminated Sheet (Sunmica) 5,000,000 Sq.Mt. Per Annum
Plant and Machinery cost: 1130.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):63.00%
Break Even Point (BEP):34.00 %
TCI :0.00 Lakhs
Cost of Project : 2257.00Lakhs
Add To Inquiry Basket
Copper Tube Fittings Manufacturing Business
Copper Tube Fittings Manufacturing Business

Copper Tube Fittings (Elbows 45 Deg., 90 Deg., Long Radius Elbows, Couplings,... Read More

Capacity : Copper Tube Fittings 600 MT Per Annum Copper Scrap 24 MT Per Annum
Plant and Machinery cost: 214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 675.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant

Pharmaceutical tablets are one of the most commonly used dosage forms in medicine. Th... Read More

Capacity : -
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 786.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream and Shampoo
Start Industry with Serum, Cream and Shampoo

Why The Beauty Industry Is... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan For Bottling of Refined Oil •	Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil
A Business Plan For Bottling of Refined Oil • Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging high-quality, processed oi... Read More

Capacity : -
Plant and Machinery cost: 402.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 1975.00Lakhs
Add To Inquiry Basket
Start Production Of Graphite From Graphite Deposits
Start Production Of Graphite From Graphite Deposits

Graphite is a mineral that ... Read More

Capacity : Graphite Powder 10 MT Per Day
Plant and Machinery cost: 513.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1998.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Cement Paper Bags with Printing Unit
Start Manufacturing Business Of Cement Paper Bags with Printing Unit

 

Cement Paper Bags with Printing are a popular ... Read More

Capacity : Cement Paper Bag 50 Kgs Size 1,250 Th.Nos. Per Day Cement Paper Bag 25 Kgs Size 1,250 Th.Nos. Per
Plant and Machinery cost: 3600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 22800.00Lakhs
Add To Inquiry Basket
Setup Plant of  Biodegradable Corn Starch Granules, Bags, Plates & Cups
Setup Plant of Biodegradable Corn Starch Granules, Bags, Plates & Cups

Biodegradable corn starch products are a new innovation that ... Read More

Capacity : -
Plant and Machinery cost: 440.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1427.00Lakhs
Add To Inquiry Basket
Setup Unit Of Aluminium Extrusion Plant
Setup Unit Of Aluminium Extrusion Plant

 

Aluminium extrusi... Read More

Capacity : Aluminium Extruded Products 10 MT per day
Plant and Machinery cost: 234.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 901.00Lakhs
Add To Inquiry Basket
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully

Lead from galena refers to the ex... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)

Analytical testing labs are facilities that specialize in tes... Read More

Capacity : -
Plant and Machinery cost: 410.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 646.00Lakhs
Add To Inquiry Basket
Invest In Kraft Paper From Pulp  Industry
Invest In Kraft Paper From Pulp Industry

 

Kraft paper, also... Read More

Capacity : Kraft Paper 20 MT Per Day
Plant and Machinery cost: 2002.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 4040.00Lakhs
Add To Inquiry Basket
Start Carton Boxes Manufacturing Business
Start Carton Boxes Manufacturing Business

Carton boxes, also known as corrugated boxes, are commonly used in packaging and ship... Read More

Capacity : Carton Boxes 40 MT Per Day
Plant and Machinery cost: 409.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 2071.00Lakhs
Add To Inquiry Basket
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant

 

Essential oils and oleoresins are concentrated... Read More

Capacity : -
Plant and Machinery cost: 934.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 1479.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Solar PV Glass
Start Manufacturing Business Of Solar PV Glass

Solar PV Glass, also known as photovoltaic gl... Read More

Capacity : Solar PV (Photovoltaic) Glass 300 MT per Day
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 4150.00Lakhs
Add To Inquiry Basket
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)

Are you curious about what exactly a Truck Tr... Read More

Capacity : Cost Estimation Capacity: Flatbed Trailer 6 Nos per Day Tipper Trailer 6 Nos per Day
Plant and Machinery cost: 313.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 1172.00Lakhs
Add To Inquiry Basket
Liquid Caustic Soda Industry (From Caustic Flakes)
Liquid Caustic Soda Industry (From Caustic Flakes)

Liquid caustic soda, also known as sodium hydroxide, is a powerful and versatile chem... Read More

Capacity : Liquid Caustic Soda Lye 48% 80 MT Per Day
Plant and Machinery cost: 305.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 888.00Lakhs
Add To Inquiry Basket
A Business Plan For Red Oxide Pigment
A Business Plan For Red Oxide Pigment

Red oxide pigment, also kno... Read More

Capacity : Red Oxide Pigment 200 MT Per Day
Plant and Machinery cost: 5081.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 6945.00Lakhs
Add To Inquiry Basket
A Business Plan For Linear Alkyl Benzene
A Business Plan For Linear Alkyl Benzene

Linear Alkyl Benzene (LAB) is a versatile chemical compound that pl... Read More

Capacity : Linear Alkyl Benzene 20 MT Per Day
Plant and Machinery cost: 340.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):68.00 %
TCI :0.00 Lakhs
Cost of Project : 832.00Lakhs
Add To Inquiry Basket
Invest In Methylaniline Business
Invest In Methylaniline Business

Methylaniline is a clear to... Read More

Capacity : Methylaniline 40 MT Per Day
Plant and Machinery cost: 730.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2056.00Lakhs
Add To Inquiry Basket
Invest In Alloy Wheel Business for Two Wheelers
Invest In Alloy Wheel Business for Two Wheelers

Alloy wheels for two-wheele... Read More

Capacity : Alloy Wheel for 2 Wheeler 400 Pcs Per Day
Plant and Machinery cost: 157.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 802.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity : -
Plant and Machinery cost: 1064.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 3229.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Medical Disposables Gowns and Drapes
Start Manufacturing of Medical Disposables Gowns and Drapes

 

Surgical gowns ar... Read More

Capacity : Medical Gowns 1,250 Pcs Per Day Medical Drapes 1,250 Pcs Per Day
Plant and Machinery cost: 286.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 611.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business

Metformin (also known as Gl... Read More

Capacity : Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day
Plant and Machinery cost: 104.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 584.00Lakhs
Add To Inquiry Basket
Profitable Business of Lithium Ion Battery Pack
Profitable Business of Lithium Ion Battery Pack

In a lithium ion (li-ion) b... Read More

Capacity : Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K
Plant and Machinery cost: 3600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 5000.00Lakhs
Add To Inquiry Basket
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business plan of Auto Piston
Manufacturing Business plan of Auto Piston

 

Automotive piston... Read More

Capacity : 0
Plant and Machinery cost: 348.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):31.00 %
TCI :0.00 Lakhs
Cost of Project : 2890.00Lakhs
Add To Inquiry Basket
Start manufacturing business of Chocolate
Start manufacturing business of Chocolate

 

Chocolate is a de... Read More

Capacity : 0
Plant and Machinery cost: 162.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 496.00Lakhs
Add To Inquiry Basket
Recycled Polyester Fiber from used PET Bottles Manufacturing Business
Recycled Polyester Fiber from used PET Bottles Manufacturing Business

 

Recycled polyester fiber is made by recycling ... Read More

Capacity : Recycled Polyester Fiber 1,500,000 Kgs Per Annum
Plant and Machinery cost: 76.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 393.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
12345678910...

Showing 181 - 240 of 575 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR