Business Ideas: 1.50 - 2 Crore (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups

Please choose a project below related to this category.

Undergarments (Men and Women)
Undergarments (Men and Women)

Undergarments or underwear are clothes worn under other clothes, often next to the skin. They keep outer garments from being soiled by bodily secretio...

Capacity :

Regular Silk & Cotton Panties: 1000 Pcs/Day Bikini Sets : 1000 Pcs/Day Brasseries (Wired): 1000 Pcs/Day Brasseries (Non Wired): 1000 Pcs/Day Briefs Men

Plant and Machinery cost:

Rs. 165 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

61.00

TCI :

Cost of Project: Rs.462 lakhs

Cost of Project :

46200000

Bioplastic Film
Bioplastic Film

Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting conditions.A bioplastic is a plastic...

Capacity :

Bioplastic Film 25 Micron: 5000Kgs/Day

Plant and Machinery cost:

Rs. 184 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs. 616 lakhs

Cost of Project :

61600000

Bioplastic Film
Bioplastic Film

Plastic materials have made entry in every sphere of human life because of its superior characteristics such as durability, strengths, shape and molda...

Capacity :

Bioplastic Film 25 Micron: 1,500,000 Kgs per Annum

Plant and Machinery cost:

185 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: 617 Lakhs

Cost of Project :

61700000

Cashew Nut Processing Unit
Cashew Nut Processing Unit

The cashew nut is a popular dessert nut, eaten out of hand, with other mixed nuts and used in baking and confections. Sixty percent of cashews are con...

Capacity :

Cashew Nut Processing Unit: 20 MT/Day

Plant and Machinery cost:

Rs. 155 lakhs

Working Capital :

-

Rate of Return (ROR):

31.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project: Rs. 750 lakhs

Cost of Project :

75000000

Solar Panel
Solar Panel

A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...

Capacity :

Solar Panel: 25 MW

Plant and Machinery cost:

Rs. 161 lakhs

Working Capital :

-

Rate of Return (ROR):

54.00

Break Even Point (BEP):

28.00

TCI :

Rs.804 lakhs

Cost of Project :

80400000

Thinners and Solvent Thinners(Blending and Bottling)
Thinners and Solvent Thinners(Blending and Bottling)

A thinner is a solvent used to thin oil-based paints or clean up after their use. Commercially, solvents labeled "Paint Thinner" are usually mineral s...

Capacity :

Thinner (1 Ltrs Size): 4000 Bottles/Day Solvent Thinner (1 Ltrs Size): 4000 Bottles/Day

Plant and Machinery cost:

Rs 198 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: Rs395 lakhs

Cost of Project :

39500000

Biodegradable Plastic Products (Bags, Plates & Glasses)
Biodegradable Plastic Products (Bags, Plates & Glasses)

Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are thermoplastic materials which are pr...

Capacity :

Bio-Plastic Glasses (wt. each Glass 16 gms): 62500 Pcs/Day Bio-Plastic Plates (wt. each Plate 40 gms): 25000 Pcs/Day Bio-Plastic Bags (wt. each Bag 25 gms): 40000 Pcs/Day

Plant and Machinery cost:

Rs. 156 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

41.00

TCI :

Cost of Project: Rs789 lakhs

Cost of Project :

78900000

Industrial Gases and  Speciality Gases Mixture
Industrial Gases and Speciality Gases Mixture

Industrial gas is a group of materials that are specifically manufactured for use in industry and are also gaseous at ambient temperature and pressure...

Capacity :

Oxygen Gas (7M3 each Cylinder): 300 Nos/Day Nitrogen Gas (7M3 each Cylinder): 100 Nos/Day

Plant and Machinery cost:

Rs. 177 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project: Rs. 307 lakhs

Cost of Project :

30700000

Aluminium Cans Manufacturing
Aluminium Cans Manufacturing

Aluminium cans are every day commodities that people come across on a regular basis, whether it’s while they are grocery shopping, taking their lunch...

Capacity :

Aluminium Cans for Brewery: 15,000,000 Pcs./Annum Aluminium Scraps (Waste): 50,000 Kgs./Annum

Plant and Machinery cost:

Rs 172 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project: Rs712 lakhs

Cost of Project :

71200000

Bio-Degradable Products from Sugarcane Bagasse  (Plates, Bowls, Spoons and Cups)
Bio-Degradable Products from Sugarcane Bagasse (Plates, Bowls, Spoons and Cups)

Bagasse is the name for the residual fibers that remain after the squeezing of sugarcanes at the sugar production. Usually, they consist of 40 – 60% c...

Capacity :

Bio-Degradable Products (Plates, Bowls, Spoons & Cups) :500 Kgs/Day

Plant and Machinery cost:

175 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

69.00

TCI :

Cost of Project : Rs 233 lakhs

Cost of Project :

23300000

Biofertilizer and  Phosphate Rich Organic Manure (PROM)
Biofertilizer and Phosphate Rich Organic Manure (PROM)

Bio-fertilizers are selective live micro-organism like bacteria, fungi and algae. They provide a cost effective, eco-friendly & renewable source of nu...

Capacity :

Bio Fertilizer (Liquid) : 1000 Kgs./Day Bio Fertilizer (Solid) : 1000 Kgs./Day Micronutrients (Liquid) : 1000 Kgs./Day Micronutrients (Solid): 1000 Kgs./Day Organic Fertlizier (Liquid): 1000 Kgs./Day Organic Fertlizier (Solid):1000 Kgs./Day

Plant and Machinery cost:

183 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project : Rs 492 lakhs

Cost of Project :

49200000

Readymade Garments
Readymade Garments

Readymade garments are a part of our daily life. Clothes are an epitome of a culture. People in different parts of the world have their own styles of...

Capacity :

Shirts : 1000 Pcs./Day Trousers : 1000 Pcs./Day

Plant and Machinery cost:

169 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

59.00

TCI :

Cost of Project: Rs 447 lakhs

Cost of Project :

44700000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp