Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...
|
Capacity : Bicycles (Different Sizes): 2000 Nos./day |
Plant and Machinery cost: 336 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1589 lakhs |
|
Cost of Project : 158900000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Copper Wire:1.67 MT/day Plastic Granules:7.43 MT/day Glass :3.23 MT/day Ferrous Metal |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: Rs 1272 lakhs |
|
Cost of Project : 127200000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum |
Plant and Machinery cost: 498 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 0 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 7500 MT/annum |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: 272 lakhs |
|
Cost of Project : 127200000 |
Commercial cultivation of cashew is taken up in eight states of our country mainly in west and eastern coast viz., Andhra Pradesh, Goa, Karnataka, Ker...
|
Capacity : Cashew Nuts:77,400Kgs/annum Cashew Apple By product: 154,800 Kgs/annum Groundnut (Intercrop): 16,920 Kgs/annum |
Plant and Machinery cost: Rs 35 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project: Rs 185 lakhs |
|
Cost of Project : 18500000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegeta.... |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project 114 Lakhs |
|
Cost of Project : 11400000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project 341 Lakhs |
|
Cost of Project : 34100000 |
Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...
|
Capacity : 2,400,000 Kg/annum |
Plant and Machinery cost: 126 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project 561 Lakhs |
|
Cost of Project : 56100000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : 1,500,000kgs/annum |
Plant and Machinery cost: 50 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs 253 lakhs |
|
Cost of Project : 25300000 |
Vegetable chips (also referred to as veggie chips) are chips or crisps that are prepared using vegetables. Vegetable chips may be fried, deep-fried, d...
|
Capacity : Sweet potato : 120 kg/day Beat root : 80 kg/day Beans chips : 266 kg/day |
Plant and Machinery cost: 83 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs 209 Lakhs |
|
Cost of Project : 20900000 |
Fruit juices are spray dried in order to have a long shelf life, reduces storage place requirement and lower cost of bulk packing. Fruit juice powders...
|
Capacity : Spray Dried Pineapple Juice Powder : 500Kgs/day Spray Dried Orange Juice Powder : 168Kgs/day Dehydrated Beetroot Powder : 168Kgs/day Dehydrated Carrot Powder : 168 Kgs/day |
Plant and Machinery cost: 220 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: 544 lakhs |
|
Cost of Project : 54400000 |