- Strategic Regional Positioning: Malawi is not part of the landlocked but well-connected via Mozambique and Tanzania to regional transport routes and benefits from trade preferences under SADC and COMESA. This creates expanded access to Southern and Eastern African markets.
- Rich Agricultural Base: The economy of Malawi is heavily dependent on agriculture and a key source of employment. Tobacco, maize, tea, sugar, cassava, groundnuts and horticultural produce are the key crops ensuring steady growth in agro-processing and value addition inputs.
- Abundant Freshwater & Fisheries: Lake Malawi is teeming with freshwater fish. Hence, one of Africa's largest lakes acts as the source, processing and potential for cold chain and exports.
- Emerging Renewable Energy Potential: Despite predominantly Rural Electrification (hydropower potential in Shire River) and Solar (for the southern half of the country), there is limited but growing governmental and donor interest towards grid and off-grid applications enabling the private sector to lead in distributed renewable projects and energy services.
Entrepreneurs can prioritise sectors that match Malawi’s resources and market gaps:
Malawian authorities offer targeted incentives to encourage investment:
In view of the consistency in terms of the resources used and the policy outcomes realized, the following products and services are the most competitive;... Besides, the Farmer Supply Chain, Off-grid energy solutions and export quality standards which will also be relatively competitive....
Please choose a project below related to this category.
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term ma...
|
Capacity : -- |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |
Vacuum distillation is the distillation process of separating liquids boiling above 150°C at 1 atm from Nonvolatile impurities. Another liquid is boil...
|
Capacity : Creosote Oil 1875 MT/Annum,Phenolic or Carbolic Oil 300 MT/Annum,Naphthalic Oil 900 MT/Annum,Wash Oil 600 MT/Annum,Light Oil 75 MT/Annum, Medium Soft Pitch 3750 MT/Annum |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 323 Lakhs |
|
Cost of Project : 0 |
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications inc...
|
Capacity : 60,000 MT/Annum |
Plant and Machinery cost: 438 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 1214 Lakhs |
|
Cost of Project : 121400000 |
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |