Entrepreneurs can focus on sectors that build on local strengths and generate employment:
1. Agro-Processing and Food Items: Some spices that are treated like ginger and turmeric, rice and things made from it;
2. Roasting seeds of sunflower / Making seeds of pumpkin; Cold pressing oils, fruit pulp and juices
3. Bamboo Work and Extra Products: bamboo items-furniture that is made from bamboo;
4.Hand-made products: floors, furniture 5, parts for furniture, arts, paper mix/bamboo charcoal bits/pellets along with other hand-made things etc. Using cheap raw stuff and the good look of bamboo.
5.Handloom, silk farming, and cloth: threads of great fibers and design-focused fabric, including handloom chains working well in making yarns, fabrics ready for brands made from regular cotton with hand sewing finish; branded traditional clothes and home cloth mainly for selling abroad fishery, fish farming, and fish͏ making:
Investors can typically access support through state and central northeast-focused schemes, which may include:
Money help and tax breaks for jobs on the main list. Land sharing and ready-to-use buildings in work areas. Loan aid and interest cuts for small firms and farm businesses. Help for shared service spots in cloth making and food factories. Support to reach markets—trade events, brand boosts, and online selling help. Unique deals for companies near borders and plans that help trade across boundaries.
To sum up, Manipur has a strong mix of resources, culture, good spots on the map, and special products. People who put money or start projects that match local skills: farm work, bamboo and cloth making, fishing, eco-fri͏endly travel and border trade can make big differences in society and earn good profits. Manipur could be a tough supplier in the area of top-quality green goods that are different due to culture with group efforts certifications of quality along with smart investments in infrastructure
Please choose a project below related to this category.
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by which...
|
Capacity : Washing & Iron: 700.0 Pcs/ day |
Plant and Machinery cost: Rs 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 145 Lakhs |
|
Cost of Project : 14500000 |
Powdered milk is a dairy product produced from cow milk. Cow milk basically contains water, fats, protein sugar and ash. About 86% to 88% of cow milk...
|
Capacity : Skimmed Milk Powder 8.00 MT/Day • Whole Milk Powder 2.67 MT/Day • Dairy Whitener 1.50 MT/Day |
Plant and Machinery cost: Rs 387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 973 Lakhs |
|
Cost of Project : 97300000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 700 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : Rs 31862 Lakhs |
|
Cost of Project : 3186200000 |
The generation, transmission, and distribution of power involve electrical facilities, apparatus, and components, to carry the electrical energy from...
|
Capacity : Single Core Wires (THHN/THWN) 60 KM/Day,Single Core Stranded (CU/PVC)45 KM/Day,Multiple-Core Flexible-Wire (Sheathed)21 KM/Day |
Plant and Machinery cost: Rs 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project: Rs 189 Lakhs |
|
Cost of Project : 18900000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature re...
|
Capacity : 3000 MT |
Plant and Machinery cost: Rs 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 882 Lakhs |
|
Cost of Project : 88200000 |
A mattress is a large pad for supporting the reclining body, used as or on a bed. Mattresses may consist of a quilted or similarly fastened case, usua...
|
Capacity : Mattress 200 Nos/Day, Quilt:1000 Nos/Day |
Plant and Machinery cost: Rs 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 364 Lakhs |
|
Cost of Project : 36400000 |
An adhesive is any substance applied to the surfaces of materials that binds them together and resists separation. The term "adhesive" may be used int...
|
Capacity : Contact Adhesive: 160 Kgs/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 220 Lakhs |
|
Cost of Project : 22000000 |
The research report titled ‘Emerging Opportunities in Booming Indian Beer Industry (Why to Invest, Core Project Financials, Potential Buyers, Market S...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : -- |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The production of alcohol is based upon fermentation, the natural process of decomposition of organic materials containing carbohydrates. It occurs in...
|
Capacity : 150 Lakh Bottles/Annum |
Plant and Machinery cost: Rs. 290 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs. 1268 Lakhs |
|
Cost of Project : 126800000 |