Since such an era of industrial tradition revealed a mix of all the necessary for a winning industry— a base of production, natural resources, a low-cost trained workforce, and subsequent access to infrastructure development. A specifically chosen policy for diversifying industry and not to take as far as sustainable mining, agro-based industries, and renewable power revealed the following outcome. This, along with establishing logistic parks for entity transportation, an interval policy established the most effective value and efficacy of industry. Such a new tendency in industry is so modern that giant fields included an intention in advancing their line— manufacturing, metallurgy, food processing, the fields of textile and information technology and clean technology.
One, minerals and metals. The mineral deposits of Jharkhand make steel, cement, refractory, and metal fabrication industries feasible. In addition, the state has extensive coal reserves, and further holds iron-ore, bauxite, copper and the potential for value-added metallurgy, alloy and downstream industries.
Two, agriculture and forestry. The reputation of the state’s soil as being fertile along with the sufficient availability of water allows producing pulses, maize, vegetables, lac, and medicinal plants. A few possibilities also exist for Jharkhand in food processing, organic farming, and herbal product manufacturing. And three, energy and water resources. Jharkhand generates more than 4,000 MW of electricity and holds considerable potential in hydel, solar, and biomass. The power-intensive industries also benefit from the availability and relatively low prices of electricity.
The Jharkhand Government issued exhaustive Fiscal and Non-Fiscal incentives:
- Capital Investment Subsidy: 25-35% of fixed capital investment.
- Power Tariff Rebate: Rs1.00 per unit for 5 years.
- SGST Reimbursement: 100% for 7-10 years.
- Interest Subsidy: 6% on Term Loans for 5 years.
- Stamp Duty Exemption: 100% for land purchase/lease for industries.
- Employment Subsidy: Rs5000 p/m for local employees for 5 years.
- Transport Subsidy: 50% freight rebate for inter-state exports..
- Women/ST/SC Entrepreneurs and MSME Entrepreneurs: MSDP 5-10% of capital subsidy.
The combination of minerals, manpower, and manufacturing facilitated Jharkhand state with immense business potential and resulted in it hosting a unique mix of these factors. The state boasts well-established industrial infrastructure, progressive policies, and enormous natural resources, making it one of Eastern India’s most lucrative investment destinations. Potential for profitable, sustainable business ventures includes:
- Steel & Metal Industries
- Agro and Food Processing
- Textiles & Handicrafts
- Renewable Energy
- Tourism and IT Services
Given the high returns, geographical advantages, and various governmental benefits, Jharkhand is undoubtedly among the top prospects for making India’s nationwide headway in business development and industrial entrepreneurship.
Please choose a project below related to this category.
Ferro vanadium is an alloy which is formed by combining iron and vanadium. Ferrovanadium contains 35% to 85% of vanadium depending on applications of...
|
Capacity : Ferro Vanadium: 4 MT/Day |
Plant and Machinery cost: Rs. 135 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs.659 lakhs |
|
Cost of Project : 65900000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather patterns. Hydrogen, in the capa...
|
Capacity : Solar Power: 1 MW |
Plant and Machinery cost: Rs. 411 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs.811 lakhs |
|
Cost of Project : 81100000 |
Billets A semi-finished product obtained by forging, rolling or continuously casting, usually square (not exceeding 125 mm×125 mm in cross-section) wi...
|
Capacity : M.S. Billets (Size 80x80 mm to 140x140 mm): 180 MT/Day |
Plant and Machinery cost: Rs. 1565 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs. 3343 lakhs |
|
Cost of Project : 334300000 |
A thinner is a solvent used to thin oil-based paints or clean up after their use. Commercially, solvents labeled "Paint Thinner" are usually mineral s...
|
Capacity : Thinner (1 Ltrs Size): 4000 Bottles/Day Solvent Thinner (1 Ltrs Size): 4000 Bottles/Day |
Plant and Machinery cost: Rs 198 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs395 lakhs |
|
Cost of Project : 39500000 |
Dehydration process appears to be a variation on the air-drying process and is based on the principle of vapor pressure differentials, using air circu...
|
Capacity : Dehydrated Onion Sliced/Chopped: 300 MT/Annum Cattle Feed as by product: 210 MT/Annum |
Plant and Machinery cost: Rs. 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs199 lakhs |
|
Cost of Project : 19900000 |
This pre-feasibility report on Speciality/ Multi-speciality hospital consists of the feasibility detailing for three models of hospitals namely 30 bed...
|
Capacity : Super Speciality Hospital: 30 bedded |
Plant and Machinery cost: Rs. 113 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs. 978 lakhs |
|
Cost of Project : 97800000 |
A fastener is a connective mechanism that mechanically joins or affixes two ormore objects together. A bolt is an externally threaded fastener designe...
|
Capacity : Mild Steel/HT Bolts (DR M8-M16): 20 MT/Day Mild Steel/HT Nuts (DR M18-M30): 6 MT/Day |
Plant and Machinery cost: Rs. 378 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs.744 lakhs |
|
Cost of Project : 74400000 |
Curcumin is the main biologically active phytochemical compound of Turmeric. Molecular chemical formula of Curcumin: C21H20O6. The most important cons...
|
Capacity : Curcumin Powder : 90 Kgs/Day Turmeric Oil: 90Kgs/Day Deoiled Turmeric: 2800 Kgs/Day |
Plant and Machinery cost: Rs. 628 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs990 lakhs |
|
Cost of Project : 99000000 |
LPG cylinder filling plants vary considerably in size, complexity and layout. The type and size depends on such factors as maximum potential throughpu...
|
Capacity : LPG Cylinders (14.2 Kgs Size): 1000 Cylinders/Day LPG Cylinders (19 Kgs Size): 1000 Cylinders/Day |
Plant and Machinery cost: Rs.110 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs. 427 lakhs |
|
Cost of Project : 0 |
Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are thermoplastic materials which are pr...
|
Capacity : Bio-Plastic Glasses (wt. each Glass 16 gms): 62500 Pcs/Day Bio-Plastic Plates (wt. each Plate 40 gms): 25000 Pcs/Day Bio-Plastic Bags (wt. each Bag 25 gms): 40000 Pcs/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs789 lakhs |
|
Cost of Project : 78900000 |
Industrial gas is a group of materials that are specifically manufactured for use in industry and are also gaseous at ambient temperature and pressure...
|
Capacity : Oxygen Gas (7M3 each Cylinder): 300 Nos/Day Nitrogen Gas (7M3 each Cylinder): 100 Nos/Day |
Plant and Machinery cost: Rs. 177 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs. 307 lakhs |
|
Cost of Project : 30700000 |