Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Phosphates play a vital role in the balanced nutrition of plants. Most of the soils in India are low to medium in phosphate (P) content which requires...
|
Capacity : Phosphate Rich Organic Manure (PROM): 1000000 MT /Annum |
Plant and Machinery cost: Plant & Machinery: Rs 290 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : Rs 4612 lakhs |
|
Cost of Project : 461200000 |
Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in sterilized...
|
Capacity : Disposable Plastic Syringes 2 ml Size: 350 Boxes/day Disposable Plastic Syringes 5 ml Size: 350 Boxes/day Disposable Plastic Syringes 10 ml Size: 200 Boxes/day Disposable Plastic Syringes 50 ml Size: 100 Boxes/day |
Plant and Machinery cost: Rs 151 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 343 lakhs |
|
Cost of Project : 34300000 |
Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, bulb) of plants used as a flavoring or seasoning, although many can also be used as...
|
Capacity : Red Chilli Powder: 200 Kgs. /day Sambhar Masala : 200 Kgs. /day Biryani Masala: 200 Kgs. /day Chicken Fry Masala: 200 Kgs. /day Garam Masala: 200 Kgs. /day |
Plant and Machinery cost: Rs 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 204 lakhs |
|
Cost of Project : 20400000 |
Craft beer is a type of beer brewed in a traditional manner and usually produced in smaller quantities than that of the conventional beer. The product...
|
Capacity : - |
Plant and Machinery cost: -- |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A condom is a sheath-shaped obstruction device used during sexual intercourse. It is very beneficial for reducing the chances of pregnancy. It also de...
|
Capacity : 116,666.7 Pcs /Day |
Plant and Machinery cost: 139.00 Lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project 400.00Lakhs |
|
Cost of Project : 40000000 |
Fluids are given when someone's body fluid volume falls. There are a number of things which can cause a drop in fluid volume. Vomiting and diarrhea ar...
|
Capacity : 48,000 Bottles/Day 500 ml each bottle |
Plant and Machinery cost: 253.00 Lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project 834.00Lakhs |
|
Cost of Project : 83400000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : 48,000 Bottles/Day 500 ml each bottle |
Plant and Machinery cost: 253 Lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 834 Lakhs |
|
Cost of Project : 83400000 |
Bentonite comes under the speciality of clay (Aluminium Hydrosilicate), which has large used in the chemical industries, oil refineries industries, co...
|
Capacity : ABE Dry Process Bentonite: 720 MT/Day ABE Wet Process Bentonite: 60 MT/Day Sodium Grade Bentonite: 74 MT/Day |
Plant and Machinery cost: Rs 1994 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 6132 lakhs |
|
Cost of Project : 613200000 |
Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consumer p...
|
Capacity : Bio-Plastic Glasses (wt. each Glass 16 gms): 62500 Pcs./Day Bio-Plastic Plates (wt. each Plate 40 gms): 25000 Pcs./Day Bio-Plastic Bags (wt. each Bag 100 gms): 10000 Pcs./Day |
Plant and Machinery cost: Rs 155 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 718 lakhs |
|
Cost of Project : 71800000 |
Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, although many can also be used...
|
Capacity : Turmeric Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Coriander Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Red Chilly Powder (50, 100 & 200 gms Packs): 14 Kgs./Day Cumin Powder (50 gms Packs): 4 Kgs./Day Black Pepper (50 gms Packs) |
Plant and Machinery cost: Rs 4 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 77.00 |
TCI : Cost of Project: Rs 10 lakhs |
|
Cost of Project : 1000000 |
Calcium gluconate is the calcium salt of gluconic acid. In order for the product to be registered as a food fortificant, it must be prepared at high p...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs 63 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 208 lakhs |
|
Cost of Project : 20800000 |
The sun energy reaches Earth as UV, visible and infrared radiation. The last one is largely responsible for heat build-up.© Solar radiation, visible r...
|
Capacity : Infrared Reflected (IR) Paint: 300 Ltrs. /Day |
Plant and Machinery cost: Rs 33 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project: Rs 196 lakhs |
|
Cost of Project : 19600000 |