Graphite is one of the cheapest forms of carbon you can buy. Subject it to 5- 6 GPa of pressure at 1,300- 1,600°C and it becomes a real diamond (same hardness, same brilliance, same chemistry as a diamond that's been mined). That one transformation is why the business has moved out of the research lab and onto the factory floors in Surat, Mumbai and a whole host of other smaller industrial towns.
For a first gen entrepreneur it's all very practical really. The raw material by weight is minimal so storage and logistics are very light. You can run a press room 24/7 and the finished stones are priced per carat so you've got a very high output value per unit. There's also consistent demand throughout the year as you've got engagement rings, everyday jewellery and fashion pieces to keep the order book full well into the year after the wedding season.
India has an edge that very few of the other new entrants can match. It has one of the deepest pools of cutting and polishing talent in the world so a grower can sell their rough to a local cutter or indeed build the entire chain and take the margin in between.
Industry research reports have the global lab grown diamond market at circa USD28-29bn in 2025 with forecasts of around 8-11% annual growth through to 2032 (one report even has it at USD60bn). Those are all estimates and vary from report to report.
The Indian numbers are better. The provisional data from the GJEPC for FY 2025-26 shows polished lab grown diamond exports at about 18.8 million carats, versus just under 16 million carats of cut & polished natural diamonds. That was 0.1 million carats in 2015-16.
Government trade data (Department of Commerce and ITC Trade Map) tells the same story. India's share of world lab grown diamond exports has increased from around 28% in 2022 to nearly 36% in 2025 (beating both Hong Kong and the UAE). Shipments in the first 5 months of 2026 were 7.05 million carats as opposed to 6.70 million carats of natural stones.
Exporters are establishing routes into the UAE, the UK and Hong Kong as well as the US. Gems and jewellery exports were at ₹2.44 lakh crore in 2025 (6.3% of merchandise exports) and supported nearly 75 lakh livelihoods, the Union Home Minister has said.
The graphite route is known as HPHT (high pressure, high temperature) and it essentially replicates in a matter of days what the earth does over a very long period of time.
Raw material preparation: the high purity graphite is pressed or machined into discs and tubes. A metal solvent (an iron-nickel or iron-cobalt alloy) is also prepared, along with small diamond seed plates.
Cell assembly. Seeds are mounted on a pad at the cooler end of a ceramic or pyrophyllite capsule. The metal solvent is on top of them and the graphite carbon source at the hot end with a graphite heater all the way around the assembly.
Pressing. The capsule goes into the cubic press. Pressure is raised first to about 5 to 6 GPa and only then is the temperature raised to 1,300 to 1600°C. The order is important in that you don't want to heat the seeds up before the pressure is stable as that can damage the seeds.
Growth. The metal melts and the graphite dissolves. Carbon travels through the molten metal along the temperature gradient and deposits layer by layer on the seeds. A run will last from a few days to a few weeks depending on the size and quality you're after.
Cooling and recovery: pressure and temperature are ramped down very slowly to prevent the crystals cracking. The capsule is then opened and the metal is dissolved in a hot acid bath, leaving the rough diamonds completely untouched.
Sorting and cutting. The rough stones are sorted by size, colour and clarity and then sawn or laser cut, bruted and polished facet by facet.
Testing and grading: the finished stones are tested on spectroscopic equipment, laser-inscribed with a reference number and then certified by a recognised gemmological laboratory.
In India the well known growers and manufacturers are Bhanderi Lab Grown Diamonds, Kira Diam and Greenlab Diamonds (all based in Surat) and Limelight is a well known Indian lab grown jewellery brand. Abroad De Beers Group sells lab grown jewellery under the Lightbox brand. WD are the lab grown diamond brand in the US. In China Henan Huanghe Whirlwind, Zhongnan Diamond and Sino-Crystal are the leading cubic press HPHT producers.
A sensible starting point for a newcomer would be a small bank of presses, a finishing tie-in with an existing cutting unit and certification on the first batch.
| Plant capacity | Plant & machinery | Working capital | Cost of Project | T.C.I | Return | Break even |
|---|---|---|---|---|---|---|
| Lab Grown Diamonds (1 Carat): 30 Carat Per Day | 2456 | N/A | 3322 | 28 | 33 |
All financial figures in the project estimate are presented in Indian Rupees (INR) and, unless otherwise stated, are expressed in Lakhs.
| COST OF PROJECT | MEANS OF FINANCE | ||||||
| Particulars | Existing | Proposed | Total | Particulars | Existing | Proposed | Total |
| Land & Site Development Exp. | ********** | ********** | ********** | Capital | ********** | ********** | ********** |
| Buildings | ********** | ********** | ********** | Share Premium | ********** | ********** | ********** |
| Plant & Machineries | ********** | ********** | ********** | Other Type Share Capital | ********** | ********** | ********** |
| Motor Vehicles | ********** | ********** | ********** | Reserves & Surplus | ********** | ********** | ********** |
| Office Automation Equipments | ********** | ********** | ********** | Cash Subsidy | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | Internal Cash Accruals | ********** | ********** | ********** |
| Franchise & Other Deposits | ********** | ********** | ********** | Long/Medium Term Borrowings | ********** | ********** | ********** |
| Preliminary& Pre-operative Exp | ********** | ********** | ********** | Debentures / Bonds | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** | Unsecured Loans/Deposits | ********** | ********** | ********** |
| Margin Money - Working Capital | ********** | ********** | ********** | ********** | ********** | ********** | |
| TOTAL | ********** | ********** | ********** | TOTAL | ********** | ********** | ********** |
| Particulars | Existing | Proposed | Total |
| COST OF PROJECT | |||
| Land & Site Development Exp. | |||
| Land Area Required | ********** | ********** | ********** |
| Land Development Cost, Boundary Wall, Gate & Road etc. | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Buildings | ********** | ********** | ********** |
| Factory Building - | ********** | ********** | ********** |
| Office Buildings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Plant & Machineries | ********** | ********** | ********** |
| Indigenous Machineries | ********** | ********** | ********** |
| Erection & Installation | ********** | ********** | ********** |
| Laboratory Equipments | ********** | ********** | ********** |
| Miscellaneous Equipments like pumps, valves, pipeline & fittings | ********** | ********** | ********** |
| Imported Machineries | ********** | ********** | ********** |
| Technical know how | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Office Vehicles | ********** | ********** | ********** |
| Office Automation Equipments (Telephone/ Fax/ Computer) | ********** | ********** | ********** |
| Office Equipment, Furniture plus Other Equipment & Accessories | ********** | ********** | ********** |
| Other Misc. Assets | ********** | ********** | ********** |
| Pre-operative & Preliminary Expenses | ********** | ********** | ********** |
| Provision for Contingencies | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Capital Cost of Project | ********** | ********** | ********** |
| Margin Money for Working Capital | ********** | ********** | ********** |
| Total Cost of Project | ********** | ********** | ********** |
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| ********** | ********** | ********** | ********** | ********** | |
| Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| Gross Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Less : Excise Duties/Levies | ********** | ********** | ********** | ********** | ********** |
| Net Sales Realisation | ********** | ********** | ********** | ********** | ********** |
| Total Revenue/Income/Realisation | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Expenses/Cost of Products/Services/Items | ********** | ********** | ********** | ********** | ********** |
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** |
| Indigenous | ********** | ********** | ********** | ********** | ********** |
| Total Nett Consumption | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** |
| Sub Total of Net Consumption | ********** | ********** | ********** | ********** | ********** |
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expenses | ********** | ********** | ********** | ********** | ********** |
| Depreciation | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance Exp. | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** |
| Cost of Output of Goods Sold | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Gross Profit | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowing | ********** | ********** | ********** | ********** | ********** |
| On Wkg. Capital Borrowings | ********** | ********** | ********** | ********** | ********** |
| Total Financial Charges | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** |
| Total Cost of Sales | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** |
| Tax on Profit | ********** | ********** | ********** | ********** | ********** |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Depreciation Added Back | ********** | ********** | ********** | ********** | ********** |
| Technical Knowhow Fees & Exp. | ********** | ********** | ********** | ********** | ********** |
| Net Cash Accruals | ********** | ********** | ********** | ********** | ********** |
| Particulars | Stk.Prd. | Stk.Prd. | Operating Years | |||||
| 1st Year | 2nd Yr&+ | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Capacity | Months | Months | % | ********** | ********** | ********** | ********** | ********** |
| CURRENT ASSETS | ********** | ********** | ********** | ********** | ********** | |||
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** | |||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | |||
| Indigenous | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Packing Material | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Consumable Store | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Work-in-Process | ********** | ********** | D | ********** | ********** | ********** | ********** | ********** |
| Finished Goods | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Current Expenses | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | M | ********** | ********** | ********** | ********** | ********** |
| ********** | ********** | ********** | ********** | ********** | ********** | ********** | ||
| Total | ********** | ********** | ********** | ********** | ********** | |||
| Cash/Bank Balances | ********** | ********** | ********** | ********** | ********** | |||
| Gross Wkg. Capital | ********** | ********** | ********** | ********** | ********** | |||
| Particulars | Operating Years | |||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | ||
| Profit Percentages to Net Sales | ||||||
| Gross Profit | ********** | ********** | ********** | ********** | ********** | |
| % Of G.P. to Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit Before Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.B.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| % of N.P.A.T. To Net Sales | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Coverage Ratio | ||||||
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Exp | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ||||||
| Repayment of Long/Medium Ter | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** | |
| Parameters | ||||||
| Initial Equity Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Credit Balance in P & L | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Capital excl Unsec Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Equity incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings from Bank | ********** | ********** | ********** | ********** | ********** | ********** |
| Term lia. Incl Unsecured Deposit | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Liabilities incl Unsecured Deposits | ********** | ********** | ********** | ********** | ********** | ********** |
| DEBT EQUITY RATIO considering | ||||||
| i.e.Total Term Lia./NW | ||||||
| Unsecured Dep. as Equity | ********** | ********** | ********** | ********** | ********** | ********** |
| Unsecured Dep. as Debt | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Outside Lia./NW | ********** | ********** | ********** | ********** | ********** | |
| Assets Turnover Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| No. of Shares of 10.00 each | ********** | ********** | ********** | ********** | ********** | |
| Earnings Per Share (EPS) (in `) | ********** | ********** | ********** | ********** | ********** | |
| Proposed divident | ********** | ********** | ********** | ********** | ********** | |
| Cash EPS (in `) | ********** | ********** | ********** | ********** | ********** | |
| Dividend Per Share(DPS) (in `) | ********** | ********** | ********** | ********** | ********** | |
| Payout Ratio (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings/Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Retained Earnings (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Book Value Per Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Debt Per Share (in `) | ********** | ********** | ********** | ********** | ********** | |
| Probable Mkt.Price/Share(in `) | ********** | ********** | ********** | ********** | ********** | |
| Price / Book Value (x) | ********** | ********** | ********** | ********** | ********** | |
| Price Earnings Ratio (x) | ********** | ********** | ********** | ********** | ********** | |
| Yield (%Age) | ********** | ********** | ********** | ********** | ********** | |
| Particulars | Operating Years | |||||
| Ratio | 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| BREAK EVEN ANALYSIS | ||||||
| Total Value of Output | ********** | ********** | ********** | ********** | ********** | |
| Variable Cost & Expenses | ||||||
| Raw Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Lab & ETP Chemical Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Packing Material Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Sales Commission/Exp. | ********** | ********** | ********** | ********** | ********** | ********** |
| Sub-total | ********** | ********** | ********** | ********** | ********** | |
| Less:W.I.P. Adjustments | ********** | ********** | ********** | ********** | ********** | |
| Total Variable Cost | ********** | ********** | ********** | ********** | ********** | |
| Net Contribution | ********** | ********** | ********** | ********** | ********** | |
| Profit Volume Ratio (%) | ********** | ********** | ********** | ********** | ********** | |
| Semi-Var./Semi-Fixed Exp. | ||||||
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Interest on Wkg.Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Tot.Semi-Var./Fixed Exp. | ********** | ********** | ********** | ********** | ********** | |
| Fixed Expenses / Cost | ********** | |||||
| Miscellaneous Cost | ********** | ********** | ********** | ********** | ********** | ********** |
| Employees Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Power/Electricity Expen | ********** | ********** | ********** | ********** | ********** | ********** |
| Fuel Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Royalty & Other Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Repairs & Maintenance E | ********** | ********** | ********** | ********** | ********** | ********** |
| Other Mfg. Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Administration Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Selling Expenses | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Fixed Borrowing | ********** | ********** | ********** | ********** | ********** | ********** |
| Intrest-Working Capital | ********** | ********** | ********** | ********** | ********** | ********** |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | ********** |
| Deferred Expenses W/Off | ********** | ********** | ********** | ********** | ********** | ********** |
| Total Fixed Expenses | ********** | ********** | ********** | ********** | ********** | |
| Tot.Fixed/Semi-Fixed Exp | ********** | ********** | ********** | ********** | ********** | |
| Tot.Cash Fixed/SemiFixed | ********** | ********** | ********** | ********** | ********** | |
| Cash Break Even Sales | ********** | ********** | ********** | ********** | ********** | |
| Cash Margin of Safety | ********** | ********** | ********** | ********** | ********** | |
| Break Even Sales | ********** | ********** | ********** | ********** | ********** | |
| Margin of safety | ********** | ********** | ********** | ********** | ********** | |
| At Maximum Utilisation : | Year | ********** | ********** | ********** | ********** | ********** |
| Cash B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| B.E.P. : | % | xx% | xx% | xx% | xx% | xx% |
| Equity Share Capital | ********** | ********** | ********** |
| Others - Preference Share Capital | ********** | ********** | ********** |
| Total Equity Share Capital | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Long/Medium Term Borrowings | ********** | ********** | ********** |
| FROM BANK | ********** | ********** | ********** |
| From Other Financial Institutions | ********** | ********** | ********** |
| Total Long/Medium Term Borrowings | ********** | ********** | ********** |
| ********** | ********** | ********** | |
| Total Means of Finance | ********** | ********** | ********** |
| A | Name of Institution-Bank | ABC BANK | |
| B | Term Borrowing Amount | ********** | xx |
| C | Repayment Term (Years) | ********** | Years |
| D | Repayment Instalments | ********** | Instalments |
| E | Repayment Commencement | Year - 0; 3rd Qtr. | |
| F | Rate of Interest(General) | xxxx% | p.a. |
| F | Rate of Interest(Initial) | 0.00% | p.a. |
| G | Apply Gen. Int. Rate from Year | x Quarter :: x | |
| H | Interest Calculation | Quarterly |
| Funds Available to Service Debts | ||||||
| Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** | |
| Depreciation Charges | ********** | ********** | ********** | ********** | ********** | |
| Technical Knowhow Fees & Expenses | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| Debt Service Obligations | ********** | ********** | ********** | ********** | ********** | |
| Repayment of Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| Interest on Long/Medium Term | ********** | ********** | ********** | ********** | ********** | |
| T o t a l | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Individual) | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Cumulative) ..... | ********** | ********** | ********** | ********** | ********** | |
| D. S. C. R. (Overall) ........ | ********** | ********** | ********** | ********** | ********** |
| Operating Year | F.Assets Type A-1 | F.Assets Type A-2 | F.Assets Type B | F.Assets Type C | F.Assets Type D-1 | F.Assets Type D-2 | Total |
| Particulars | Factory Building - | Office Buildings | PLANT & MACHINERY | Office Vehicles | Office Automation Equipments | Furniture & Fixtures | |
| 1-2 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 2-3 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 3-4 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 4-5 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| 5-6 | ********** | ********** | ********** | ********** | ********** | ********** | ********** |
| Particulars | Method | Deprn.Rate | Part Consideration (for Asset put to use less than xx months) | ||||
| Type A :: Buildings | |||||||
| Factory Building - | WDV | ********** | ********** | ||||
| Office Buildings | WDV | ********** | ********** | ||||
| Type C | |||||||
| Office Vehicles | WDV | ********** | ********** | ||||
| Type D :: Misc. Fixed Assets | |||||||
| Office Automation Equipments | WDV | ********** | ********** | ||||
| Furniture & Fixtures | WDV | ********** | ********** | ||||
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Year | 1 | 2 | 3 | 4 | 5 |
| Initial Investment | ********* | ||||
| Total Initial Investment | ********* | ||||
| Yearly Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Accumulated Cash Flow | ********* | ********* | ********* | ********* | ********* |
| Pay Back Period | xx Years xx Months | xx Years xx months | |||
| Year | CFAT | PV factor @**% | ********** |
| Initial Investment | ********* | ********* | ********* |
| 1-2 | ********* | ********* | ********* |
| 2-3 | ********* | ********* | ********* |
| 3-4 | ********* | ********* | ********* |
| 4-5 | ********* | ********* | ********* |
| 5-6 | ********* | ********* | ********* |
| Total PV | ********* | ********* | |
| IRR | ********* | ********* |
| Particulars | Operating Years | ||||
| 1-2 | 2-3 | 3-4 | 4-5 | 5-6 | |
| Equity Share Capital | ********** | ********** | ********** | ********** | ********** |
| Surplus of Previous Year | ********** | ********** | ********** | ********** | ********** |
| Add : Net Profit After Taxes | ********** | ********** | ********** | ********** | ********** |
| Surplus at the End of Year | ********** | ********** | ********** | ********** | ********** |
| Unsecured Deposits | ********** | ********** | ********** | ********** | ********** |
| Long/Medium Term Borrowings Proposed-FROM BANK | ********** | ********** | ********** | ********** | ********** |
| Bank Borrowing for Wkg. Capital | ********** | ********** | ********** | ********** | ********** |
| Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Sundry Creditors | ********** | ********** | ********** | ********** | ********** |
| Other Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Total Current Liabilities | ********** | ********** | ********** | ********** | ********** |
| Total of Liabilities | ********** | ********** | ********** | ********** | ********** |
| A S S E T S | ********** | ********** | ********** | ********** | ********** |
| Fixed Assets | ********** | ********** | ********** | ********** | ********** |
| Gross Block | ********** | ********** | ********** | ********** | ********** |
| Less : Depreciation to Date | ********** | ********** | ********** | ********** | ********** |
| Net Block | ********** | ********** | ********** | ********** | ********** |
| Current Assets | ********** | ********** | ********** | ********** | ********** |
| Stocks on Hand | ********** | ********** | ********** | ********** | ********** |
| Receivables | ********** | ********** | ********** | ********** | ********** |
| Other Current Assets | ********** | ********** | ********** | ********** | ********** |
| Cash and Bank Balances | ********** | ********** | ********** | ********** | ********** |
| Total Current Assets | ********** | ********** | ********** | ********** | ********** |
| P & P Exp. and/or Other Dvp.Exp. (To The Extent Not W/Off) | ********** | ********** | ********** | ********** | ********** |
| Other Non Current Assets | ********** | ********** | ********** | ********** | ********** |
| Total of Assets | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Fixed Assets) | ********** | ********** | ********** | ********** | ********** |
| RONW (Average of Share Capital) | ********** | ********** | ********** | ********** | ********** |
| ROI (Average of Total Assets) | ********** | ********** | ********** | ********** | ********** |
NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.
Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.
NPCS also publishes various process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.
Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity
Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram
Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities
| Assumptions for Profitability workings | Plant Economics |
Production Schedule | |
Land & Building
| |
Plant & Machinery
| |
Other Fixed Assets
| |
Working Capital Requirement Per Month
| |
Overheads Required Per Month And Per Annum
| |
Salary and Wages | Turnover Per Annum |
Share Capital
| |
Annexure 1:: Cost of Project and Means of Finance | |
Annexure 2:: Profitability and Net Cash Accruals
| |
Annexure 3 :: Assessment of Working Capital requirements
| |
Annexure 4 :: Sources and Disposition of Funds | |
Annexure 5 :: Projected Balance Sheets
| |
Annexure 6 :: Profitability ratios
| |
Annexure 7 :: Break-Even Analysis
| |
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
| |
Annexure 12 :: Shareholding Pattern and Stake Status
| |
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
| |
| Annexure 14 :: Product wise domestic Sales Realisation | Annexure 15 :: Total Raw Material Cost |
| Annexure 16 :: Raw Material Cost per unit | Annexure 17 :: Total Lab & ETP Chemical Cost |
| Annexure 18 :: Consumables, Store etc., | Annexure 19 :: Packing Material Cost |
| Annexure 20 :: Packing Material Cost Per Unit | Annexure 21 :: Employees Expenses |
| Annexure 22 :: Fuel Expenses | Annexure 23 :: Power/Electricity Expenses |
| Annexure 24 :: Royalty & Other Charges | Annexure 25 :: Repairs & Maintenance Exp. |
| Annexure 26 :: Other Mfg. Expenses | Annexure 27 :: Administration Expenses |
| Annexure 28 :: Selling Expenses | Annexure 29 :: Depreciation Charges – as per Books (Total) |
| Annexure 30 :: Depreciation Charges – as per Books (P & M) | Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total) |
| Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M) | Annexure 33 :: Interest and Repayment - Term Loans |
| Annexure 34 :: Tax on Profits | Annexure 35 ::Projected Pay-Back Period And IRR |