Please choose a project below related to this category.
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Lead acid batteries are rechargeable batteries made of lead plates situated in a ‘bath’ of sulfuric acid within a plastic casing. They are used in eve...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: 316 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 696 Lakhs |
|
Cost of Project : 0 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
Although zinc oxide has been known since ancient times, its use as a pigment is relatively recent. It was developed as a pigment in place of basic lea...
|
Capacity : 3000 MT/ Annum |
Plant and Machinery cost: 132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost Of Project : 401 Lakhs |
|
Cost of Project : 40100000 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
Profile Single super phosphate is a highly demanded fertilizer mostly used at the time of preparation of land. It comprises of 16% water soluble phos...
|
Capacity : 150000 MT/ Annum |
Plant and Machinery cost: 1621 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 2998 Lakh |
|
Cost of Project : 299800000 |
Product Profile Lithium hexafluorophosphate (LiPF6) is a typical electrolyte salt for lithium-ion batteries. Lithium hexafluorophosphate is an inorga...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 0.01 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Profile: The lead-acid storage battery, an important energy storage device, is the most widely used secondary storage cell by automobile and other in...
|
Capacity : 300000 Nos./Annum |
Plant and Machinery cost: 416 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of project : 1327 Lakhs |
|
Cost of Project : 132700000 |