Successful startups in Niger focus on:
1. Agricultural processing and agribusiness
2. Livestock breeding and meat processing
3. Renewable energy (solar and wind energy)
4. Mining and value addition
5. Building materials and infrastructure
6. Water management and irrigation technology
7. Logistics and delivery services
8. Tourism and handicrafts
The Niger Investment Law brings many benefits to both local and foreign investors, these benefits include:
Niger has the mix of nature, young population and good relations with neighboring countries that make it a potential area for environmentally friendly business ventures. The top openings are in agri-processing, animal husbandry, clean energy, building materials, freight and mining, and mining services.
Business owners who concentrate on adding local value, saving resources and development led by the community will discover a rich soil in Niger to grow businesses that are not only financially viable, but also sustainable and socially impactful in the center of West Africa.
Please choose a project below related to this category.
BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...
|
Capacity : Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size: 1,500 Kgs per day |
Plant and Machinery cost: 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: 396 Lakhs |
|
Cost of Project : 39600000 |
Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in sterilized...
|
Capacity : Disposable Plastic Syringes: 460 Boxes/Day |
Plant and Machinery cost: Rs. 115 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project: Rs. 289 lakhs |
|
Cost of Project : 28900000 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 13333 Sq.mt./Day |
Plant and Machinery cost: Rs. 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project: Rs 3394 lakhs |
|
Cost of Project : 339400000 |
E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...
|
Capacity : E Rickshaw: 4 Nos./Day |
Plant and Machinery cost: Rs. 28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 323 lakhs |
|
Cost of Project : 32300000 |
An automotive battery is a rechargeable battery that supplies electrical current to a motor vehicle. Its main purpose is to feed the starter, which st...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Gypsum Mining Business. Investment and Business Opportunity in Mineral & Mining Sector Gypsum is an evaporite mineral most commonly found in laye...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Ferro Molybdenum. Opportunities in Ferromolybdenum, Ferroalloys Industry Ferromolybdenum is an alloy formed by combining iron and m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle Assembling Industry E-Rickshaws are small vehicles, with thr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Ferromolybdenum alloys are principally produced commercially by thermite process by which ingots or buttons of the alloy can be produced. They impart...
|
Capacity : Ferro Molybdenum: 10 MT/Day |
Plant and Machinery cost: Rs. 135 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs776 lakhs |
|
Cost of Project : 77600000 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 50000 Sq.mt./Day |
Plant and Machinery cost: Rs 1605 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project : Rs12502 lakhs |
|
Cost of Project : 1250200000 |