For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Natural latex mattresses have a distinctive core material, which is sourced from the sap of the rubber tree (Hevea brasiliensis). After processing (us...
|
Capacity : Capacity: Latex Mattress Size: 75 x 72 x 5 inch 90 Nos. Per Day |
Plant and Machinery cost: 204 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 67 |
TCI :
|
|
Cost of Project : 626 |
Raw milk undergoes several processes in a Milk Processing Unit (MPU) to produce a variety of dairy byproducts like ghee, paneer, and milk powder. MPUs...
|
Capacity : Pesturised Milk :- Full Cream 9,000 Nos Per Annum Pesturised Milk :- Low Cream 9,000 Nos Per Annum Ghee 1,500 Nos Per Annum Curd 8,100 Nos Per Annum Butter Milk 3,000 Nos Per Annum Paneer 1,650 Nos Per Annum Cheese 900 Nos Per Annum Ice Cream 2,400 Nos Per Annum Milk Powder 3,000 Nos Per Annum Cheese Powder 654 Nos Per Annum |
Plant and Machinery cost: 22000 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 41 |
TCI :
|
|
Cost of Project : 29400 |
Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative strengthened composite. Glass fibers are embedded in a polymer matrix, making GFRP rebar...
|
Capacity : Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day |
Plant and Machinery cost: 211 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 52 |
TCI :
|
|
Cost of Project : 549 |
DURAMAX Steel Range Intermodal Trading Cargo, or intermodal containers, can easily transport cargo across multiple surfaces without having to unload a...
|
Capacity : Cargo Containers (Size 20 Feet) 40,000 Nos Per Annum |
Plant and Machinery cost: 300 |
|
Working Capital : N/A |
Rate of Return (ROR): 32 |
|
Break Even Point (BEP): 50 |
TCI :
|
|
Cost of Project : 3105 |
The analgesic and antipyretic called paracetamol is more commonly known in the US and Canada as acetaminophen. One of the most ubiquitous and widely u...
|
Capacity : Paracetamol Tablets (500mg) 25,000 No. of Strips Per Day |
Plant and Machinery cost: 37 |
|
Working Capital : N/A |
Rate of Return (ROR): 34 |
|
Break Even Point (BEP): 51 |
TCI :
|
|
Cost of Project : 213 |
Sustainable and Eco-Friendly Agriculture Integrated System involves poultry farming complemented with waste management and egg tray production. Breedi...
|
Capacity : Eggs Production 40,000 Nos. Per Day Spent Hens 1,000 Nos. Per Day Manure Pellets 3,500 Nos. Per Day Egg Tray Production 10,000 Nos. Per Day |
Plant and Machinery cost: 324 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 54 |
TCI :
|
|
Cost of Project : 684 |
Fiber Glass Tape consists of numerous micro glass fibers that are braided into the form of tape. Because of these tape’s superb durability and s...
|
Capacity : Fiberglass Tape 24,000 Mtrs. Per Day |
Plant and Machinery cost: 190 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 47 |
TCI :
|
|
Cost of Project : 442 |
The production of Ferrotitanium, an alloy of titanuim and iron, has been greatly improved by the introduction of induction furnaces. The combination o...
|
Capacity : Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum |
Plant and Machinery cost: 1200 |
|
Working Capital : N/A |
Rate of Return (ROR): 27 |
|
Break Even Point (BEP): 35 |
TCI :
|
|
Cost of Project : 6000 |
Monocrystalline Silicon Ingots are cylindrical, single-crystal structures composed of silicon that are formed in a process that guarantees uniform lat...
|
Capacity : Monocrystalline Silicon Ingots 400 Kgs Per Day |
Plant and Machinery cost: 178 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 45 |
TCI :
|
|
Cost of Project : 555 |
Urea from Natural Gas is a fantastic and new method for the production of fertilizer. In this model, the production of urea is dependent on the natura...
|
Capacity : Urea Fertilizer 100 MT Per Day |
Plant and Machinery cost: 1598 |
|
Working Capital : N/A |
Rate of Return (ROR): 26 |
|
Break Even Point (BEP): 62 |
TCI :
|
|
Cost of Project : 3300 |
Processing of cenospheres delivered from fly ash is the collection and refinement process of cenospheres from the fly ash post the extraction of coal/...
|
Capacity : Cenosphere 5,000 MT per annum |
Plant and Machinery cost: 179 |
|
Working Capital : N/A |
Rate of Return (ROR): 29 |
|
Break Even Point (BEP): 63 |
TCI :
|
|
Cost of Project : 629 |
Sorbitol is a sugar alcohol that is used as a sweetener in a variety of foods and drinks. Sorbitol is lower in calories compared to other sugars and i...
|
Capacity : Sorbitol 6 MT Per Day |
Plant and Machinery cost: 431 |
|
Working Capital : N/A |
Rate of Return (ROR): 28 |
|
Break Even Point (BEP): 47 |
TCI :
|
|
Cost of Project : 790 |