The term parboiling covers the operation to which the paddy is subjected before milling. Water and heat are the two main elements in the process. Afte...
|
Capacity : Parboiled Rice: 3000 MT/Annum, Broken Rice : 230 MT/A, Rice Flake 1500 MT/A, Corn Flakes:1500 MT/A |
Plant and Machinery cost: Rs. 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project Rs. 308 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and casting. Among the various proce...
|
Capacity : 18,000 MT/Annum |
Plant and Machinery cost: Rs. 168 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project Rs. 483 Lakhs |
|
Cost of Project : 0 |
Salt is existent in all animal and is coeval with life itself. Salt was the name originally given to the residue left by evaporation of sea water. Io...
|
Capacity : 100 MT/day |
Plant and Machinery cost: Rs.171 Lakh |
|
Working Capital : |
Rate of Return (ROR): 73.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 734 Lakh |
|
Cost of Project : 0 |
|
Capacity : 700 Kg./Day |
Plant and Machinery cost: Rs. 12 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 125 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 510 Pes/Day |
Plant and Machinery cost: Rs. 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 23 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 168000 Pcs./Day |
Plant and Machinery cost: Rs. 50 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 136 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 40 MT/Day |
Plant and Machinery cost: Rs. 207 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 1929 Lakhs |
|
Cost of Project : 0 |
There is need of Pharmaceutical college in India for the development of country and give the better opportunity to the general merit. But in our count...
|
Capacity : 250 Students |
Plant and Machinery cost: Rs. 125 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Rs. 396 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Strawberry is one of the delicious fruits. It contains vitamins minerals, enzymes, fruit juice etc. Our daily need of food is incomplete unless we tak...
|
Capacity : 200 MT / Annum |
Plant and Machinery cost: 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 92 Lakhs |
|
Cost of Project : 0 |
Tyre is rubber shielded wheel of metal. The maximum use of tyre is captured by the automobile industry, because the automobiles cannot perform their...
|
Capacity : 5,00,000 Tyre / Annum |
Plant and Machinery cost: 279 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 861 Lakhs |
|
Cost of Project : 0 |
Cotton seeds are one of the oil producing seeds. The cotton seed cake is the residue left after the extraction of cotton seed oil from the seeds. Thi...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project 128 Lakhs |
|
Cost of Project : 0 |
Jute is a very ancient part of our packaging industry. Some times before the Jute yarn, Jute Sutli units were in danger when some other materials st...
|
Capacity : Jute Yarn “tough 10MT/Day, Jute Sutli“ 15MT / Day, Hessian Cloth “10,000 Mtrs./Day |
Plant and Machinery cost: 452 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 965 Lakhs |
|
Cost of Project : 0 |
Calcium carbide is the basis for a great number of manufacturing industries; i.e. calcium cynamide, oxyacetylene welding, pharmaceuticals, sodium cya...
|
Capacity : 1200 MT / Annum |
Plant and Machinery cost: 34 Lakh |
|
Working Capital : |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 179 Lakh |
|
Cost of Project : 0 |
India is one of the leading tea producer of the world. The main constituents of tea are polyphenols, caffeine and essential oils. These all gives tea...
|
Capacity : 15,000 Kg / Annum |
Plant and Machinery cost: 74 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 216 Lakhs |
|
Cost of Project : 0 |
Cement industry is one of the most important basic industries on which depends the economic health of a developing country. In fact the important indi...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: 105 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 175 Crores |
|
Cost of Project : 1750000000 |
Forging is the working of metal into a useful shape by hammering or pressing. Most forging operations are carried hot, but certain metals may be cold...
|
Capacity : 25000 Bearing Ring/Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2.15 Crore |
|
Cost of Project : 0 |