Please choose a project below related to this category.
In igneous rocks, which comprise 95% of the earth’s crust the average percentage concentration of manganous oxide is 0.124. This is small in compared...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 256 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project:691 Lakhs. |
|
Cost of Project : 69100000 |
Disposable Syringes made of plastic Material have been successfully used in medical and pharmaceutical practice for many years. The constantly increas...
|
Capacity : Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos./Day.,Syringes (10 ml):14,000.0 Nos./Day. |
Plant and Machinery cost: Rs.174 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project :Rs.515 Lakhs. |
|
Cost of Project : 51500000 |
Ferro manganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points than...
|
Capacity : Ferro Silicon:59.0 MT/Day.,Ferro Manganese:167.0 MT/Day.,Silico Manganese:130.5 MT/Day. |
Plant and Machinery cost: Rs.2493 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project :Rs4280 Lakhs. |
|
Cost of Project : 428000000 |
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |
Amino acid chelates consists of a metal ion comprising iron, zinc, manganese, magnesium, copper, calcium and mixtures thereof. These cheltaes are mos...
|
Capacity : - |
Plant and Machinery cost: Rs.161 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost Of Project : Rs.502 Lakhs |
|
Cost of Project : 50200000 |
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The disposable plastic syringe has become an important part of...
|
Capacity : - |
Plant and Machinery cost: Rs.113 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.288 Lakhs |
|
Cost of Project : 28800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : - |
Plant and Machinery cost: Rs.219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.489 Lakhs |
|
Cost of Project : 48900000 |
Titanium dioxide, also known as titanium(IV) oxide or titania, is the naturally occurring oxide of titanium,...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Manganese is used in metallurgical industries in the form of ferro manganese. Ferro manganese contains about 80% Mn and 20% Fe. Generally ferro mangan...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 803 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 2695 Lakhs |
|
Cost of Project : 269500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 33600 NOS./Day |
Plant and Machinery cost: 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 287 Lakhs |
|
Cost of Project : 28700000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |