Successful startups in Niger focus on:
1. Agricultural processing and agribusiness
2. Livestock breeding and meat processing
3. Renewable energy (solar and wind energy)
4. Mining and value addition
5. Building materials and infrastructure
6. Water management and irrigation technology
7. Logistics and delivery services
8. Tourism and handicrafts
The Niger Investment Law brings many benefits to both local and foreign investors, these benefits include:
Niger has the mix of nature, young population and good relations with neighboring countries that make it a potential area for environmentally friendly business ventures. The top openings are in agri-processing, animal husbandry, clean energy, building materials, freight and mining, and mining services.
Business owners who concentrate on adding local value, saving resources and development led by the community will discover a rich soil in Niger to grow businesses that are not only financially viable, but also sustainable and socially impactful in the center of West Africa.
Please choose a project below related to this category.
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The disposable plastic syringe has become an important part of...
|
Capacity : - |
Plant and Machinery cost: Rs.113 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.288 Lakhs |
|
Cost of Project : 28800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : - |
Plant and Machinery cost: Rs.219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.489 Lakhs |
|
Cost of Project : 48900000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 33600 NOS./Day |
Plant and Machinery cost: 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 287 Lakhs |
|
Cost of Project : 28700000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |