In the earlier years, alcohol was mainly used for admixture with petrol and for potable purpose. Alcohol production was initially taken up with a view...
|
Capacity : 40670 Gallons/Day |
Plant and Machinery cost: Rs. 124 Crores |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Rs.164 Crores |
|
Cost of Project : 0 |
It is a distillation in which rectification is used to obtain product as nearly pure as possible. Fractionation is carried out at reduced pressure and...
|
Capacity : 100 KGS/day |
Plant and Machinery cost: Rs. 118 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 295 lakhs |
|
Cost of Project : 0 |
Casting is the oldest form of metal shaping and is still the basic engineering process since most metals are melted and cast from ores. Casting are ma...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: 132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project Rs. 262 Lakhs |
|
Cost of Project : 26200000 |
At present paper is being put to at least ten thousand different uses because number of qualities it possesses. No doubt it will be increasing its use...
|
Capacity : 500 MT/Annum |
Plant and Machinery cost: 816 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 2409 Lakhs |
|
Cost of Project : 0 |
Aluminium, the second most plentiful metallic element on earth, became an economic competitor in engineering applications as recently as the end of th...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 322 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 692 Lakhs |
|
Cost of Project : 0 |
The reinforced plastic materials constitute a very large special section of the plastic industry. Most of the increased use of reinforced plastics an...
|
Capacity : 300 MT/Annum |
Plant and Machinery cost: Rs. 42 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Rs. 119 Lacs |
|
Cost of Project : 0 |
India is one of the best producers of castor seed. It has very good commercial importance. Above all it content oil, carbohydrate protein, fibre and...
|
Capacity : 10 MT/day |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 545 Lakhs |
|
Cost of Project : 0 |
Carbon Composite fibre is produced from the raw material used PAN, pitch etc. Quality of composite carbon fibre produced from PAN is much better than...
|
Capacity : 500 Kgs/day |
Plant and Machinery cost: 238 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 520 Lakhs |
|
Cost of Project : 0 |
capacity (per day): 5000 Bottles of 5% Dextrose Saline 1000 Bottles of 10% Dextrose Saline 1000 Bottles of 25% Dextrose
|
Capacity : - |
Plant and Machinery cost: Rs. 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 29.00 |
TCI : Rs. 180 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 10000 Nos/Day |
Plant and Machinery cost: Rs. 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 87 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 5 Lakhs Nos/Day |
Plant and Machinery cost: Rs. 98 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 142 Lakhs |
|
Cost of Project : 0 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : 682 Lakhs |
|
Cost of Project : 0 |
Dextrin is a starch derivative. It is also known as water soluble carbohydrate produced by heat and acid depolymerization. It is made by heating, with...
|
Capacity : 750 MT/Annum |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 98 Lakhs (Cost of Project) |
|
Cost of Project : 9800000 |
Granite aggregates (pieces) are obtained from block cutting unit by cutting of Granite Gang saw blocks. After careful selection of each piece of equip...
|
Capacity : 42750 MT/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 82.00 |
TCI : Cost of Project 72 Lakhs |
|
Cost of Project : 0 |
Granite aggregates (pieces) are obtained from block cutting unit by cutting of Granite Gang saw blocks. After careful selection of each piece of equip...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 82.00 |
TCI : Cost of Project 72 Lakhs |
|
Cost of Project : 0 |
Pipes are the transporting tools used for carrying and transporting liquids like crude and refined petroleum oils, water, chemical and gases. With th...
|
Capacity : 300000 MT/Annum |
Plant and Machinery cost: 123 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project 187 Crores |
|
Cost of Project : 0 |
Coconut is one of the important fruit having large uses starting from bakery, confectionery, pharmaceutical industries to beverage industry and many...
|
Capacity : 27534 MT/Annum |
Plant and Machinery cost: 440 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project 1750 Lakhs |
|
Cost of Project : 0 |
Like marble and other natural stones, granite has been used extensively in the construction of forts, temples and other buildings. Granite is also ca...
|
Capacity : 45000 MT Granite Blocks /Annum |
Plant and Machinery cost: 477 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project 1519 Lakhs |
|
Cost of Project : 151900000 |