We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
A Business Plan for Lithium Ion Battery (Battery Assembly)
A Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion ... Read More

Capacity : -
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 516.00Lakhs
Add To Inquiry Basket
Start Production Of Glass Sheet
Start Production Of Glass Sheet

Glass sheet is a type of glass that has been pro... Read More

Capacity : Glass Sheet: 1,500,000 Sq.mt. Per Annum
Plant and Machinery cost: 9000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 12900.00Lakhs
Add To Inquiry Basket
India Sugarcane Bagasse Biodegradable Disposable Tableware Market
India Sugarcane Bagasse Biodegradable Disposable Tableware Market

Sugarcane Bagasse Biodegradable Disposable Tableware is a typ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A business plan  For Cardanol From Cashew Nut Shell Oil
A business plan For Cardanol From Cashew Nut Shell Oil

 

Card... Read More

Capacity : Cardanol 24 MT Per Day
Plant and Machinery cost: 152.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 658.00Lakhs
Add To Inquiry Basket
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)

Truck trailers are an essential part of any frei... Read More

Capacity : -
Plant and Machinery cost: 313.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)

Premix Tea and... Read More

Capacity : -
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 119.00Lakhs
Add To Inquiry Basket
Start production of Biodegradable Disposable  Cups and Plates (Tableware) Using Sugarcane Bagasse
Start production of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

Bagasse is the fibrous residue that remains afte... Read More

Capacity : -
Plant and Machinery cost: 1924.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 2687.00Lakhs
Add To Inquiry Basket
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant

 

Product:

<...
Read More
Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production of Ceramic Wall and Floor Tiles
Start Production of Ceramic Wall and Floor Tiles

Ceramic wall and floor tiles are a popular choice for a wide variety of applications, from residential to... Read More

Capacity : Ceramic Wall & Floor Tiles 6,000 Sq.MT. Per Day
Plant and Machinery cost: 2724.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 5543.00Lakhs
Add To Inquiry Basket
A Business Plan  For Tantalum Powder from Tantalite Ore
A Business Plan For Tantalum Powder from Tantalite Ore

Tantalum is a rare transition metal that is mined from columbite-tantalite, which is an ore found in vari... Read More

Capacity : Tantalum Powder 4 MT Per Day
Plant and Machinery cost: 235.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1935.00Lakhs
Add To Inquiry Basket
Setup Plant OF Mica Powder From Mica Deposits
Setup Plant OF Mica Powder From Mica Deposits

Mica powder is a fine, powdery mineral that is made from mica deposits. Mica is a type of natural rock th... Read More

Capacity : Mica Powder 40 MT Per Day
Plant and Machinery cost: 296.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 2684.00Lakhs
Add To Inquiry Basket
Setup plant  Of Ferric Pyrophosphate (Food Grade and Pharma Gade)
Setup plant Of Ferric Pyrophosphate (Food Grade and Pharma Gade)

Ferric pyrophosphate is a phosphate-iron compound that is used as a food additive, dietary supplement and in p... Read More

Capacity : Ferric Pyrophosphate Anhydrous 420 MT Per Annum (Food Grade) Ferric Pyrophosphate Nonhydrate 1
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 96.00Lakhs
Add To Inquiry Basket
Start Industry Of Chocolate
Start Industry Of Chocolate

Chocolate is a universally beloved food item made from cocoa ... Read More

Capacity : Chocolate 1,000 Kg. Per Day
Plant and Machinery cost: 120.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 815.00Lakhs
Add To Inquiry Basket
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant

Yeast from Molasses (Dry & Compressed Yeast) is a specialized type of yeast that ... Read More

Capacity : Compressed Yeast 5,000 Kgs per day Dry Yeast 5,000 Kgs per day
Plant and Machinery cost: 2000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2800.00Lakhs
Add To Inquiry Basket
Setup Industry  Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump
Setup Industry Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump

The connecting rod is an es... Read More

Capacity : Connected Rod MK2 for Hand Pump 540,000 Pcs Per Annum MS Scrap 120 Pcs Per Annum
Plant and Machinery cost: 18.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 195.00Lakhs
Add To Inquiry Basket
Start Production Of Lawn Tennis Ball
Start Production Of Lawn Tennis Ball

The "lawn tennis ball," a specific ball, is the one used to p... Read More

Capacity : Tennis Ball 10,000 Nos. per day
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 168.00Lakhs
Add To Inquiry Basket
Setup Plant Of Chlorinated Polyvinyl Chloride
Setup Plant Of Chlorinated Polyvinyl Chloride

Chlorinating the vinyl chloride monomer produces chlorinated polyvinyl chloride (CPVC... Read More

Capacity : Chlorinated Polyvinyl Chloride 6,000 MT per Annum
Plant and Machinery cost: 396.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1279.00Lakhs
Add To Inquiry Basket
Start Production Of PP Woven Bags
Start Production Of PP Woven Bags

Polypropylene woven bags, sometimes referred to as PP woven bags, are a kind of packa... Read More

Capacity : PP Bags (L-915 x W-610 mm) (Per Bag Weight App. 90 gms) 100,000 Nos per day
Plant and Machinery cost: 1263.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 2314.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch

Environmentally friendly alternatives to conventional plastic... Read More

Capacity : Biodegradable Plastic Bags (Per Bag 25 gms Size) 12 MT per day
Plant and Machinery cost: 1053.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1498.00Lakhs
Add To Inquiry Basket
How to Setup Lawn Tennis Ball Plant
How to Setup Lawn Tennis Ball Plant

Tennis is a well-known sport, and the little, spherical, fuzzy yell... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan  Cosmetic Unit (Serum, Cream & Shampoo)
A Business Plan Cosmetic Unit (Serum, Cream & Shampoo)

A cosmetic unit typically includes a serum, cream, and shampoo that work together to hydrate, nourish, and protect your skin and hair. Serums are l... Read More

Capacity : Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 552.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Tin From Cassiterite
Start Manufacturing Business Of Tin From Cassiterite

Tin is an important metal that has played a crucial role in our society for centuries... Read More

Capacity : Tin Ingot 6 MT Per Day
Plant and Machinery cost: 616.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 2279.00Lakhs
Add To Inquiry Basket
Freeze Dried Products Manufacturing - Fruits & Vegetables (Dry Banana, Mango, Custurd Apple, Beetroot, Sapota, Dragon Fruit, Jamun and Green Peas)
Freeze Dried Products Manufacturing - Fruits & Vegetables (Dry Banana, Mango, Custurd Apple, Beetroot, Sapota, Dragon Fruit, Jamun and Green Peas)

Freeze-drying, technically referred to as Lyophilization, may be a process of sublimation where water m... Read More

Capacity : Freeze Dried Raw Banana: 19 Kgs / Day Freeze Dried Mango: 19 Kgs / Day Freeze Dried Custurd Apple:
Plant and Machinery cost: 95.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 199.00Lakhs
Add To Inquiry Basket
Production of Freeze Dried Fruits & Vegetables
Production of Freeze Dried Fruits & Vegetables

Production of Freeze Dried Fruits & Vegetables (Dry Ban... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Emerging Investment Opportunities in Production Business of Glucose Saline (Intravenous Sugar Solution) IV fluids Used in Hospitals, Nursing Homes
Emerging Investment Opportunities in Production Business of Glucose Saline (Intravenous Sugar Solution) IV fluids Used in Hospitals, Nursing Homes

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables

 

A Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Demanding Business of E-Rickshaw Assembling
Demanding Business of E-Rickshaw Assembling

E Rickshaws are three wheel ... Read More

Capacity : 200 Nos per day
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):68.00 %
TCI :0.00 Lakhs
Cost of Project : 2580.00Lakhs
Add To Inquiry Basket
Detailed Project Report on E-Waste Recycling Plant
Detailed Project Report on E-Waste Recycling Plant

Electronic wastes, "e-waste... Read More

Capacity : Plastic: 1.60 MT per day Ferrous Material: 1.00 MT per day, Aluminium: 0.70 MT per day, Glass: 1.00
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are t... Read More

Capacity : 150 Nos per day
Plant and Machinery cost: 155.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 708.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity : Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost: 87.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 371.00Lakhs
Add To Inquiry Basket
Start Lovastatin Production business  (from Dextrose, Peptone Powder, Sugar & Soyabean)
Start Lovastatin Production business (from Dextrose, Peptone Powder, Sugar & Soyabean)

Lovastatin is a drug that l... Read More

Capacity : 240 MT Per Annum
Plant and Machinery cost: 1200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 2700.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan

 

Introduct... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and  Furnace Heat Recycling inside the Plant) Production Business
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and Furnace Heat Recycling inside the Plant) Production Business

 

Float glass typically has a compressive strength that is substantially higher than its tensile strength. In ... Read More

Capacity : 8000 Sq.Mtrs. per Day
Plant and Machinery cost: 20600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):27.00 %
TCI :0.00 Lakhs
Cost of Project : 27000.00Lakhs
Add To Inquiry Basket
Aluminium Foil (Pharma Grade) Manufacturing Business
Aluminium Foil (Pharma Grade) Manufacturing Business

A thin metal sheet is aluminium foil. As a result, it can operate as a complete barrier to mould, moisture, gases, scents, ... Read More

Capacity : 12 MT per day
Plant and Machinery cost: 1500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2200.00Lakhs
Add To Inquiry Basket
Set up Sugar Plant
Set up Sugar Plant

 

A sweet, crystalline material made from sugar cane and sugar beet is referred to as sugar. It has countless ... Read More

Capacity : 0
Plant and Machinery cost: 14900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 24300.00Lakhs
Add To Inquiry Basket
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business

Rebar made of glass fibre reinforced polymer is a highly valuable building material. Governments and other large-scale... Read More

Capacity : 1200 MT per Day
Plant and Machinery cost: 58800000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 609700000.00Lakhs
Add To Inquiry Basket
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
India Hydrofluorocarbons Market
India Hydrofluorocarbons Market

 

Hydrofluorocarbons, or HFCs, are man-made Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Chilli Oleoresin Manufacturing Business
Chilli Oleoresin Manufacturing Business

Paprika oleoresin is a natural food colorant used to obtain ... Read More

Capacity : Chilli Oleoresin 7,500 Kg Per Day
Plant and Machinery cost: 2192.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 3533.00Lakhs
Add To Inquiry Basket
Setting Up Banana Ripening Chamber
Setting Up Banana Ripening Chamber

A banana ripening chamber is a controlled environment where ... Read More

Capacity : Ripe Banana 8 MT per day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 193.00Lakhs
Add To Inquiry Basket
Set up Mini Steel Plant (Billets and TMT Bar)
Set up Mini Steel Plant (Billets and TMT Bar)

 

A mini steel plant is a smaller version of an inte... Read More

Capacity : Steel Billets 150 MT Per Day TMT Steel Bars (Rebar) 150 MT Per Day
Plant and Machinery cost: 5445.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 10417.00Lakhs
Add To Inquiry Basket
Start Creamy Peanut Butter Production Business
Start Creamy Peanut Butter Production Business

Creamy peanut butter is a type of peanut butter that has bee... Read More

Capacity : Creamy Peanut Butter 10,000 Kgs per day
Plant and Machinery cost: 128.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 1038.00Lakhs
Add To Inquiry Basket
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)

 

An electric vehicle is a vehicle that uses electricity to power its motors. Ele... Read More

Capacity : Electric Motorbikes 10.0 Nos. Per Day Electric Scooters 10.0 Nos. Per Day
Plant and Machinery cost: 251.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 1724.00Lakhs
Add To Inquiry Basket
Setting up uPVC and CPVC Pipes Business
Setting up uPVC and CPVC Pipes Business

 

uPVC is an acronym for un-plasticized polyvinyl chloride. It is also known as r... Read More

Capacity : CPVC Pipes 50 mm 4 MT Per Day uPVC Pipes 150 mm 8 MT Per Day
Plant and Machinery cost: 313.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 414.00Lakhs
Add To Inquiry Basket
Fertilizers Manufacturing Handbook
Fertilizers Manufacturing Handbook

Starting a fertilizer manuf... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots

Zinc ingots... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing

One of the finest ways to get a professional paint finish is with <... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business

 

How do Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan For Curcumin Extraction Unit
A Business Plan For Curcumin Extraction Unit

 

Curcumin Extracti... Read More

Capacity : 15,000 Kgs Per Annum , 7,140 Kgs Per Annum , , 2,76,300 Kgs Per Annum
Plant and Machinery cost: 216.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):18.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 511.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity : 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):74.00 %
TCI :0.00 Lakhs
Cost of Project : 44.00Lakhs
Add To Inquiry Basket
Start a Business of Production for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse Lucrative Business Idea of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
Start a Business of Production for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse Lucrative Business Idea of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

Bio plastic, a polymer prod... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan of Compostable Bio-Degradable Plastic Polymer from Corn Bio-Degradable Plastic Polymer from Corn Production Plant
Business Plan of Compostable Bio-Degradable Plastic Polymer from Corn Bio-Degradable Plastic Polymer from Corn Production Plant

 

Plastics that decompose naturally into substances like carbon dioxide, water, and biomass are called ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World

 

A solar panel is ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business of Medical Disposables Gowns and Drapes
Business of Medical Disposables Gowns and Drapes

 

Surgical gowns mu... Read More

Capacity : Medical Gowns: 1,250 Pcs per Day Medical Drapes: 1,250 Pcs per Day
Plant and Machinery cost: 209.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.54%
Break Even Point (BEP):55.16 %
TCI :0.00 Lakhs
Cost of Project : 529.00Lakhs
Add To Inquiry Basket
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes


Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan to Make Money from Lemon Grass Essential Oil Extraction
Business Plan to Make Money from Lemon Grass Essential Oil Extraction

Lemongrass oil (Cymbopogon ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Crumb Rubber Powder From Waste Tyres
Production of Crumb Rubber Powder From Waste Tyres

 

Crumb rubber is a... Read More

Capacity : Crumb Rubber Powder 24 MT per day By Product Steel Wire 4.8 MT per day
Plant and Machinery cost: 115.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 426.00Lakhs
Add To Inquiry Basket
Opportunities in Business of Disposable Plastic Syringes
Opportunities in Business of Disposable Plastic Syringes

 

Disposable Syring... Read More

Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 62,500 Nos Per Day Dis
Plant and Machinery cost: 441.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2149.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Citric Acid Production from Corn
Citric Acid Production from Corn

Citric acid is described as “nature's acidulate”, occurring during a wide variety of plants, citrus fruits... Read More

Capacity : Citric Acid : 20 MT / Day Animal Feed bye product: 15.2 MT / Day Gluten bye product: 7.3 MT / Day
Plant and Machinery cost: 1799.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 3559.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
12345678910...

Showing 301 - 360 of 760 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR