Provision of drinking water supply or in other words ‘piped water’ supply to urban and rural population, constitutes an important aspect of developmen...
|
Capacity : 900 MT/Annum |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project 195 Lakhs |
|
Cost of Project : 0 |
Feeds are used as edible materials, which are consumed by cattle, poultry and contribute energy and/or nutrients to the cattle or poultry diet. Feeds...
|
Capacity : - |
Plant and Machinery cost: 309 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 689 Lakhs |
|
Cost of Project : 0 |
Biomass is biological material derived from living, or recently living organisms. In the context of biomass for energy this is often used to mean plan...
|
Capacity : 1 MW |
Plant and Machinery cost: 373 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 543 Lakhs |
|
Cost of Project : 0 |
Hydrogen gas was first artificially produced in the early 16th century, via the mixing of metals with strong acids. In 1766-81, Henry Cavendish was th...
|
Capacity : 120000 Nos. Cylinder/Annum 6m3, 80000 Nos. Cylinder/Annum 9m3 |
Plant and Machinery cost: 707 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 1202 Lakhs |
|
Cost of Project : 120200000 |
Carbon black is a semi graphitic form of carbon prepared in a fine state of subdivision by the partial combustion of hydrocarbons. These hydrocarbons...
|
Capacity : 50000 MT/Annum |
Plant and Machinery cost: 819 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 1730 Lakhs |
|
Cost of Project : 173000000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
PVC Flex is made out of PVC and Fabric raw material, specially designed for solvent printing industry. It is suitable for indoor and outdoor printing...
|
Capacity : - |
Plant and Machinery cost: 227 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 417 Lakhs |
|
Cost of Project : 41700000 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula. W...
|
Capacity : - |
Plant and Machinery cost: 1477 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 2425 Lakhs |
|
Cost of Project : 242500000 |
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |
The tile is a manufactured piece of hard wearing material such as ceramic, stone, metal, or even glass. Tiles are generally used for covering roofs, f...
|
Capacity : 120000 Sq. Mt/Annum Wall Tiles & 90000 Sq. Mt/Annum Floor Tiles |
Plant and Machinery cost: 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1020 Lakhs |
|
Cost of Project : 102000000 |
Sand is generally mixed with cement and water form concrete. These sand particles should be hard and inert with respect to cement continuous usages of...
|
Capacity : 240000 MT/Annum |
Plant and Machinery cost: 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 460 Lakhs |
|
Cost of Project : 46000000 |
Coconut shell is used for manufacturing a variety of products of commercial importance including activated carbon. Shell is carbonized by using method...
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: 395 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 767 Lakhs |
|
Cost of Project : 76700000 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. Cashew ranks second among the nine tree nuts which...
|
Capacity : - |
Plant and Machinery cost: 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 159 Lakhs |
|
Cost of Project : 15900000 |
Nuts and Bolts are most commonly used items in the family of industrial fasteners and their demand is fast increasing due to expansion of industries i...
|
Capacity : 8,574 MT./Annum Bolts, 6,426 MT./Annum Nuts |
Plant and Machinery cost: 303 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 824 Lakhs |
|
Cost of Project : 82400000 |
The Indian Pharmaceutical Industry today is in the front rank of India’s science-based industry with wide ranging capabilities in the complex field of...
|
Capacity : - |
Plant and Machinery cost: 127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 394 Lakhs |
|
Cost of Project : 39400000 |
Vermicompost is the product or process of composting utilizing various species of worms, usually red wigglers, white worms, and earthworms to create a...
|
Capacity : 1,500 MT./Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 107 Lakhs |
|
Cost of Project : 10700000 |
India has one of the largest technical manpower in the world. However, compared to its population it is not significant and there is a tremendous scop...
|
Capacity : - |
Plant and Machinery cost: 300 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 988 Lakhs |
|
Cost of Project : 0 |
Ink is a liquid or paste that contains pigments and/or dyes and is used to color a surface to produce an image, text, or design. Ink is used for drawi...
|
Capacity : 300 Kltrs./Annum Solvent Ink, 300 KLtrs./Annum Aqeous Ink |
Plant and Machinery cost: 150 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 398 Lakhs |
|
Cost of Project : 39800000 |