PROJECT DESCRIPTION

Use of scrap in the production of thermally and mechanically treated (TMT) steel bars is cost effective and works on the principles of recycling and sustainability. This is a very attractive business venture for investors and business persons that focus on the global recycling and sustainability as it offers great financial returns. This paper provides a detailed analysis of a business investment by concentrating in the market, the manufacturing process, and the machinery to be used.

Reasons why individuals should concentrate in the manufacturing of TMT bars from scrap.

1. Generation of products from scrap is extremely cost efficient and environmentally friendly. Lean production is one of the ecofriendly features of manufacturing. In production of TMT bars, the waste that would have been dumped into a landfill is used as the raw material. In addition to the waste of raw material, there is no need of carrying out sophisticated mining to obtain virgin resources. Using scrap instead of newly mined resources is extremely economical. Such advantages is a huge competitive market in the production of TMT bars.

2. It is worth to note that the construction industry is the main consumer of TMT bars production. The construction industry is largely served by TMT in production of bars. There is a large demand for TMT bars and steel rebars in the construction industry to support the booming productivity in the economy. This is due to the construction of road and rail networks, the development of building and business investment. In all of the construction, these products are used to improve productivity.

3. Supportive Government Policies: Many governments offer support to the recycling industry through incentives such as subsidies and tax rebates for those who utilize scrap. These incentives can significantly reduce costs associated with the initial and operational stages of the business and can make the industry very appealing to new potential entrants.

Market Overview and Potential

The international market for steel rebar appears to have a bright future ahead. Recent studies predict that the market for steel rebar will have a average annual growth rate of approximately 4% to 6% over the coming decades. The largest market for steel rebar will be the Asia and the Pacific regions, with their rapid development in construction and increased urbanization. North America and Europe will follow.

The TMT rebar export are led by the countries of India, China, and Turkey. The international market demand for TMT rebars produced with environmentally friendly methods is of high quality, and favors the entry of manufacturers who are willing to achieve international market standards.

Manufacturing Process

1.Collecting and Classifying Scrap Metals: The initial stage in the manufacturing process of TMT process starts with the collection of scrap metals including scrap steel from construction sites, manufacturing by-products, and also scrap metals from old furniture. These metals have to be classified in accordance to quality and their chemical composition.

2. Melting: The classified metals are then charged into a furnace to be melted. The process of melting is complete when metals achieve the liquid state and all impurities are eliminated from the metals.

3. Purification: the next stage in the refinement process is the transfer of molten steel to electrolysis or other refiners for decontamination. This process provides the necessary chemical constitution for the production of high grade TMT bars.

4. Casting: The purified molten steel is cast into billets. These billets are pre-heated and then passed through a series of rolling mills to achieve the desired size and shape.

5. Thermo mechanical treatment: Thermo mechanical treatment is the process which gives the name, as well as the other exclusive characteristic of a TMT bar. As soon as the steel bars emerge from the rolling mill, they are subjected to a quenched process which creates a hard exterior and a soft inner core. Softer bars of steel are then subjected to cooling by to temperature and then process out the others to produce tempering high strength and are extremely ductile products.

6. Cutting and bundling: The bars are then subsequently cut to a predetermined length, and then organized for shipment according to their size and grade.

List of machines required

- Intuitive furnace: The melting of scrap metal.

- Rolling mill: The shaping and lesser thickness of steel.

- Quenching system: The rapid tempering of bars as they are cooled to fulfill needs.

- Cutting machinery: Cutting bars to a length of specification.

- Bundling machinery: The putting up of the finished bars.

- Material handling equipment: The use of cranes and forklifts for raw materials and finished products.

Conclusion

When discussing potential investments within the realms of the decreased manufacture of steel rebars from scrap metals, most individuals enter the realm of the unknown and think about the economic feasibility and viability of the manufacture of steel rebars from scrap metals. It boasts incredible potential and economic viability within the realm and the location of the manufacture. It aligns well with the principles of international sustainability and offers remarkable potential for economic development of this sector coupled with substantial international trade potential.

For entrepreneurs looking to push the boundaries of success in this industry, this is worth a more lasting consideration.

Plant capacity Plant & machinery Working capital Cost of Project T.C.I Return Break even
Steel Rebars (Thermo-Mechanically Treated-TMT): 500 MT Per Day Slag (By Product): 33.3 MT Per Day 1600 N/A 5800 30 59

PROJECT AT A GLANCE

COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary& Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** **********
TOTAL ********** ********** ********** TOTAL ********** ********** **********

COST OF PROJECT

Particulars Existing Proposed Total
COST OF PROJECT
Land & Site Development Exp.
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********

PROFITABILITY AND NET CASH ACCRUALS

Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********

ASSSESSEMENT OF WORKING CAPITAL REQUIREMENTS

Particulars Stk.Prd. Stk.Prd. Operating Years
1st Year 2nd Yr&+ 1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** ********** **********
Cash/Bank Balances ********** ********** ********** ********** **********
Gross Wkg. Capital ********** ********** ********** ********** **********
********** ********** ********** ********** **********

PROFITABILITY RATIOS, DSCR, DEBT EQUITY

Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales
Gross Profit ********** ********** ********** ********** **********
% Of G.P. to Net Sales ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales ********** ********** ********** ********** **********
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations
Repayment of Long/Medium Ter ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
Parameters
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital excl Unsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering
i.e.Total Term Lia./NW
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** **********
Assets Turnover Ratio (x) ********** ********** ********** ********** **********
No. of Shares of 10.00 each ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in `) ********** ********** ********** ********** **********
Proposed divident ********** ********** ********** ********** **********
Cash EPS (in `) ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in `) ********** ********** ********** ********** **********
Payout Ratio (%Age) ********** ********** ********** ********** **********
Retained Earnings/Share (in `) ********** ********** ********** ********** **********
Retained Earnings (%Age) ********** ********** ********** ********** **********
Book Value Per Share (in `) ********** ********** ********** ********** **********
Debt Per Share (in `) ********** ********** ********** ********** **********
Probable Mkt.Price/Share(in `) ********** ********** ********** ********** **********
Price / Book Value (x) ********** ********** ********** ********** **********
Price Earnings Ratio (x) ********** ********** ********** ********** **********
Yield (%Age) ********** ********** ********** ********** **********

BREAK EVEN ANALYSIS

Particulars Operating Years
Ratio 1-2 2-3 3-4 4-5 5-6
BREAK EVEN ANALYSIS
Total Value of Output ********** ********** ********** ********** **********
Variable Cost & Expenses
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total ********** ********** ********** ********** **********
Less:W.I.P. Adjustments ********** ********** ********** ********** **********
Total Variable Cost ********** ********** ********** ********** **********
Net Contribution ********** ********** ********** ********** **********
Profit Volume Ratio (%) ********** ********** ********** ********** **********
Semi-Var./Semi-Fixed Exp.
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** **********
**********
Fixed Expenses / Cost **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** **********
Cash Break Even Sales ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** **********
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%

MEANS OF FINANCE

Equity Share Capital ********** ********** **********
Others - Preference Share Capital ********** ********** **********
Total Equity Share Capital ********** ********** **********
********** ********** **********
Long/Medium Term Borrowings ********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
********** ********** **********
Total Means of Finance ********** ********** **********

INTEREST AND REPAYMENT ON TERM LOANS

A Name of Institution-Bank ABC BANK
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.
F Rate of Interest(General) xxxx% p.a.
F Rate of Interest(Initial) 0.00% p.a.
G Apply Gen. Int. Rate from Year x Quarter :: x
H Interest Calculation Quarterly

Debt Service Coverage Ratio

Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations ********** ********** ********** ********** **********
Repayment of Long/Medium Term ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********

DEPRECIATION CHARGES AS PER BOOKS (TOTAL)

Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building - Office Buildings PLANT & MACHINERY Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures
1-2 ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
Type A :: Buildings
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
Type C
Office Vehicles WDV ********** **********
Type D :: Misc. Fixed Assets
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********

Projected Pay Back Period

Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********
Total Initial Investment *********
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months

Projected IRR

Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV ********* *********
IRR ********* *********

PROJECTED BALANCE SHEET

Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
A S S E T S ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********

COMPANY SUMMARY

NIIR PROJECT CONSULTANCY SERVICES (NPCS)is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

REASONS FOR BUYING THE REPORT

  1. This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  2. This report provides vital information on the product like its definition, characteristics and segmentation.
  3. This report helps you market and place the product correctly by identifying the target customer group of the product.
  4. This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  5. The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

OUR APPROACH

  1. Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  2. The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  3. We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

TABLE OF CONTENT

Introduction
Project Introduction
Project Objective and Strategy
Concise History of the Product
Properties
BIS (Bureau of Indian Standards) Provision & Specification
Uses & Applications

Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity

Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers

Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram

Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities

FINANCIAL PLAN

Assumptions for Profitability workings Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc., Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M) Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M) Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits Annexure 35 ::Projected Pay-Back Period And IRR

INFORMATION/ DISCLAIMER

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: >The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
Call Us WhatsApp