Precipitated silica (also called particulate silica) is compound of aggregates of ultimate particles of colloidal size that have not become linked in...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 174 Lakhs |
|
Cost of Project : 0 |
Dental education occupies a place of pride in the field of medical studies. The basic aim of the dental colleges is to provide health-oriented courses...
|
Capacity : 100 Students in Dental College ,4 year course with Dental College |
Plant and Machinery cost: 674 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 1642 Lakhs |
|
Cost of Project : 0 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil eorosion. Cashew ranks second among the nine tree nuts whic...
|
Capacity : 500 KG/Day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 154 Lakhs |
|
Cost of Project : 0 |
Wire mesh is known as wire netting, which is supplied in various types of meshes and for various purposes. It is used by the builders i.e. fencing lig...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 181 Lakhs |
|
Cost of Project : 0 |
The onions are perishable commodity and can not be stored for a long time after harvest in a ordinary conditions. Dehydration is simply, effective and...
|
Capacity : 1.5 MT/Day |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 220 Lakhs |
|
Cost of Project : 0 |
The tyre and tube industry has been continuously in process of upgradation of product quality to satisfy the requirements of Indian automotive manufac...
|
Capacity : 5500 Nos./Day |
Plant and Machinery cost: 210 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 1415 Lakhs |
|
Cost of Project : 0 |
Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth of...
|
Capacity : 60 Lakhs Bricks /Annum |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 135 Lakhs |
|
Cost of Project : 0 |
The term additives denotes auxiliary products that, even is small concentrations, significantly improve technological properties of paints or coating...
|
Capacity : Hydrogenated Castor Oil, Butyl Acrylate, Aluminium Plamitate each 300 MT/Annum |
Plant and Machinery cost: 74 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 58.00 |
TCI : 173 Lakhs |
|
Cost of Project : 0 |
The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: 45 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |
Bindiya is one of the most popular costume jewellery in India. Now a days it is the main feature of the ladies beauty. It is used by every women in ou...
|
Capacity : 1.5 Lakhs Pcs /Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 21 Lakhs |
|
Cost of Project : 0 |
Calcium compounds such as calcium carbonate, calcium phosphate, calcium Sulphate are widely distributed in nature. Calcium carbonate forms major const...
|
Capacity : 120000 MT/Annum |
Plant and Machinery cost: 871 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 1482 Lakhs |
|
Cost of Project : 0 |
Collapsible tubes are very popular product and are made from plastic. It is a consumable item. These tubes can be beautifully printed in multicolour i...
|
Capacity : 72000 Nos./Day |
Plant and Machinery cost: 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : 124 Lakhs |
|
Cost of Project : 0 |
Metalised coloured P.V.C and metalised rainbow coloured P.V.C are the developed P.V.C base metalic product. There are lot of use for decorating purpos...
|
Capacity : P.V.C Colour Sequence and Spark 30000 kgs/Annum, Rainbow Colour Sequence and Spark 30000 Kgs /Annum |
Plant and Machinery cost: 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : 109 Lakhs |
|
Cost of Project : 0 |
The powder of potato is known for sustaining millions of lives by providing food and nutrition during distress times. Its great taste makes potato one...
|
Capacity : 1.80 MT/Day |
Plant and Machinery cost: 125 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 246 Lakhs |
|
Cost of Project : 0 |
Date is one of the best fruits, which contains fructose as sugar ingredients, which is totally fermentable sugar and can be completely converted to et...
|
Capacity : 10000 Ltrs./Day |
Plant and Machinery cost: 815 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 1264 Lakhs |
|
Cost of Project : 0 |
Electric switches, plugs, sockets and other accessories etc. are nothing but electric fitting which are quite familiar to the people as it is found in...
|
Capacity : 1750 Nos./Day |
Plant and Machinery cost: Rs. 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 20 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniques...
|
Capacity : 300000 Nos./Day |
Plant and Machinery cost: 54 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 195 Lakhs |
|
Cost of Project : 0 |
The manufacturing process of distribution transformers are quite similar to the process of power transformers. It consist of laminating cores, enamell...
|
Capacity : 1 Nos./Day |
Plant and Machinery cost: 40 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 209 Lakhs |
|
Cost of Project : 0 |