Please choose a project below related to this category.
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitors: 5 Kgs /Day Plastic Granules: 2333.33 Kgs /Day Copper Wire Scraps: 13.33 Kgs /Day Glass from CRT: 133.33 Kgs /Day Other Metals: 566.67 Kgs /Day |
Plant and Machinery cost: 100 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 325 lakhs |
|
Cost of Project : 32500000 |
A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. Bicycles are one of th...
|
Capacity : Bicycles (Different Sizes): 1000 Nos. /Day Cycle Rickshaw: 1000 Nos. Day |
Plant and Machinery cost: Rs 336 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 1525 lakhs |
|
Cost of Project : 152500000 |
Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in sterilized...
|
Capacity : Disposable Plastic Syringes 2 ml Size: 350 Boxes/day Disposable Plastic Syringes 5 ml Size: 350 Boxes/day Disposable Plastic Syringes 10 ml Size: 200 Boxes/day Disposable Plastic Syringes 50 ml Size: 100 Boxes/day |
Plant and Machinery cost: Rs 151 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 343 lakhs |
|
Cost of Project : 34300000 |
Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...
|
Capacity : Bicycles (Different Sizes): 2000 Nos./day |
Plant and Machinery cost: 336 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1589 lakhs |
|
Cost of Project : 158900000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Copper Wire:1.67 MT/day Plastic Granules:7.43 MT/day Glass :3.23 MT/day Ferrous Metal |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: Rs 1272 lakhs |
|
Cost of Project : 127200000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum |
Plant and Machinery cost: 498 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 0 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 7500 MT/annum |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: 272 lakhs |
|
Cost of Project : 127200000 |
Disposable cups, glasses, plates and spoons are used in daily life nowadays. In addition to be used at home these are largely used during at parties a...
|
Capacity : Thermocol Plates: 15,000 Th. Nos/annum Thermocol Dona: 15,000 Th. Nos/annum ThermocolThali:15,000 Th. Nos/annum Thermocol Glass:15,000 Th. Nos/annum Paper |
Plant and Machinery cost: Rs 105 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 405 lakhs |
|
Cost of Project : 40500000 |