For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consumer p...
|
Capacity : Bio-Plastic Glasses (wt. each Glass 16 gms): 62500 Pcs./Day Bio-Plastic Plates (wt. each Plate 40 gms): 25000 Pcs./Day Bio-Plastic Bags (wt. each Bag 100 gms): 10000 Pcs./Day |
Plant and Machinery cost: Rs 155 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 718 lakhs |
|
Cost of Project : 71800000 |
Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, although many can also be used...
|
Capacity : Turmeric Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Coriander Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Red Chilly Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Cumin Powder (50 gms Packs): 4 Kgs./Day Black Pepper (50 gms Packs) |
Plant and Machinery cost: Rs 4 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 77.00 |
TCI : Cost of Project: Rs 10 lakhs |
|
Cost of Project : 1000000 |
Calcium gluconate is the calcium salt of gluconic acid. In order for the product to be registered as a food fortificant, it must be prepared at high p...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs 63 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 208 lakhs |
|
Cost of Project : 20800000 |
The sun energy reaches Earth as UV, visible and infrared radiation. The last one is largely responsible for heat build-up.© Solar radiation, visible r...
|
Capacity : Infrared Reflected (IR) Paint: 300 Ltrs. /Day |
Plant and Machinery cost: Rs 33 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project: Rs 196 lakhs |
|
Cost of Project : 19600000 |
Areca nut is the nut of areca palm. Biological name of areca nut palm is Areca catechu and it is a member of the family arecaceae or palmal. It is als...
|
Capacity : Supari: 500 Kgs. /Day Tannin: 33 Kgs. /Day Brushes/Rope: 250 Kgs. /Day Pan Masala: 500 Kgs. /Day |
Plant and Machinery cost: Rs 42 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 191lakhs |
|
Cost of Project : 19100000 |
An important part of this power system is the cable system that is used exclusively to carry power from the main substations to secondary substations...
|
Capacity : PVC Wires and Cables: 10 KMTRS/Day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 444 lakhs |
|
Cost of Project : 44400000 |
Plastics have become an indispensable part in today’s world. Due to their light weight, durability, energy efficiency, coupled with faster rate of pro...
|
Capacity : Pyrolysis Oil: 10 MT/Day Carbon (by product) :3 MT/Day Gas (by product) : 2 MT/Day |
Plant and Machinery cost: Rs 118 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 446 lakhs |
|
Cost of Project : 44600000 |
A dental impression is a negative imprint of hard (teeth) and soft tissues in the mouth from which a positive reproduction (cast or model) can be form...
|
Capacity : Composite Resin Poly Carboxylate Cement (500 gms Pack): 80 Packs/ Day Glass Ionomer Cement (15 gms Packs with 10 gm Liquid): 1333 Packs/ Day Composite Resin Poly Carboxylate Cement (500 gms Pack):40 Packs/ Day |
Plant and Machinery cost: 26 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 75.00 |
TCI : Cost of Project: Rs 71 lakhs |
|
Cost of Project : 7100000 |
Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
A cotton ball is a ball of soft fiber that is primarily used for medical or cosmetic purposes, but can be used for other purposes such as arts and cra...
|
Capacity : 1,200 Pkts/Day |
Plant and Machinery cost: 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project: Rs 86 lakhs |
|
Cost of Project : 8600000 |
Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other ingredients. It is an agricultu...
|
Capacity : Sada Pan Masala: 165 Kgs/Day Meetha Pan Masala: 165 Kgs/Day Zarda Pan Masala : 170 Kgs/Day |
Plant and Machinery cost: 12 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 191 lakhs |
|
Cost of Project : 19100000 |
Fevicol type adhesives come under the category of synthetic resins and latex adhesives are made from polyvinyl acetate is a thermoplastic, odorless, t...
|
Capacity : 3MT/Day |
Plant and Machinery cost: 38 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs 183 lakhs |
|
Cost of Project : 18300000 |