Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day |
Plant and Machinery cost: Rs 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : Solar Panel 5MW/Annum |
Plant and Machinery cost: Rs 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 450 Lakhs |
|
Cost of Project : 45000000 |
Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...
|
Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day |
Plant and Machinery cost: 128 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 570 Lakhs |
|
Cost of Project : 57000000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from CRT : 105 MT/annum,Other Metals: 450 MT/annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 2164500 Kgs /Annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 2164500 Kgs /Annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition of e...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.91 |
|
Break Even Point (BEP): 49.81 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource...
|
Capacity : 3000000 Ltrs. /Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: 112 Lakhs |
|
Cost of Project : 11200000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 210 Lakhs Nos. /annum |
Plant and Machinery cost: Rs. 719 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1736 Lakhs |
|
Cost of Project : 173600000 |
E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |