Scale and competitiveness demand have turned these developing countries into natural magnets for investors who are in turn seeking cost-effective production in proximity to their region. With its 174 million people, a vast internal market and external export relations, a GDP that keeps growing and a macro-financial relation with a bunch of multilateral lenders, Bangladesh suffices.
Key advantages:
In conclusion, Bangladesh presents an appealing opportunity for entrepreneurs and investors in the heartbeat industries and, hence, combines business opportunity with an investment in local conditions supported by the government. One must focus on a high growth basis investing in value-added textiles, ICT and fintech when one thinks of BPO/knowledge amplification, food processing and renewable energy to export, and logistics based on the domestic needs. After a close and critical examination in a feasibility study, a need to access both the political and the business area of your partners must be sought. At the same time, the use of economic zones can be utilized to cut the initial costs and pick up the emancipate bureaucratic barriers. From a risk mitigation perspective, operations can be diversified and suppliers upon many, currency exposure may be hedged, and adopting an ESG and compliance-based approach to attract global buyers. With the careful implementation and discussion and pilot project testing, and thoughtful financing, Bangladesh may become home to a profitable business in a competitive sustainability based on the cost.
Please choose a project below related to this category.
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 1,440,000 KGS/annum |
Plant and Machinery cost: 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 391 lakhs |
|
Cost of Project : 39100000 |
Tennis ball cricket is a variant of cricket popular in the Indian subcontinent, and a very South Asians living in the US & Canada. In this game a more...
|
Capacity : 1,500,000 NOS/annum |
Plant and Machinery cost: 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 164 lakhs |
|
Cost of Project : 16400000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, although many can also be used...
|
Capacity : 360,000 kgs./annum |
Plant and Machinery cost: 26 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: 181 lakhs |
|
Cost of Project : 18100000 |
These HDPE pipes and fittings have a high degree of corrosion resistance, are light in weight. Yet tough and durable, have excellent, hydraulic proper...
|
Capacity : 1,440,000 Kgs. /annum |
Plant and Machinery cost: 58 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs357 lakhs |
|
Cost of Project : 35700000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 7500 MT/annum |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: 272 lakhs |
|
Cost of Project : 127200000 |
Disposable cups, glasses, plates and spoons are used in daily life nowadays. In addition to be used at home these are largely used during at parties a...
|
Capacity : Thermocol Plates: 15,000 Th. Nos/annum Thermocol Dona: 15,000 Th. Nos/annum ThermocolThali:15,000 Th. Nos/annum Thermocol Glass:15,000 Th. Nos/annum Paper |
Plant and Machinery cost: Rs 105 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 405 lakhs |
|
Cost of Project : 40500000 |
Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...
|
Capacity : Activated Carbon :900 MT/annum Bio-Oil by Product:1,140 MT/annum |
Plant and Machinery cost: Rs 129 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 283 lakhs |
|
Cost of Project : 28300000 |
A safety razor is a shaving implement with a protective device positioned between the edge of the blade and the skin. The initial purpose of these pro...
|
Capacity : Multiblade Safety Razor (2 Blade): 86,400,000 Nos/annum |
Plant and Machinery cost: Rs 313 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs 826 lakhs |
|
Cost of Project : 82600000 |
Surgical cotton is also known as absorbent cotton” or “cotton wool”. Surgical/Absorbent cotton is cleared de-oiled and bleached cotton packed in diffe...
|
Capacity : Surgical Cotton :300,000kgs/annum |
Plant and Machinery cost: Rs 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 238 lakhs |
|
Cost of Project : 23800000 |
Mustard/Rapeseed oil is the third largest edible oil produced in the world after Soy oil and Palm oil. At a production level of 13-14 million tons, it...
|
Capacity : Mustard Oil:3000 MT/annum Deoiled cake:5,700 MT/annum |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 373 lakhs |
|
Cost of Project : 37300000 |
The key strength of LED lighting is reduced power consumption. LED’s are available with at the most Lumen efficiency of 110 Lum/Watt compared to 65-80...
|
Capacity : :132,000 Pcs/annum |
Plant and Machinery cost: Rs 18 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project: Rs 129 lakhs |
|
Cost of Project : 12900000 |