The versatility of epoxy resins and their popularity in many fields like construction, automotive, and electronics, have made them a valuable product. For entrepreneurs and start-ups, manufacturing epoxy resin is a great avenue due to the profitability and versatility of the product, as well as the rapidly growing demand.
Manufacturing epoxy resins is a business with a promising future:
1. Constant Demand For All Industries:
Epoxy resins have a wide range of applications due to their excellent adhesion and resistance to heat and chemicals. The construction industry uses epoxy resins to make protective coatings and epoxy flooring. In electronics epoxy resins and coatings are used to encapsulate and protect components. Because of its lightweight, strong, and heat resistant properties, epoxy is also used in automotive and aerospace applications.
2. High Demand, Sizeable Market:
The global epoxy resin industry was valued at roughly $9 billion in 2023, and has a projected growth rate of \6\% till 2030. Rapid demand is coming from China and India in the Asia Pacific region, due to large-scale industrialization and infrastructure needs, creating and excellent opportunities for new manufacturing companies.
3. Ability to Export:
Epoxy resin is also in high demand in North America, Europe, and the Middle East, and therefore, are easy to export. Because of India's location and inexpensive production costs, entrepreneurs can manufacture epoxy resins competitively and expand to the global market.
4. Stability from Multiple Applications:
The varied end-use industries for epoxy resins provide protection from single market dependence. From adhesives used in packaging, to wind turbine blades in renewable energy, and in other markets, demand stays consistent despite lost economic conditions.
Market Trends and Analysis
1. Sustainability and Innovation:
The epoxy resin industry is developing in response to increasing environmental concerns in pursuit of new and innovative greenery and bio-based alternatives. Those in the industry with a focus on developing sustainable new-innovations will have potential to set themselves apart from competitors.
2. Infrastructure Boom:
Countries in developing phases of growth like epoxy resin-based goods for construction with flooring, coatings, and structural composites to grow their infrastructure.
3. Need for Lightweight:
The automotive and aerospace markets have a strong focus on the use of epoxy resins to produce lightweight construction materials to support their performance and fuel efficiency goals.
4. Electronics Revolution: Epoxy resins, through their use in potting, encapsulation, and printed circuit boards (PCBs) have become critical in the rapidly growing markets of IoT, 5G technology, and miniaturized electronics.
Reasons to Invest in the Epoxy Resin Industry
1. i. "The epoxy resin market is highly lucrative for manufacturers as it offers. the best profit margins from relatively low production costs. P
2. i. With demand for epoxy resins increasing rapidly, new manufacturers have the option to launch their business on a small scale, ensuring they successfully meet demand.
3. i. A range of supportive policies like monetary incentives to entrepreneurs at MSME (Micro, Small, and Medium Enterprises) scale for state sponsored manufacturing, and policies that promote exports, create a business-friendly environment for this type of manufacturing in India.
4. Low Risk of Obsolescence
Resins are a well-established product with various industries, and are likely to experience unchanged or growing demand for many more years.
Market Overview and Export Opportunities
There are plenty of construction, electronics manufacturing, and renewable energy opportunities for investment in Indian epoxy resins. Additionally, there are plenty of export opportunities to developed nations.
Governments are encouraging the use of lightweight materials in the automotive and renewable industries. This Opens the market for ends users of epoxy resins. Entrepreneurs can produce quality epoxy resins and take a big chunk of the market.
Conclusion
Epoxy manufacturing is a good investment due to the high demand, diverse applications and global market opportunity. The industry serves manufacturing and construction of advanced, growing, and critical infrastructure. Quality manufacturing of epoxy resins, combined with entrepreneurial spirit, will guarantee great rewards.
| Plant capacity | Plant & machinery | Working capital | Cost of Project | T.C.I | Return | Break even |
|---|---|---|---|---|---|---|
| Epoxy Resin (Liquid): 4 MT Per Day | 181 | N/A | 550 | 29 | 49 |
| COST OF PROJECT | MEANS OF FINANCE | ||||||
| Particulars | Existing | Proposed | Total | Particulars | Existing | Proposed | Total |
| Land & Site Development Exp. | ********** | ********** | ********** | Capital | ********** | ********** | ********** |
| Buildings | ********** | ********** | ********** | Share Premium | ********** | ********** | ********** |
| Plant & Machineries | ********** | ********** | ********** | Other Type Share Capital | ********** | ********** | ********** |
| Motor Vehicles | ********** | ********** | ********** | Reserves & Surplus | ********** | ********** | ********** |
| Office Automation Equipments | ********** | ********** | ********** | Cash Subsidy | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | Internal Cash Accruals | ********** | ********** | ********** |
| Franchise & Other Deposits | ********** | ********** | ********** | Long/Medium Term Borrowings | ********** | ********** | ********** |
| Preliminary& Pre-operative Exp | ********** | ********** | ********** | Debentures / Bonds | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** | Unsecured Loans/Deposits | ********** | ********** | ********** |
| Margin Money - Working Capital | ********** | ********** | ********** | ********** | ********** | ********** | |
| TOTAL | ********** | ********** | ********** | TOTAL | ********** | ********** | ********** |
| Particulars | Existing | Proposed | Total |
| COST OF PROJECT | |||
| Land & Site Development Exp. | |||
| Land Area Required | ********** | ********** | ********** |
| Land Development Cost, Boundary Wall, Gate & Road etc. | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Buildings | ********** | ********** | ********** |
| Factory Building - | ********** | ********** | ********** |
| Office Buildings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Plant & Machineries | ********** | ********** | ********** |
| Indigenous Machineries | ********** | ********** | ********** |
| Erection & Installation | ********** | ********** | ********** |
| Laboratory Equipments | ********** | ********** | ********** |
| Miscellaneous Equipments like pumps, valves, pipeline & fittings | ********** | ********** | ********** |
| Imported Machineries | ********** | ********** | ********** |
| Technical know how | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Office Vehicles | ********** | ********** | ********** |
| Office Automation Equipments (Telephone/ Fax/ Computer) | ********** | ********** | ********** |
| Office Equipment, Furniture plus Other Equipment & Accessories | ********** | ********** | ********** |
| Other Misc. Assets | ********** | ********** | ********** |
| Pre-operative & Preliminary Expenses | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Capital Cost of Project | ********** | ********** | ********** |
| Margin Money for Working Capital | ********** | ********** | ********** |
| Total Cost of Project | ********** | ********** | ********** |
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| ********** | ********** | ********** | ********** | ********** | |
| Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| Gross Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Less : Excise Duties/Levies | ********** | ********** | ********** | ********** | ********** |
| Net Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Total Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Expenses/Cost of Products/Services/Items | ********** | ********** | ********** | ********** | ********** |
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** |
| Indigenous | ********** | ********** | ********** | ********** | ********** |
| Total Nett Consumption | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** |
| Sub Total of Net Consumption | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expenses | ********** | ********** | ********** | ********** | ********** |
| Depreciation | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance Exp. | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** |
| Cost of Output of Goods Sold | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Gross Profit | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowing | ********** | ********** | ********** | ********** | ********** |
| On Wkg. Capital Borrowings | ********** | ********** | ********** | ********** | ********** |
| Total Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** |
| Total Cost of Sales | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** |
| Tax on Profit | ********** | ********** | ********** | ********** | ********** |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Depreciation Added Back | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Net Cash Accruals | ********** | ********** | ********** | ********** | ********** |
| Particulars | Stk.Prd. | Stk.Prd. | Operating Years | |||||
| 1st Year | 2nd Yr&+ | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Capacity | Months | Months | % | ********** | ********** | ********** | ********** | ********** |
| CURRENT ASSETS | ********** | ********** | ********** | ********** | ********** | |||
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** | |||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | |||
| Indigenous | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Packing Material | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Consumable Store | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Work-in-Process | ********** | ********** | D | ********** | ********** | ********** | ********** | ********** |
| Finished Goods | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Current Expenses | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | ||
| Total | ********** | ********** | ********** | ********** | ********** | |||
| Cash/Bank Balances | ********** | ********** | ********** | ********** | ********** | |||
| Gross Wkg. Capital | ********** | ********** | ********** | ********** | ********** | |||
| ********** | ********** | ********** | ********** | ********** | ||||
| Particulars | Operating Years | |||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Profit Percentages to Net Sales | ||||||
| Gross Profit | ********** | ********** | ********** | ********** | ********** | |
| % Of G.P. to Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.B.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.A.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ||||||
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Exp | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ||||||
| Repayment of Long/Medium Ter | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** | |
| Parameters | ||||||
| Initial Equity Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Credit Balance in P & L | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Capital excl Unsec Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Equity incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings from Bank | ********** | ********** | ********** | ********** | ********** | ********** |
| Term lia. Incl Unsecured Deposit | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ||||||
| i.e.Total Term Lia./NW | ||||||
| Unsecured Dep. as Equity | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. as Debt | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | |
| Assets Turnover Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| No. of Shares of 10.00 each | ********** | ********** | ********** | ********** | ********** | |
| Earnings Per Share (EPS) (in `) | ********** | ********** | ********** | ********** | ********** | |
| Proposed divident | ********** | ********** | ********** | ********** | ********** | |
| Cash EPS (in `) | ********** | ********** | ********** | ********** | ********** | |
| Dividend Per Share(DPS) (in `) | ********** | ********** | ********** | ********** | ********** | |
| Payout Ratio (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings/Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Book Value Per Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Debt Per Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Probable Mkt.Price/Share(in `) | ********** | ********** | ********** | ********** | ********** | |
| Price / Book Value (x) | ********** | ********** | ********** | ********** | ********** | |
| Price Earnings Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| Yield (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Particulars | Operating Years | |||||
| Ratio | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| BREAK EVEN ANALYSIS | ||||||
| Total Value of Output | ********** | ********** | ********** | ********** | ********** | |
| Variable Cost & Expenses | ||||||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Sales Commission/Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Sub-total | ********** | ********** | ********** | ********** | ********** | |
| Less:W.I.P. Adjustments | ********** | ********** | ********** | ********** | ********** | |
| Total Variable Cost | ********** | ********** | ********** | ********** | ********** | |
| Net Contribution | ********** | ********** | ********** | ********** | ********** | |
| Profit Volume Ratio (%) | ********** | ********** | ********** | ********** | ********** | |
| Semi-Var./Semi-Fixed Exp. | ||||||
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Interest on Wkg.Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Semi-Var./Fixed Exp. | ********** | ********** | ********** | ********** | ********** | |
| ********** | ||||||
| Fixed Expenses / Cost | ********** | |||||
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Fixed Borrowing | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Working Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Deferred Expenses W/Off | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Fixed Expenses | ********** | ********** | ********** | ********** | ********** | |
| Tot.Fixed/Semi-Fixed Exp | ********** | ********** | ********** | ********** | ********** | |
| Tot.Cash Fixed/SemiFixed | ********** | ********** | ********** | ********** | ********** | |
| Cash Break Even Sales | ********** | ********** | ********** | ********** | ********** | |
| Cash Margin of Safety | ********** | ********** | ********** | ********** | ********** | |
| Break Even Sales | ********** | ********** | ********** | ********** | ********** | |
| Margin of safety | ********** | ********** | ********** | ********** | ********** | |
| At Maximum Utilisation : | Year | ********** | ********** | ********** | ********** | ********** |
| (as % of Installed Capacity) | ||||||
| Cash B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| Equity Share Capital | ********** | ********** | ********** |
| Others - Preference Share Capital | ********** | ********** | ********** |
| Total Equity Share Capital | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Long/Medium Term Borrowings | ********** | ********** | ********** |
| FROM BANK | ********** | ********** | ********** |
| From Other Financial Institutions | ********** | ********** | ********** |
| Total Long/Medium Term Borrowings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Means of Finance | ********** | ********** | ********** |
| A | Name of Institution-Bank | ABC BANK | |
| B | Term Borrowing Amount | ********** | xx |
| C | Repayment Term (Years) | ********** | Years |
| D | Repayment Instalments | ********** | Instalments |
| E | Repayment Commencement | Year - 0; 3rd Qtr. | |
| F | Rate of Interest(General) | xxxx% | p.a. |
| F | Rate of Interest(Initial) | 0.00% | p.a. |
| G | Apply Gen. Int. Rate from Year | x Quarter :: x | |
| H | Interest Calculation | Quarterly |
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Expenses | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ********** | ********** | ********** | ********** | ********** | |
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| ********** | ********** | ********** | ********** | ********** | ||
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** |
| Operating Year | F.Assets Type A-1 | F.Assets Type A-2 | F.Assets Type B | F.Assets Type C | F.Assets Type D-1 | F.Assets Type D-2 | Total |
| Particulars | Factory Building - | Office Buildings | PLANT & MACHINERY | Office Vehicles | Office Automation Equipments (Telephone/ Fax/ Computer) | Furniture & Fixtures | |
| 1-2 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 2-3 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 3-4 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 4-5 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 5-6 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Particulars | Method | Deprn.Rate | Part Consideration (for Asset put to use less than xx months) | ||||
| Type A :: Buildings | |||||||
| Factory Building - | WDV | ********** | ********** | ||||
| Office Buildings | WDV | ********** | ********** | ||||
| Type C | |||||||
| Office Vehicles | WDV | ********** | ********** | ||||
| Type D :: Misc. Fixed Assets | |||||||
| Office Automation Equipments (Telephone/ Fax/ Computer) | WDV | ********** | ********** | ||||
| Furniture & Fixtures | WDV | ********** | ********** |
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Year | 1 | 2 | 3 | 4 | 5 |
| Initial Investment | ********* | ||||
| Total Initial Investment | ********* | ||||
| Yearly Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Pay Back Period | xx Years xx Months | xx Years xx months | |||
| Year | CFAT | PV factor @**% | ********* |
| Initial Investment | ********* | ********* | ********* |
| 1-2 | ********* | ********* | ********* |
| 2-3 | ********* | ********* | ********* |
| 3-4 | ********* | ********* | ********* |
| 4-5 | ********* | ********* | ********* |
| 5-6 | ********* | ********* | ********* |
| Total PV | ********* | ********* | |
| IRR | ********* | ********* | |
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Equity Share Capital | ********** | ********** | ********** | ********** | ********** |
| Surplus of Previous Year | ********** | ********** | ********** | ********** | ********** |
| Add : Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Surplus at the End of Year | ********** | ********** | ********** | ********** | ********** |
| Unsecured Deposits | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings Proposed-FROM BANK | ********** | ********** | ********** | ********** | ********** |
| Bank Borrowing for Wkg. Capital | ********** | ********** | ********** | ********** | ********** |
| Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Sundry Creditors | ********** | ********** | ********** | ********** | ********** |
| Other Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Total Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Liabilities | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| A S S E T S | ********** | ********** | ********** | ********** | ********** |
| Fixed Assets | ********** | ********** | ********** | ********** | ********** |
| Gross Block | ********** | ********** | ********** | ********** | ********** |
| Less : Depreciation to Date | ********** | ********** | ********** | ********** | ********** |
| Net Block | ********** | ********** | ********** | ********** | ********** |
| Current Assets | ********** | ********** | ********** | ********** | ********** |
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | ********** | ********** | ********** |
| Other Current Assets | ********** | ********** | ********** | ********** | ********** |
| Cash and Bank Balances | ********** | ********** | ********** | ********** | ********** |
| Total Current Assets | ********** | ********** | ********** | ********** | ********** |
| P & P Exp. and/or Other Dvp.Exp. | ********** | ********** | ********** | ********** | ********** |
| (To The Extent Not W/Off) | ********** | ********** | ********** | ********** | ********** |
| Other Non Current Assets | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Total of Assets | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| ROI (Average of Fixed Assets) | ********** | ********** | ********** | ********** | ********** |
| RONW (Average of Share Capital) | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Total Assets) | ********** | ********** | ********** | ********** | ********** |
NIIR PROJECT CONSULTANCY SERVICES (NPCS)is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.
Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.
NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.
Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity
Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial,
Technical, Office Staff and Marketing Personnel
Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram
Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities
| Assumptions for Profitability workings | Plant Economics |
Production Schedule |
|
Land & Building
|
|
Plant & Machinery
|
|
Other Fixed Assets
|
|
Working Capital Requirement Per Month
|
|
Overheads Required Per Month And Per Annum
|
|
Salary and Wages |
Turnover Per Annum |
Share Capital
|
|
Annexure 1:: Cost of Project and Means of Finance |
|
Annexure 2:: Profitability and Net Cash Accruals
|
|
Annexure 3 :: Assessment of Working Capital requirements
|
|
Annexure 4 :: Sources and Disposition of Funds |
|
Annexure 5 :: Projected Balance Sheets
|
|
Annexure 6 :: Profitability ratios
|
|
Annexure 7 :: Break-Even Analysis
|
|
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
|
|
Annexure 12 :: Shareholding Pattern and Stake Status
|
|
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
|
|
| Annexure 14 :: Product wise domestic Sales Realisation | Annexure 15 :: Total Raw Material Cost |
| Annexure 16 :: Raw Material Cost per unit | Annexure 17 :: Total Lab & ETP Chemical Cost |
| Annexure 18 :: Consumables, Store etc., | Annexure 19 :: Packing Material Cost |
| Annexure 20 :: Packing Material Cost Per Unit | Annexure 21 :: Employees Expenses |
| Annexure 22 :: Fuel Expenses | Annexure 23 :: Power/Electricity Expenses |
| Annexure 24 :: Royalty & Other Charges | Annexure 25 :: Repairs & Maintenance Exp. |
| Annexure 26 :: Other Mfg. Expenses | Annexure 27 :: Administration Expenses |
| Annexure 28 :: Selling Expenses | Annexure 29 :: Depreciation Charges β as per Books (Total) |
| Annexure 30 :: Depreciation Charges β as per Books (P & M) | Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total) |
| Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M) | Annexure 33 :: Interest and Repayment - Term Loans |
| Annexure 34 :: Tax on Profits | Annexure 35 ::Projected Pay-Back Period And IRR |