Arunachal Pradesh is one of the Indian northeastern states with a range of promising opportunities for entrepreneurs and investors. Being one of the regions with extensive natural resources, vast agricultural potential, and high renewable energy resources, the state captures the attention of many industry-oriented Indian companies. This paper summarizes a range of potential business sectors and opportunities that you may use in your start-up business development.
When combined, these factors in the state’s policy ecosystem cost and cost structure, together with a considerable number of government incentives, yield high returns, reduce operating costs, and drive down the payback period. Arunachal Pradesh has a lower cost of land acquisition and facilities than the majority of Indian states. Energy costs on average are reduced due to India as the best electricity available from renewable sources and hydropower at a much lower cost.
Particularly lower energy bills are on products and the first work with bamboo as raw material, food processing, and also a bunch of small manufacturing units. Reduced energy bills for air conditioning equipment and lighting can be mentioned as a noticeable economic improvement in almost every project. Also, the cost of delivery of goods from other states, such as bamboo, wood, products, fruits, and spices, is removed, particularly essential. Delivery and transport are expensive and take time that can mean a lot to the buyer. The cost of building itself is sometimes relatively small. The low cost of transportation alone can make projects viable, as can be kept to a minimum by auxiliary industries making a reasonable profit.
In Arunachal Pradesh, market conditions are changing very rapidly due to the rising per capita, urbanization and tourism income generating surge in the consumer demand for processed foods and beverages and lifestyle products.
From the exposure to export markets in the 6 to eight per year “ food processing and allied sectors already identified as employment opportunity For the promotion year, environmental sector, renewable energy production rely that is expected to grow by 10 to 12% annually under their help and more, industry in the areas to raise concern. Yet another important opportunity area can be ecotourism, adventure tourism, human heritage tourism which offers employment opportunity similarly on the sustainable business modal and as well if it requires availability subcategories tourist won’t buy anything from 5 subcategories generate business for handicraft items, organic food products, t-shirt industry is tea, medicine man, secondary opportunity in speedily expanding its field of focus all these major and related agricultural at 8 to 10% per annum.
To conclude, Arunachal Pradesh stands at an unprecedented inflection point in its economic journey of becoming. What used to be a metaphor on the maps of “incredible India” due to mountains, rivers, and tribal variety has now become a beacon of economic and industrial capacity of India’s Northeast. Such a combination of granted slaves of nature and mineral riches, fast-growing infrastructure, pro-regulatory business environment and market access to the three neighboring states arguably makes Arunachal Pradesh one of the most attractive places to set up a business or an industry for the next decade. As for the investors and start-ups searching for uncharted territories, Arunachal Pradesh offers a unique blend of opportunity, sustainability and growth rate; very few other states come close to providing all three in equal measures.
Please choose a project below related to this category.
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
PET, which stands for polyethylene terephthalate is a clear, strong and lightweight plastic belonging to the polyester family. It is typically called...
|
Capacity : PET Bottles/Jar 100 ml Size:16,000 Nos/Day •PET Bottles/Jar 200 ml Size:16,000 Nos/Day •PET Bottles/Jar 500 ml Size :16,000 Nos/Day •PET Bottles/Jar 1000 ml Size :16,000 Nos/Day •PET Bottles/Jar 2000 ml Size :16,000 Nos/Day |
Plant and Machinery cost: Rs 106 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project:Rs 546 Lakhs |
|
Cost of Project : 54600000 |
Apple is one of the delicious fruits. It contains vitamins, minerals, enzyme, fruit juices etc. It is very good taste to eat fresh and its juice also,...
|
Capacity : 800 Kgs/Day |
Plant and Machinery cost: Rs 336 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project:Rs 533 Lakhs |
|
Cost of Project : 53300000 |
Paper is a major product of the forestry industry, and is used widely in our society. Paper products are used not only in their obvious applications i...
|
Capacity : 100MT/Day |
Plant and Machinery cost: Rs 5457 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.62 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project:Rs 8300 Lakhs |
|
Cost of Project : 8300000 |
Egg is a highly nutritious product. Eggs are rich in protein, vitamins and minerals. The poultry sector has made tremendous progress in the last decad...
|
Capacity : 4.2MT/Day |
Plant and Machinery cost: Rs 672 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs 1044 Lakhs |
|
Cost of Project : 104400000 |
uPVC products are fire retardant. This is because they contain more than 70 % unplasticised uPVC which turns 57% Chlorine. This contribute efficiently...
|
Capacity : 8.3 MT/Day |
Plant and Machinery cost: Rs 161 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project:Rs 1119 Lakhs |
|
Cost of Project : 111900000 |
The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being very...
|
Capacity : Sweet & Scented Supari (2 gms Size Pouches) :20000 Pouches /Day •Sweet & Scented Supari (5 gms Size Pouches):8000 Pouches / Day •Sweet & Scented Supari (10 gms Size Pouches): 4000 Pouches / Day |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project :Rs 24 Lakhs |
|
Cost of Project : 2400000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 108 Seats Double Screen |
Plant and Machinery cost: Rs 157 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.24 |
|
Break Even Point (BEP): 57.13 |
TCI : Cost of Project:Rs 470 Lakhs |
|
Cost of Project : 47000000 |
Laundry detergent, or washing powder, is a type of detergent (cleaning agent) that is added for cleaning laundry. In common usage, "detergent" refers...
|
Capacity : Detergent Powder: 3.2 MT/Day •Liquid Washing Soap:3.2 MT/Day •Toilet Cleaner:3.2 MT/Day •Scouring Powder:3.2 MT/Day •Stain Remover Liquid:3.2 MT/Day |
Plant and Machinery cost: Rs 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.24 |
|
Break Even Point (BEP): 74.26 |
TCI : Cost of Project:Rs 185 Lakhs |
|
Cost of Project : 18500000 |
Spices are used for flavour, colour, aroma and preservation of food or beverages. Spices may be derived from many parts of the plant: bark, buds, flow...
|
Capacity : Chilli Oil :20 Kgs/Day •Chilli Oleoresin:60 Kgs/Day |
Plant and Machinery cost: Rs 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.91 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 147 Lakhs |
|
Cost of Project : 14700000 |
Concrete is most vital material in modern construction. It has versatile properties like easy mouldability, high compressive strength and long lasting...
|
Capacity : Ready Mix Concrete : 62.5 Cu Mt/Day •Stone Crusher:62.5 Cu Mt/Day |
Plant and Machinery cost: Rs 234 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.39 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project:Rs 762 Lakhs |
|
Cost of Project : 76200000 |