Pan Masala
Pan Masala

The custom of chewing breath fresheners after meals has a very long history, particularly in India. Pan Masala is a balanced mixture of betel leaf wit...

Capacity :

Sada Pan Masala: 99000kgs/annum Meetha Pan Masala: 99000kgs/annum Zarda Pan Masala: 102000kgs/annum

Plant and Machinery cost:

Rs 35 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

54.00

TCI :

Cost of Project: Rs 226 lakhs

Cost of Project :

22600000

Warehouse
Warehouse

Warehousing refers to the activities involving storage of goods on a large-scale in asystematic and orderly manner and making them available convenien...

Capacity :

Sacks Storage: 15000000 sacks/annum

Plant and Machinery cost:

Rs 177 lakhs

Working Capital :

-

Rate of Return (ROR):

23.00

Break Even Point (BEP):

42.00

TCI :

Cost of Project: Rs 808 lakhs

Cost of Project :

80800000

PCC Electric Poles
PCC Electric Poles

Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...

Capacity :

Prestressed Concrete Cement Electric Poles: 60,000nos/annum

Plant and Machinery cost:

Rs 304 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project: Rs 713 lakhs

Cost of Project :

71300000

Paracetamol
Paracetamol

Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. It is...

Capacity :

Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum

Plant and Machinery cost:

Rs 349 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project: Rs 863 lakhs

Cost of Project :

86300000

Engineering College (Aeronautical)
Engineering College (Aeronautical)

Engineering education is the activity of teaching knowledge and principles related to the professional practice of engineering. It includes the initia...

Capacity :

Aeronautical Engineering: 60 students/annum Mechanical Engineering: 60 students/annum Civil Engineering: 60 students/annum Aircraft Maintenance Engineering: 60 students/annum Air Hostage Training Course (6 Month Diploma):120 students/annum

Plant and Machinery cost:

Rs 623 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

93.00

TCI :

Cost of Project: Rs 3336 lakhs

Cost of Project :

333600000

Floral Foam
Floral Foam

Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when wet and provides both water...

Capacity :

3,600,000 Pcs/annum

Plant and Machinery cost:

Rs 69 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project : Rs 270 lakh

Cost of Project :

27000000

Aluminium Fluoride
Aluminium Fluoride

Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF3 is refractory, in strong contrast to...

Capacity :

Aluminium Fluoride: 60,000MT/annum, Silica as bye product: 20,400MT/annum

Plant and Machinery cost:

Rs 1739 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

49.00

TCI :

Cost of Project: Rs 3496 lakhs

Cost of Project :

349600000

Spices and Masala  Grinding, Blending and Packing
Spices and Masala Grinding, Blending and Packing

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, although many can also be used...

Capacity :

Chole Masala: 400,000 Kgs/annum, Sambhar Masala: 400,000 Kgs/annum, Garm Masala: 400,000 Kgs/annum, Chat Masala: 400,000 Kgs/annum, Meat Masala: 400,000 Kgs/annum, Curry Powder: 400,000 Kgs/annum

Plant and Machinery cost:

Rs 91 lakhs

Working Capital :

-

Rate of Return (ROR):

32.00

Break Even Point (BEP):

39.00

TCI :

Cost of Project: Rs 1004 lakhs

Cost of Project :

100400000

Cashew Nut Processing Unit
Cashew Nut Processing Unit

The cashew nut is a popular dessert nut, eaten out of hand, with other mixed nuts and used in baking and confections. Sixty percent of cashews are con...

Capacity :

Cashew Nut (W320 Grade) Domestic: 218MT/annum Cashew Nut (W320 Grade) Export: 327MT/annum Cashew Nut (W240 Grade) Domestic: 145.2 MT/annum Cashew Nut (W240 Grade) Export: 217.80 MT/annum Cashew Nut (LWP Grade) Domestic: 148.40 MT/annum Cashew Nut (LWP Gra

Plant and Machinery cost:

Rs 2358 lakhs

Working Capital :

-

Rate of Return (ROR):

24.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project: Rs 4477 lakhs

Cost of Project :

447700000

Wire Nail
Wire Nail

Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...

Capacity :

Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum

Plant and Machinery cost:

Rs 11 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs 59 lakhs

Cost of Project :

5900000

Wire Nail
Wire Nail

Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...

Capacity :

Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum

Plant and Machinery cost:

Rs 11 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs 59 lakhs

Cost of Project :

5900000

Sterile Water for Injection with BFS Technology
Sterile Water for Injection with BFS Technology

The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...

Capacity :

Ampoules 5 ml Size: 300,000 Th. Nos./annum Ampoules 10 ml Size: 260,000 Th. Nos./annum Ampoules 20 ml Size: 120,000 Th. Nos./annum

Plant and Machinery cost:

Rs 607 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 917 lakhs

Cost of Project :

91700000

Precast RCC Sleeper for Railway Track
Precast RCC Sleeper for Railway Track

Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing concern of the ecological ba...

Capacity :

120,000 Pcs/annum

Plant and Machinery cost:

Rs 1509 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

39.00

TCI :

Cost of Project: Rs 1970 lakhs

Cost of Project :

197000000

Mini Aerodrome
Mini Aerodrome

An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...

Capacity :

Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum

Plant and Machinery cost:

Rs 442 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

1.00

TCI :

Cost of Project: Rs 6777 lakhs

Cost of Project :

677700000

Activated Carbon from Coconut Shell
Activated Carbon from Coconut Shell

Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...

Capacity :

Activated Carbon : 600 MT/annum

Plant and Machinery cost:

Rs 81 lakhs

Working Capital :

-

Rate of Return (ROR):

15.00

Break Even Point (BEP):

65.00

TCI :

Cost of Project : Rs 245 lakhs

Cost of Project :

24500000

Hydroponic Green House Farming
Hydroponic Green House Farming

Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-use of nutrient water supplie...

Capacity :

Tomatoes: 500 MT/annum Peas: 45MT/annum Cucumber: 70MT/annum

Plant and Machinery cost:

Rs 22 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project : Rs188 lakhs

Cost of Project :

18800000

Peanut Butter
Peanut Butter

Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...

Capacity :

2,400,000 Kg/annum

Plant and Machinery cost:

Rs 126 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs 561 lakhs

Cost of Project :

56100000

Holiday Resort
Holiday Resort

A Holiday resort is a self-contained commercial establishment that endeavors to provide most of a vacationer's wants, such as food, drink, lodging, sp...

Capacity :

Double Bed Rooms Accomodation 60 Rooms (60%): 12,960 Nos./annum Resort Foods and Ammenities: 10,800 Nos./annum Restaurant: 216,000 Nos./annum Bar: 36,000 Nos./annum Banquet (Main) Lawn Area Mix &: 90,000 Nos/annum Dinning (60 Days in Year) 1500 Person/day

Plant and Machinery cost:

Rs 120 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project : Rs 1549 lakhs

Cost of Project :

154900000