For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Hose design is based on a combination of application and performance. Common factors are size, pressure rating, weight, length, straight hose or coil...
|
Capacity : Automobile Hoses: 4000 Nos./Day |
Plant and Machinery cost: 47 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 70.00 |
TCI : 185 lakhs |
|
Cost of Project : 18500000 |
PAC, short for polyanionic cellulose, is a kind of water-soluble cellulose ether derivative made from natural cellulose by chemical modification, and...
|
Capacity : Polyanionic Cellulose (PAC): 3 MT /Day |
Plant and Machinery cost: 113 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 418 lakhs |
|
Cost of Project : 41800000 |
PSC poles stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These p...
|
Capacity : Pre-Stressed Concrete Electric Poles: 200 Nos./Day |
Plant and Machinery cost: 158 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 462 lakhs |
|
Cost of Project : 46200000 |
The production of fish meal from fish offal and surplus fish benefits both the national economy and the fisherman and should not be regarded as a salv...
|
Capacity : Fish Feed: 30 MT/Day Prawn Feed: 30 MT/Day |
Plant and Machinery cost: 84 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs 390 lakhs |
|
Cost of Project : 39000000 |
Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other ingredients. It is an agricultu...
|
Capacity : Sada Pan Masala : 165 Kgs /Day Meetha Pan Masala: 165 Kgs /Day Zarda Pan Masala: 170 Kgs /Day |
Plant and Machinery cost: Rs 12 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs 191 lakhs |
|
Cost of Project : 19100000 |
Dairy farming is a class of agriculture for long-term production of milk, which is processed for eventual sale of a dairy product. Dairying is an impo...
|
Capacity : Cow Milk (Ltrs.): 756000 Units /Annum Manure (MT): 1080 Units /Annum Calf (Nos.): 126 Units /Annum |
Plant and Machinery cost: 47 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 529 lakhs |
|
Cost of Project : 52900000 |
Animal production has been taking place over a long time, with the availability of compound feed being only a relatively recent innovation. This is a...
|
Capacity : Cattle Feed: 64 MT/Day Poultry Feed: 32 MT/Day Pre-Mix Feed: 4 MT/Day |
Plant and Machinery cost: 133 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project: Rs 543 lakhs |
|
Cost of Project : 54300000 |
The term “adhesive” refers to a viscoelastic material which adheres instantaneously to most substrates with the application of slight pressure and rem...
|
Capacity : 2000 Kgs./Day |
Plant and Machinery cost: 47 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 251 lakhs |
|
Cost of Project : 25100000 |
Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when wet and provides both water...
|
Capacity : 12000 Pcs./Day |
Plant and Machinery cost: 68 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs 270 lakhs |
|
Cost of Project : 27000000 |
Hydropower is a renewable energy resource that utilizes Earth’s water cycle to generate electricity. The movement of water flow downstream in lakes an...
|
Capacity : 10 MW |
Plant and Machinery cost: 6100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: 8014 Lakhs |
|
Cost of Project : 801400000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : I.V. Fluid (500 ml.): 48000 Bottles /Day |
Plant and Machinery cost: Rs 252 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 833 lakhs |
|
Cost of Project : 83300000 |
Silicon is the most abundant element in Earth's crust. It is found in rocks, sand, clays and soils, combined with either oxygen as silicon dioxide, or...
|
Capacity : Silicon Metal: 25 MT /Day |
Plant and Machinery cost: Rs 1277 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 2484 lakhs |
|
Cost of Project : 248400000 |