The North Region of India is situated in the Jammu and Kashmir (J&K); It's an area endowed with natural beauty, a variety of resources and a geo-economic dominant accent. The “New Industrial Policy 2021” has dawned a promise of the new era of investments and industrial development in the "Paradise on Earth".
J&K Government focusing on sustainable economic development, skill generation and entrepreneurship, films pushed into the employment opportunities which includes Horticulture, Handicrafts, Food Processing, Renewable Energy, IT and Tourism based industries. Such a diverse mix makes it an economic power house but the incentives that feed this growth have to be acknowledged, it’s a performer.
Filled with agro-climatic diversity, available natural resources and special fiscal incentives, J&K has emerged as the most well suited and promising emerging economy in the North Region of India.
1. Strategic location and Connectivity J&K is gateway to Central Asia from India - This strategic location on key trade routes will only be undermined by bad transportation and connectivity With Udhampur-Srinagar-Baramulla Rail Link in place and improved air connectivity to Srinagar, Jammu and Leh, the rest of India along with the world and making the Union sector accessible for importing and exporting.
2. Also the Government has flagged the need to develop the Fazilka-Mumbai trade route early signs This enchanting state has a rich natural resource base comprising a thriving and picturesque landscape and agriculture. It is already practicable, if the state leverages these specifics by practicing proper production techniques then, packaging and exports industries oriented toward production of high value goods like Apples, Saffron, Walnuts, Cherries & Almonds find a boom in the valley.
3. Trained human resource - With a literacy rate of 77%, J&K has a young population much like India poised to be ready tomorrow for jobs in production, trade, tourism, as well as need craftsman mandatory skilled for the production Orient authorities to generate skilled manpower aligned with those project of focus away from old age inclinations such as handicraft, IT, tourism, plant manufacturing and soil management.
4. Political stability Growing Infrastructure - In addition to the havoc wreaked by the dilution of article 370, J&K has seen a significant pour in investments in logistics and industrial estates since 2019 completion of projects like AIIMS Jammu, Srinagar Smart City, Chenab Bridge among others shows that the region is now much more accessible improving its connectivity and also enabling better environment both for public and business.
1) Agriculture and horticulture - J&K accounts for more than 75% of apples grown in India, its horticultural sector representing approximately 10% of GSDP. Furthermore, J&K produces the saffron, walnuts, almonds, apricots, and cherries that serve as the basis for fruit processing, packaging, juice-making, and export operations.
2) Handicrafts and wool - The birthplace of Pashmina shawls and carpets and famous for papier-mâché and woodcarvings, the raw materials and skilled workforce are perfect for craft hubs and eco-design studios, particularly in handicraft e-sale development and exports.
3) Mineral and forest resources - With limestone, gypsum, sapphire, and marble deposits that are used in the cement, ceramics, and construction sectors, J&K possesses significant geologic resources. Its large forest areas and timber, resin, and herbal production industries are other crucial sectors.
Therefore, Jammu and Kashmir’s economy shifts from a heavy reliance on tourism to involve multiple sectors, notably:
Investment IncentivesPackage: The Government of India in collaboration with the J&K administration offers a whole lot of financial and fiscal incentives to investors and entrepreneurs. A few of them include; 30% of the investment in plant and machinery up to ₹5 crore as Capital Investment Incentive Interest Subvention of 6% for 5 years on working capital loans, guaranteed Competent transport subsidy equal to 100% of GST for 10 years, insurance covers subsidized to 100 percent freight subsidizes on all exports and interstate supplies; land allocation at discounted prices in recent industrial properties, workers earning subsidy of ₹5,000 – ₹10,000 per work per month for hiring local workers, an additional 5 % subsidy to female and youth entrepreneurs, and many more. The incentives improve profit margins and decrease capital payback timelines, resulting in Return on Investments of 15% -30% across all sectors
Jammu and Kashmir is in the throes of an impressive economic transformation – that of a single-sector service economy based on tourism into a multi-sectoral industrial powerhouse. Blessed with natural resources, government patronage, development of infrastructure and strategic linkages to markets, the region offers successions of opportunity to entrepreneurs. Whether in fruit processing, handicrafts, tourism, IT, renewable energy, wellness and entertainment, entrepreneurs in J&K could benefit from high-growth ventures with fiscal sops and export potential. With peace and development reimagining the region, Jammu and Kashmir is well on its way to becoming North India’s new frontier of sustainable, profitable and inclusive industrial growth.
Please choose a project below related to this category.
Bakery holds an important place in food processing industry and is a traditional activity.Bakery products, due to high nutrient value and affordabilit...
|
Capacity : Cakes (200 gm): 720000 Pcs./Day Filled Croissants Puffs (60 gm): 480000 Pcs./Day |
Plant and Machinery cost: Rs.540 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs. 12913 lakhs |
|
Cost of Project : 1291300000 |
Soft gelatin (also called softgel or soft elastic) capsules consist of one piece hermetically-sealed soft shells. Soft gelatin capsules are prepared b...
|
Capacity : Soft Gelatin Capsules: 3120000Nos./Day |
Plant and Machinery cost: Rs. 649 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs. 10871 lakhs |
|
Cost of Project : 1087100000 |
Cement is the binder component of concrete, the glue that holds the filler together to create a uniform, strong material. The filler in concrete consi...
|
Capacity : Cement: 1000 MT/Day |
Plant and Machinery cost: Rs. 1732 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs. 3952 lakhs |
|
Cost of Project : 0 |
Residential Apartment is a part of Housing, which has encouraging scope or development. House is a very complex term.A standard residential building o...
|
Capacity : 312 Nos./Annum |
Plant and Machinery cost: 0 |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project: Rs 10676 lakhs |
|
Cost of Project : 0 |
Residential Apartment is a part of Housing, which has encouraging scope or development. House is a very complex term.A standard residential building o...
|
Capacity : 312 Nos./Annum |
Plant and Machinery cost: 0 |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project: Rs 10676 lakhs |
|
Cost of Project : 0 |
The chocolate and confectionery products industry has traditionally been subject to significant fluctuations in demand.Chocolate is a key ingredient i...
|
Capacity : Chocolate: 2000 Kgs./Day Toffee: 500 Kgs./Day Candy: 500Kgs./Day |
Plant and Machinery cost: Rs.305 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project: Rs. 1058 lakhs |
|
Cost of Project : 105800000 |
Gomutra is not a toxic waste material. 95% of it is water, 2.5% consists of urea, and the remaining 2.5% is a mixture of minerals, salts, hormones and...
|
Capacity : Distilled Cow Urine (Gomutra): 2000Lts./Day |
Plant and Machinery cost: Rs.22 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs.187 lakhs |
|
Cost of Project : 18700000 |
Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation characteristic and amylopectin molecul...
|
Capacity : Biodegradable Plastic Bags (Per Bag 25 gms wt.) : 360 MT/Annum |
Plant and Machinery cost: Rs 298 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 606 lakhs |
|
Cost of Project : 60600000 |
Spray dried lemon juice powder was used to enhance the acceptability and nutritive value.It reserves the most of bioactive ingredients of lemon and al...
|
Capacity : Lemon Powder: 32 MT/Day Lemon Oil: 12 MT/Day |
Plant and Machinery cost: Rs. 721 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 51.00 |
TCI : cost of project Rs.1983 lakhs |
|
Cost of Project : 198300000 |
HDPE resins with low ductility can lead to unexpected cracking in the pipe. These HDPE pipes and fittings have a high degree of corrosion resistance,...
|
Capacity : HDPE Pipes: 5 MT/Day uPVC Pipes: 11 MT/Day |
Plant and Machinery cost: Rs. 385 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 720 lakhs |
|
Cost of Project : 72000000 |
BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...
|
Capacity : Bioplastic Carry Bags (8"x16") Size: 3500 Kgs/Day Bioplastic Garbage Bags (950x810 mm) Size: 1500 Kgs/Day |
Plant and Machinery cost: Rs. 62lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 396 lakhs |
|
Cost of Project : 39600000 |
Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting conditions.A bioplastic is a plastic...
|
Capacity : Bioplastic Film 25 Micron: 5000Kgs/Day |
Plant and Machinery cost: Rs. 184 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs. 616 lakhs |
|
Cost of Project : 61600000 |