Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
Flavoured water is a beverage consisting of water with added natural or artificial flavours, herbs, and sweeteners, and is usually lower in calories t...
|
Capacity : - |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 172 Lakhs |
|
Cost of Project : 17200000 |
Beer is the worlds most widely consumed alcoholic beverage; it is the third most popular drink overall, after water and tea. It is thought by some to...
|
Capacity : - |
Plant and Machinery cost: 2855 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project : 5684 Lakhs |
|
Cost of Project : 568400000 |
A beverage can is a metal container designed to hold a fixed portion of liquid such as a carbonated soft drink, alcoholic beverage, fruit juice, herba...
|
Capacity : 1000 Kg /day |
Plant and Machinery cost: 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 29800000 |
The materials now available for packaging are paper and paper products, metal containers and foils, glass, plastics rigid and flexible, cellulose film...
|
Capacity : 6000 Nos. /day |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 182 Lakhs |
|
Cost of Project : 18200000 |
Waste is an unavoidable by product of human activities. Economic development, urbanization and improved living standards in cities increase the quanti...
|
Capacity : - |
Plant and Machinery cost: 2522 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project : 2962 Lakhs |
|
Cost of Project : 296200000 |
Magnesium oxide is the most important industrial magnesium compound with its main application in the steel and refractory industry. It is also largely...
|
Capacity : 1000 MT/Day |
Plant and Machinery cost: Rs.6105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 75.00 |
TCI : Cost of Project : Rs.10189 Lakhs |
|
Cost of Project : 1018900000 |
The pea (Pisum sativum) is one of the oldest vegetable crops to be cultivated. Its culture reaches so far back into the past that the wild ancestor i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 320 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : 767 Lakhs |
|
Cost of Project : 76700000 |
Surgical cotton is also known as absorbent cotton or cotton wool. It is mainly used for medical purposes in hospitals, nursing homes, and dispensarie...
|
Capacity : 500 Kgs./Day |
Plant and Machinery cost: 61 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 156 Lakhs |
|
Cost of Project : 15600000 |
Toner is a powder used in laser printers and photocopiers to form the printed text and images on the paper. In its early form it was simply carbon po...
|
Capacity : 6000 Kgs./Day |
Plant and Machinery cost: 2959 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project : 4048 Lakhs |
|
Cost of Project : 404800000 |
Lead acid batteries are rechargeable batteries made of lead plates situated in a ‘bath’ of sulfuric acid within a plastic casing. They are used in eve...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: 316 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 696 Lakhs |
|
Cost of Project : 0 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Sodium chlorite is the product of three elements: sodium (Na), chlorine (Cl) and oxygen. In each molecule, one sodium atom and one chlorine atom bind...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 54 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 198 Lakhs |
|
Cost of Project : 0 |
Aluminium Conductors (i) All Aluminium Conductors (AAC) (ii) All Alloy Aluminium Conductors (AAAC), and (iii) Aluminium Conductors Steel Reinforced (A...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 393 Lakhs |
|
Cost of Project : 39300000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Oleoresin (Oleo + Resin) is a homogeneous mixture comprising of resin and oils that are volatile in nature. Before understanding the details of Oleore...
|
Capacity : 100 Kgs./Day |
Plant and Machinery cost: 50 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 23.00 |
TCI : Cost of Project : 1428 Lakhs |
|
Cost of Project : 142800000 |
Jute is the second most important vegetable fibre after cotton. Diversified jute products are becoming more and more valuable to the consumer today. J...
|
Capacity : 17 MT/Day |
Plant and Machinery cost: 211 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 743 Lakhs |
|
Cost of Project : 74300000 |
Sodium Silicate (Na2SiO3) is formed by melting sand and Sodium Carbonate (Soda Ash). It has a range of chemical formula varying in sodium oxide (Na2O)...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 79 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 312 Lakhs |
|
Cost of Project : 31200000 |