Please choose a project below related to this category.
In the ever-evolving landscape of the electrical and power generation sector, power transformers remain a critical component for effective energy tran...
|
Capacity : Power Transformers (132/33KV, 10000KVA Core Type Oil Cooled): 120 Nos Per Annum |
Plant and Machinery cost: 111 |
|
Working Capital : N/A |
Rate of Return (ROR): 33 |
|
Break Even Point (BEP): 73 |
TCI :
|
|
Cost of Project : 289 |
Curcumin, the bioactive compound found in turmeric, has emerged as a high-demand ingredient across industries such as pharmaceuticals, nutraceuticals,...
|
Capacity : Curcumin Powder: 25 Kgs Per Day Turmeric Oil: 25 Kgs Per Day Deoiled Turmeric: 463 Kgs Per Day |
Plant and Machinery cost: 120 |
|
Working Capital : N/A |
Rate of Return (ROR): 30 |
|
Break Even Point (BEP): 63 |
TCI :
|
|
Cost of Project : 240 |
Chemically, sodium chlorite has the formula NaClO2. It is a white, crystalline material that is non-flammable and odourless. It is employed in industr...
|
Capacity : Sodium Chlorite (NaClO2: 15 MT Per Day |
Plant and Machinery cost: 567 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: 1892 Lakhs |
|
Cost of Project : 189200000 |
A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs are distinguished by much larger b...
|
Capacity : 50 Nos./day |
Plant and Machinery cost: 95 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 279 lakhs |
|
Cost of Project : 27900000 |
Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder and Cake Business Detergent is a blend of surfactants with cleanin...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Business Opportunities in Electric Two-Wheelers Manufacturing Industry...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...
|
Capacity : 90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 1076 lakhs |
|
Cost of Project : 107600000 |
Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matches Production Matchsticks are a very handy tool used in starting...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bauxite Calcination Plant by Rotary Kiln with Fine Grinding Ball Mill. Refractory Grade Calcined Bauxite Calcined bauxite is produced by sintering/ca...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |