Please choose a project below related to this category.
Electroplating is the process of coating one metal or metal object with a very thin layer of another metal, typically by applying a direct electric cu...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The Gold is a relatively scarce yellow metal. Often found in the native State, which is the most malleable of all metals. It is extremely corrosion re...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Solar panel refers to a panel designed to absorb the sun's rays as a source of energy to generating electricity and heating. It reduces the amount of...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A piston ring is an expandable split ring used to provide a seal between the piston an the cylinder wall. Piston rings are commonly made from cast iro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Gold is more than a precious metal in Indian culture and is truly entrenched in their belief system. Over centuries and millennia, gold has become an...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Wooden Furniture Manufacturing Industry. Furniture Production Factory. Most Profitable Wood Furniture Manufacturing Business Idea. Traditionally...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Low Carbon Silicomanganese Production. Manufacturing Project of Low Carbon Silico Manganese. Production of Ferroalloys. Global Ferroalloys market ex...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System The IV cannula itself is a small flexible tube that surro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasses, Plates and Bags Manufacturing Project....
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Plastics are made from limited resources such as petroleum, and huge advances are being made in the development of technologies to recycle plastic was...
|
Capacity : Plastic Granules: 2400 Kgs/Day PET Granules: 2400 Kgs/Day |
Plant and Machinery cost: 97 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 238 lakhs |
|
Cost of Project : 23800000 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitors: 5 Kgs /Day Plastic Granules: 2333.33 Kgs /Day Copper Wire Scraps: 13.33 Kgs /Day Glass from CRT: 133.33 Kgs /Day Other Metals: 566.67 Kgs /Day |
Plant and Machinery cost: 100 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 325 lakhs |
|
Cost of Project : 32500000 |