Please choose a project below related to this category.
Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...
|
Capacity : 10000 Ltrs./day |
Plant and Machinery cost: Rs. 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 180 lakhs |
|
Cost of Project : 0 |
Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 2 crores |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
This is a most important instrument for tube light. Energy transmission is totally depending on the formation of choke. Self-life of the tube light i...
|
Capacity : 1000 Nos./Day |
Plant and Machinery cost: 6 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 83 Lakh |
|
Cost of Project : 0 |
The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: 45 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |
Due to Govt. emphasis for popularizing tourism, number of new hotels, holiday resorts, restaurants etc. have demand of paper conversion products like...
|
Capacity : 2 Mt Toilet Rolls, 2 Mt Facial Paper, 6 Mt Paper Napkin (Per Day) |
Plant and Machinery cost: Rs. 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 23.00 |
TCI : Rs. 600 Lakhs |
|
Cost of Project : 0 |
Copper Sulphate is blue crystalline granule or powdery white when dehydrated and has a nauseous metallic taste. It is manufactured by the reaction of...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: Rs. 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 205 Lakhs |
|
Cost of Project : 0 |
The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of every...
|
Capacity : 50,000 Plastic Glass, 25,000 Plastic Cups |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 69 Lakhs |
|
Cost of Project : 0 |
Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...
|
Capacity : 139 Lakh MT/Annum |
Plant and Machinery cost: 1030 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1163 Lakhs(Cost of Project) |
|
Cost of Project : 0 |
Cobalt Octoate is a very important compound having chemical formulas as such. CH3 | (CH2- CH2- CH2- CH2- CH- COOH)2CO The I.U.P.A.E. (Inte...
|
Capacity : 30000 Kg/Annum |
Plant and Machinery cost: 16 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 37 Lacs |
|
Cost of Project : 0 |
The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating labe...
|
Capacity : 1500 Lacs/Annum |
Plant and Machinery cost: 86 lacs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 213 Lacs |
|
Cost of Project : 0 |
Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It is...
|
Capacity : 1440 Cubie Meter/Day |
Plant and Machinery cost: 50 Lacs |
|
Working Capital : 18 Lacs |
Rate of Return (ROR): 18.19 |
|
Break Even Point (BEP): 75.00 |
TCI : 101 Lacs |
|
Cost of Project : 0 |
The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chairs,...
|
Capacity : 20 Articles/Day |
Plant and Machinery cost: Rs. 13 Lacs |
|
Working Capital : Rs. 28.0 Lacs |
Rate of Return (ROR): 42.81 |
|
Break Even Point (BEP): 48.28 |
TCI : Rs. 73 Lacs |
|
Cost of Project : 0 |