Please choose a project below related to this category.
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |
Potable spring waters containing, sulphur iron, magnesium and other mineral salts occurring in certain regions are claimed to be beneficial to human m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Jewellery making is one of the oldest industries in India. It has been a traditional craft in India, each region in the country specialising in differ...
|
Capacity : 2 Kg./day |
Plant and Machinery cost: Rs.95 Lakh |
|
Working Capital : |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 670 Lakh |
|
Cost of Project : 0 |
Copper is the most used conducting metal. There is a good market for enameled copper wire in motors and transformers industries for winding and rewin...
|
Capacity : 1 MT / day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 209 Lakhs |
|
Cost of Project : 0 |
As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power de...
|
Capacity : 7000 Nos. / Day |
Plant and Machinery cost: 5718 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 7861 Lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...
|
Capacity : 10000 Ltrs./day |
Plant and Machinery cost: Rs. 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 180 lakhs |
|
Cost of Project : 0 |
Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 2 crores |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
This is a most important instrument for tube light. Energy transmission is totally depending on the formation of choke. Self-life of the tube light i...
|
Capacity : 1000 Nos./Day |
Plant and Machinery cost: 6 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 83 Lakh |
|
Cost of Project : 0 |
The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: 45 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |