Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one...
|
Capacity : 1800000 Nos. Cement Bags (50 Kg. each) |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Fertilizer is a material that is added to the soil to supply one or more elements required for plant growth and productiveness. The major three elemen...
|
Capacity : 150000 MT/Annum |
Plant and Machinery cost: 709 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 1665 Lakhs |
|
Cost of Project : 0 |
Polymers have found uses in all spheres of life with demand for better materials, greater functional utility, more economical packaging and versatile...
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: 129 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 675 Lakhs |
|
Cost of Project : 0 |
Roller Flour mill serve the purpose of processing wheat to convert it into flour. The plant will have facility to produce, maida, suzi, atta and bran....
|
Capacity : 15000 MT/Annum |
Plant and Machinery cost: 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 748 Lakhs |
|
Cost of Project : 0 |
India is one of the leading potatoes producing country. Potatoes produced in states are suitable for value added processing like manufacturing of pota...
|
Capacity : 2160 MT/Annum |
Plant and Machinery cost: 664 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 951 Lakhs |
|
Cost of Project : 0 |
Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consumer p...
|
Capacity : - |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 0 |
With the phenomenal increase in number of automobiles in India during recent years the demand of tyres as original equipment and as replacement has al...
|
Capacity : - |
Plant and Machinery cost: 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 374 Lakhs |
|
Cost of Project : 0 |
Autoclaved Aerated Concrete (AAC) is a non combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 M3/Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 0 |
Butt welded steel pipe fittings are extensively used in a piping system to change direction or function which is mechanically used to the system. The...
|
Capacity : 1500 MT Steel Fittings & Flanges/Annum |
Plant and Machinery cost: 705 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1178 Lakhs |
|
Cost of Project : 0 |
Paint is a term used to describe a number of substances that consist of a pigment suspended in a liquid or paste vehicle such as oil or water. With a...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 150 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 609 Lakhs |
|
Cost of Project : 0 |
With the phenomenal increase in number of automobiles in India during recent years the demand of tyres as original equipment and as replacement has al...
|
Capacity : 3000 MT Waste Tyre/Annum |
Plant and Machinery cost: 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 374 Lakhs |
|
Cost of Project : 0 |
The term chlorinated paraffin is usually taken to encompass a wide range of liquids and solids from C10 to >C24 and containing 30-72% chlorine content...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : Rs. 279 Lakhs |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 1056 Lakhs |
|
Cost of Project : 0 |
Pharmaceutical grade sugar can be manufactured by using cane beet or sugar cane itself. This is the more pure form of sugar may not contain sulphur an...
|
Capacity : 15000 MT/Annum |
Plant and Machinery cost: 293 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 613 Lakhs |
|
Cost of Project : 0 |
A private hospital is a place where one may get treatment from ordinary fever to a major surgery operation. As a matter of fact, no limitation has bee...
|
Capacity : 200 Beds |
Plant and Machinery cost: 27 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Total Capital Investment : 151 Crores |
|
Cost of Project : 0 |
Electric equipment industry contributes over 2% of GDP which is projected to increase to about 12% in 2015 according to a study by Frost & Sullivan. D...
|
Capacity : 60000 Nos./Annum |
Plant and Machinery cost: 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 472 Lakhs |
|
Cost of Project : 0 |
The paints industry in India has been growing at the rate of around 12% a year. The paints market has crossed the Rs 135 bn mark. By volume, the marke...
|
Capacity : - |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 396 Lakhs |
|
Cost of Project : 0 |
Today the wide spread use of furfural alcohol in foundry resins is the principal outlet of this renewable chemical. Never the less, the low viscosity...
|
Capacity : 900 Kls./Annum |
Plant and Machinery cost: 157 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 380 Lakhs |
|
Cost of Project : 38000000 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |