Since such an era of industrial tradition revealed a mix of all the necessary for a winning industry— a base of production, natural resources, a low-cost trained workforce, and subsequent access to infrastructure development. A specifically chosen policy for diversifying industry and not to take as far as sustainable mining, agro-based industries, and renewable power revealed the following outcome. This, along with establishing logistic parks for entity transportation, an interval policy established the most effective value and efficacy of industry. Such a new tendency in industry is so modern that giant fields included an intention in advancing their line— manufacturing, metallurgy, food processing, the fields of textile and information technology and clean technology.
One, minerals and metals. The mineral deposits of Jharkhand make steel, cement, refractory, and metal fabrication industries feasible. In addition, the state has extensive coal reserves, and further holds iron-ore, bauxite, copper and the potential for value-added metallurgy, alloy and downstream industries.
Two, agriculture and forestry. The reputation of the state’s soil as being fertile along with the sufficient availability of water allows producing pulses, maize, vegetables, lac, and medicinal plants. A few possibilities also exist for Jharkhand in food processing, organic farming, and herbal product manufacturing. And three, energy and water resources. Jharkhand generates more than 4,000 MW of electricity and holds considerable potential in hydel, solar, and biomass. The power-intensive industries also benefit from the availability and relatively low prices of electricity.
The Jharkhand Government issued exhaustive Fiscal and Non-Fiscal incentives:
- Capital Investment Subsidy: 25-35% of fixed capital investment.
- Power Tariff Rebate: Rs1.00 per unit for 5 years.
- SGST Reimbursement: 100% for 7-10 years.
- Interest Subsidy: 6% on Term Loans for 5 years.
- Stamp Duty Exemption: 100% for land purchase/lease for industries.
- Employment Subsidy: Rs5000 p/m for local employees for 5 years.
- Transport Subsidy: 50% freight rebate for inter-state exports..
- Women/ST/SC Entrepreneurs and MSME Entrepreneurs: MSDP 5-10% of capital subsidy.
The combination of minerals, manpower, and manufacturing facilitated Jharkhand state with immense business potential and resulted in it hosting a unique mix of these factors. The state boasts well-established industrial infrastructure, progressive policies, and enormous natural resources, making it one of Eastern India’s most lucrative investment destinations. Potential for profitable, sustainable business ventures includes:
- Steel & Metal Industries
- Agro and Food Processing
- Textiles & Handicrafts
- Renewable Energy
- Tourism and IT Services
Given the high returns, geographical advantages, and various governmental benefits, Jharkhand is undoubtedly among the top prospects for making India’s nationwide headway in business development and industrial entrepreneurship.
Please choose a project below related to this category.
Herbal products are medicines derived from plants. They are used as supplements to improve health and wellbeing, and may be used for other therapeutic...
|
Capacity : Amla Powder (200 gms Per Pack): 1000 Packs/Day Triphala Powder (200 gms Per Pack): 1000 Packs/Day Tooth Powder (50 gms Per Pack): 4000 Packs/Day Tablets (50 NosPer Pack): 2000Packs/Day Hair Oil (200 ml Per Pack): 500 Packs/Day Skin Oil (20 |
Plant and Machinery cost: Rs.28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs.295 lakhs |
|
Cost of Project : 29500000 |
Undergarments or underwear are clothes worn under other clothes, often next to the skin. They keep outer garments from being soiled by bodily secretio...
|
Capacity : Regular Silk & Cotton Panties: 1000 Pcs/Day Bikini Sets : 1000 Pcs/Day Brasseries (Wired): 1000 Pcs/Day Brasseries (Non Wired): 1000 Pcs/Day Briefs Men |
Plant and Machinery cost: Rs. 165 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs.462 lakhs |
|
Cost of Project : 46200000 |
PLA has been utilized as biodegradable plastics for short-term use, such as rigid packaging containers, flexible packaging films, cold drink cups, cut...
|
Capacity : Polyester Fiber : 80 MT/Day |
Plant and Machinery cost: Rs. 11660 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 14.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 15974 lakhs |
|
Cost of Project : 1597400000 |
PVC pipes are produced by extrusion process followed by calibration to ensure maintenance of accurate internal dia with smooth internal boxes. These p...
|
Capacity : PVC Pipes (Size 1 inches): 510 MT/Annum PVC Pipes (Size 1.50 inches): 825 MT/Annum PVC Pipes (Sizes 2 inches): 1107 MT/Annum PVC Pipes (Size 2.50 inches): 1758 MT/Annum |
Plant and Machinery cost: Rs. 58 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project : Rs. 184 lakhs |
|
Cost of Project : 18400000 |
Urea-formaldehyde resin is a major commercial adhesive, especially within the forest products industry. It offers a number of advantages when compared...
|
Capacity : Liquid Urea-Formaldehyde Resin: 8 MT/day |
Plant and Machinery cost: Rs.71 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project: Rs. 209 lakhs |
|
Cost of Project : 20900000 |
Workwear is clothing worn for work, especially work that involves manual labour. Often those employed within trade industries elect to be outfitted in...
|
Capacity : Trousers: 3000 Pcs/day High-Visibility Long Sleeve Jackets: 1000Pcs/day |
Plant and Machinery cost: Rs. 136 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project : Rs1271 lakhs |
|
Cost of Project : 127100000 |
Paprika oleoresin is a natural food colorant used to obtain a deep red colour in any food that has a liquid/fat phase. The oleoresin is slightly visco...
|
Capacity : Chilli Oleoresin: 250 Kgs./day |
Plant and Machinery cost: Rs 75 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs. 237 lakhs |
|
Cost of Project : 23700000 |
Caffeine belongs to a family of naturally occurring compounds known as xanthines. The xanthines, which come from plants, are possibly the oldest known...
|
Capacity : Caffeine: 20 MT/day |
Plant and Machinery cost: Rs. 350 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs. 2268 lakhs |
|
Cost of Project : 226800000 |
Magnesium Sulphate is commercially available as heptahydrate, monohydrate, anhydrous or dried form containing the equivalent of 2-3 waters of hydratio...
|
Capacity : Magnesium Sulphate (Fertiliser Grade): 24 MT/day |
Plant and Machinery cost: Rs. 147 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 434 lakhs |
|
Cost of Project : 43400000 |
Dehydration is a process by which shelf life of the fruits can be extended by evaporating water while preserving the taste.Dehydrated products can be...
|
Capacity : Dehydrated Fruits: 400 Kgs./day |
Plant and Machinery cost: Rs. 1084 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs1425 lakhs |
|
Cost of Project : 142500000 |
Heat Resistant Aluminum Paint. 600°C. These paints can resist heat, flames, grease, rust and smoke, which make them ideal for specific applications.Pa...
|
Capacity : High Temperature Aluminium Based Paint: 200 Kg/day |
Plant and Machinery cost: Rs 8 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs. 52 lakhs |
|
Cost of Project : 5200000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |