1. Hydropower and distributed renewable energy
What: run-of-river plants, small hydro plants for groups, solar + batteries for off-grid villages, hybrid systems for mines/tourist centers.
Reason: High domestic demand and export potential TO India; Reliable, low-cost electricity empowers other industries.
2. Agricultural processing and cold chain
What: Fruit pulp, dried fruit, cold storage, fruit juice, spice processing (cardamom, ginger), vegetable processing, ready-to-eat mountain foods.
The reason: reducing post-harvest losses, increasing farmers' income, and making branded Himalayan foods for export.
3. Tourism, catering and experience economy
What: Eco-accommodations, community accommodations, spas/Ayurveda, adventure logistics (porters, guides), winter and off-season packages.
Reason: High revenue per visitor if quality , quality and safety , safety are guaranteed; Distribution of income among rural communities.
4. High value specialized agriculture and horticulture
What: Organic tea, specialty coffee, apple/kiwi orchards, greenhouse vegetables, flower growing for export.
The reason: Excellent prices for ethically produced goods grown at altitude.
5. Processing of medicinal and aromatic plants
What: essential oils, herbal extracts, nutrients and small-batch natural cosmetics based on Himalayan plants.
The reason: Global demand for natural , natural products is increasing – but requires traceability and sustainable collection.
6. Handicrafts, carpets and lifestyle brands
What: Hand-knotted wool/rugs, pashmina blends, metalwork and ethically sourced home furnishings sold through e-commerce and boutiques.
Reason: Strong premium international market , market for authentic Himalayan handicrafts.
7. IT, BPO and remote services
What: Software development, fintech services, remote customer support and digitization services from Kathmandu, Pokhara and regional centers.
The reason: lower operating costs and growing technical talent.
8. Light industry and building materials
What: Value-added wood products (sustainably sourced), earthquake-resistant bricks/tiles, prefabricated panels and eco-friendly insulation.
Reason: Urbanization and reconstruction needs create constant local demand.
9. Aquaculture and fishing in the Terai/Lowlands
What: Pond culture, tilapia and carp farming, hatcheries, feed mills.
The reason: protein , protein demand, import substitution and livelihood diversification.
10. Logistics, cold chain and last mile services
What: Integrated cold , cold chain operators, refrigerated shipping, packing , packing centers and assembly centers.
The reason: its a critical enabler of agricultural processing and exports to remote hills.
Nepal has different subsidy programs for the sectors considered as the country's priorities (hydropower, export-oriented manufacturing, IT parks, tourism). The promotion of investment is generally the work of different agencies like the Board of Investment and the Ministry of Industry; The provincial local investment promotion offices are also available for support. Since the incentives, tax regulations and licensing procedures are in a state of flux, it is advisable to check with the government agencies and take the opinion of local legal/financial advisors before making a capital investment.
The combination of Nepal's hydropower potential, unique mountain agriculture, world-class tourism assets and strong craft traditions creates a number of promising business avenues – from hydro-powered agricultural processing and Himalayan power plants to responsible tourism, IT services and artisan brands. The most successful projects will be those that add value close to the source, solve local infrastructure problems (energy, cold chain, transport), partner with communities, and meet high environmental and quality standards.
Please choose a project below related to this category.
The sun energy reaches Earth as UV, visible and infrared radiation. The last one is largely responsible for heat build-up.© Solar radiation, visible r...
|
Capacity : Infrared Reflected (IR) Paint: 300 Ltrs. /Day |
Plant and Machinery cost: Rs 33 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project: Rs 196 lakhs |
|
Cost of Project : 19600000 |
The control panels are enclosures fabricated out of sheet metal which can be open, semi enclosed or totally enclosed type. They direct and control ele...
|
Capacity : Control Panels (Cabinet): 40MT/Day |
Plant and Machinery cost: Rs 163 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs 499 lakhs |
|
Cost of Project : 49900000 |
Areca nut is the nut of areca palm. Biological name of areca nut palm is Areca catechu and it is a member of the family arecaceae or palmal. It is als...
|
Capacity : Supari: 500 Kgs. /Day Tannin: 33 Kgs. /Day Brushes/Rope: 250 Kgs. /Day Pan Masala: 500 Kgs. /Day |
Plant and Machinery cost: Rs 42 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 191lakhs |
|
Cost of Project : 19100000 |
An important part of this power system is the cable system that is used exclusively to carry power from the main substations to secondary substations...
|
Capacity : PVC Wires and Cables: 10 KMTRS/Day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 444 lakhs |
|
Cost of Project : 44400000 |
Cross-linked sodium carboxymethyl cellulose is also known as croscarmellose sodium or modified cellulose gum. Crosslinked sodium carboxymethylcellulos...
|
Capacity : Cross Linked Sodium Carboxymethyl Cellulose: 1000 Kgs./Day |
Plant and Machinery cost: Rs 34 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : Rs 144 lakhs |
|
Cost of Project : 14400000 |
Plastics have become an indispensable part in today’s world. Due to their light weight, durability, energy efficiency, coupled with faster rate of pro...
|
Capacity : Pyrolysis Oil: 10 MT/Day Carbon (by product) :3 MT/Day Gas (by product) : 2 MT/Day |
Plant and Machinery cost: Rs 118 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 446 lakhs |
|
Cost of Project : 44600000 |
A dental impression is a negative imprint of hard (teeth) and soft tissues in the mouth from which a positive reproduction (cast or model) can be form...
|
Capacity : Composite Resin Poly Carboxylate Cement (500 gms Pack): 80 Packs/ Day Glass Ionomer Cement (15 gms Packs with 10 gm Liquid): 1333 Packs/ Day Composite Resin Poly Carboxylate Cement (500 gms Pack):40 Packs/ Day |
Plant and Machinery cost: 26 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 75.00 |
TCI : Cost of Project: Rs 71 lakhs |
|
Cost of Project : 7100000 |
Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
The most widely used thermoplastic polyester is poly ethlene terephthalate (long-chain molecule consists of repeating units shown as figure right) or...
|
Capacity : 100,000Nos. /Day |
Plant and Machinery cost: Rs 101 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 290 lakhs |
|
Cost of Project : 29000000 |
A cotton ball is a ball of soft fiber that is primarily used for medical or cosmetic purposes, but can be used for other purposes such as arts and cra...
|
Capacity : 1,200 Pkts/Day |
Plant and Machinery cost: 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project: Rs 86 lakhs |
|
Cost of Project : 8600000 |
Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other ingredients. It is an agricultu...
|
Capacity : Sada Pan Masala: 165 Kgs/Day Meetha Pan Masala: 165 Kgs/Day Zarda Pan Masala : 170 Kgs/Day |
Plant and Machinery cost: 12 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 191 lakhs |
|
Cost of Project : 19100000 |
Fevicol type adhesives come under the category of synthetic resins and latex adhesives are made from polyvinyl acetate is a thermoplastic, odorless, t...
|
Capacity : 3MT/Day |
Plant and Machinery cost: 38 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs 183 lakhs |
|
Cost of Project : 18300000 |