Please choose a project below related to this category.
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe and v...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...
|
Capacity : - |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 22 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : - |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 100 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 3000000 Bottles/Annum |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 108 Lakhs |
|
Cost of Project : 0 |
Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and pu...
|
Capacity : 500 MW |
Plant and Machinery cost: 143200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 158700 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 60000000 Nos. Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 454 Lakhs |
|
Cost of Project : 0 |
Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly and v...
|
Capacity : 4800 MT/Annum |
Plant and Machinery cost: 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 129 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)/Annum,Drinking Water Jar – 720000 Nos. Jar (20 Ltr.)/Annum |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : - |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs (W/C 1 Month) |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 6,00,00,000 Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 455 Lakhs |
|
Cost of Project : 0 |
Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices bu...
|
Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 923 Lakhs |
|
Cost of Project : 0 |