Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather patterns. Hydrogen, in the capa...
|
Capacity : Solar Power: 1 MW |
Plant and Machinery cost: Rs. 411 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs.811 lakhs |
|
Cost of Project : 81100000 |
Billets A semi-finished product obtained by forging, rolling or continuously casting, usually square (not exceeding 125 mm×125 mm in cross-section) wi...
|
Capacity : M.S. Billets (Size 80x80 mm to 140x140 mm): 180 MT/Day |
Plant and Machinery cost: Rs. 1565 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs. 3343 lakhs |
|
Cost of Project : 334300000 |
A thinner is a solvent used to thin oil-based paints or clean up after their use. Commercially, solvents labeled "Paint Thinner" are usually mineral s...
|
Capacity : Thinner (1 Ltrs Size): 4000 Bottles/Day Solvent Thinner (1 Ltrs Size): 4000 Bottles/Day |
Plant and Machinery cost: Rs 198 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs395 lakhs |
|
Cost of Project : 39500000 |
Dehydration process appears to be a variation on the air-drying process and is based on the principle of vapor pressure differentials, using air circu...
|
Capacity : Dehydrated Onion Sliced/Chopped: 300 MT/Annum Cattle Feed as by product: 210 MT/Annum |
Plant and Machinery cost: Rs. 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs199 lakhs |
|
Cost of Project : 19900000 |
This pre-feasibility report on Speciality/ Multi-speciality hospital consists of the feasibility detailing for three models of hospitals namely 30 bed...
|
Capacity : Super Speciality Hospital: 30 bedded |
Plant and Machinery cost: Rs. 113 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs. 978 lakhs |
|
Cost of Project : 97800000 |
A fastener is a connective mechanism that mechanically joins or affixes two ormore objects together. A bolt is an externally threaded fastener designe...
|
Capacity : Mild Steel/HT Bolts (DR M8-M16): 20 MT/Day Mild Steel/HT Nuts (DR M18-M30): 6 MT/Day |
Plant and Machinery cost: Rs. 378 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs.744 lakhs |
|
Cost of Project : 74400000 |
LPG cylinder filling plants vary considerably in size, complexity and layout. The type and size depends on such factors as maximum potential throughpu...
|
Capacity : LPG Cylinders (14.2 Kgs Size): 1000 Cylinders/Day LPG Cylinders (19 Kgs Size): 1000 Cylinders/Day |
Plant and Machinery cost: Rs.110 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs. 427 lakhs |
|
Cost of Project : 0 |
Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are thermoplastic materials which are pr...
|
Capacity : Bio-Plastic Glasses (wt. each Glass 16 gms): 62500 Pcs/Day Bio-Plastic Plates (wt. each Plate 40 gms): 25000 Pcs/Day Bio-Plastic Bags (wt. each Bag 25 gms): 40000 Pcs/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs789 lakhs |
|
Cost of Project : 78900000 |
Industrial gas is a group of materials that are specifically manufactured for use in industry and are also gaseous at ambient temperature and pressure...
|
Capacity : Oxygen Gas (7M3 each Cylinder): 300 Nos/Day Nitrogen Gas (7M3 each Cylinder): 100 Nos/Day |
Plant and Machinery cost: Rs. 177 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs. 307 lakhs |
|
Cost of Project : 30700000 |
Virgin coconut oil (VCO) is the oil obtained from the fresh and mature kernel of coconut by mechanical or natural means, with or without the use of he...
|
Capacity : Virgin Coconut Oil: 500 Ltrs/Day Defatted Coconut Powder: 208 Kgs/Day |
Plant and Machinery cost: Rs.139 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs. 622 lakhs |
|
Cost of Project : 62200000 |
Palm oil is a fatty edible vegetable oil, yellowish in color, derived from the flesh and the kernel of the fruit of the oil palm tree. The oil palm tr...
|
Capacity : Palm Oil: 500 Ltrs/Day Palm Kernel: 115 Kgs/Day Palm Fibres (Cake): 500 Kgs/ Day |
Plant and Machinery cost: Rs. 32 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs75 lakhs |
|
Cost of Project : 7500000 |
Hot Melt Adhesives Production for Corrugated Board. Investment Opportunities in Manufacturing of Packaging Adhesives The hot melt adhesives are t...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |