Bamboo is one of rapidly growing and high yielding woody plants. It produces a large biomass per unit area as compared to many other plants. Bamboos c...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: 777 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 1936 Lakhs |
|
Cost of Project : 193600000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 33600 NOS./Day |
Plant and Machinery cost: 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 287 Lakhs |
|
Cost of Project : 28700000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 347 Lakhs |
|
Cost of Project : 34700000 |
Among the alcoholic drinks, Beer is quite common and popular in almost every Country of the World. People of different Countries take beer in varying...
|
Capacity : 3000 Thousand Ltrs/Annum |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 960 Lakhs |
|
Cost of Project : 96000000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications in...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 825 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1352 Lakhs |
|
Cost of Project : 135200000 |
Wood plastic composite products is a new type composite material booming in recent years, refers to the use of polyethylene, polypropylene and polyvi...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 382 Lakhs |
|
Cost of Project : 38200000 |
PAC is basic aluminium chloride, polybasic aluminium chloride, aluminium hydroxychloride, aluminium oxychloride, and aluminium chlorohydrate. T...
|
Capacity : 1MT/Day |
Plant and Machinery cost: 17 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 62 Lakhs |
|
Cost of Project : 0 |
Tile is a manufactured piece of hard wearing material such as clay, ceramic, stone, metal or even glass. It is a surfacing unit, used for covering roo...
|
Capacity : 6000 Sq Mt/Day |
Plant and Machinery cost: Rs. 1463 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 81.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs. 3011 Lakhs |
|
Cost of Project : 301100000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Hydrogen peroxide (H2O2) is widely used in almost all industrial areas, particularly in the chemical industry and environmental protection. The only d...
|
Capacity : 40 MT / Day |
Plant and Machinery cost: Rs. 2540 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : Rs. 3830 Lakhs |
|
Cost of Project : 383000000 |
Provision of drinking water supply, or in other words `piped' water supply to urban and rural population, constitutes an important aspect of developme...
|
Capacity : 4.80 MT / Day |
Plant and Machinery cost: Rs. 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : Rs. 400 Lakhs |
|
Cost of Project : 40000000 |
Paper based packages, containers, sacks and bags are part of our everyday lives, so it can be easy to forget what makes them unique. Unlike other pac...
|
Capacity : 500 MT/Day |
Plant and Machinery cost: Rs. 303 Crores |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 442 Crores |
|
Cost of Project : 4420000000 |
Atta (wheat flour) is one of the staple and basic foods to Indians not only that, it is basic food ingredients for all the men lives in the world....
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs. 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 490 Lakhs |
|
Cost of Project : 0 |
Coir fibres are extracted from the husks surrounding the coconut. It is a common experience that fibres detached from the coconut skin are quite hard...
|
Capacity : 390 Nos./Day |
Plant and Machinery cost: Rs. 151 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs. 659 Lakhs |
|
Cost of Project : 65900000 |
Particle board is a classic wood based panel, made from high quality particles of wood / bagasse. It is a low – density board with density range from...
|
Capacity : 500 Nos. / Day |
Plant and Machinery cost: Rs. 536 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 967 Lakhs |
|
Cost of Project : 96700000 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particl...
|
Capacity : 25 Million Ltrs./Annum |
Plant and Machinery cost: Rs. 487 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : Rs. 1557 Lakhs |
|
Cost of Project : 155700000 |