Please choose a project below related to this category.
An important part of this power system is the cable system that is used exclusively to carry power from the main substations to secondary substations...
|
Capacity : PVC Wires and Cables: 10 KMTRS/Day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 444 lakhs |
|
Cost of Project : 44400000 |
Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
In general, any biomass is suitable as raw material for pelletizing. Currently woody biomass is the predominant raw material for fuel pellet productio...
|
Capacity : 16.0 MT/day |
Plant and Machinery cost: 80 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 350 lakhs |
|
Cost of Project : 35000000 |
A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled conductors—the transformer's coils....
|
Capacity : Power Transformers(132/33 KV, 10000 KVA Core Type Oil Cooled):100 Nos/annum |
Plant and Machinery cost: 85 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 169 lakhs |
|
Cost of Project : 16900000 |
A thinner is a solvent used to thin oil-based paints or clean up after their use. Commercially, solvents labeled "Paint Thinner" are usually mineral s...
|
Capacity : Thinner (1 Ltr. Bottle):3000 Bottles/day Gum Rosin (Beroja) (1 Kgs Container):4200 Bottles/day Phenyl Concentrate (0.50 Ltr Bottle):6000 Bottles/day Cement Solvent (0.50 Ltr Bottle) |
Plant and Machinery cost: 93 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 60.00 |
|
Break Even Point (BEP): 29.00 |
TCI : Cost of Project: Rs 523 lakhs |
|
Cost of Project : 52300000 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for cooking purpose. The body of LPG cylinder is deep drawn in two pieces t...
|
Capacity : LPG Cylinders (Domestic 14.2 Kgs Size): 640 Nos. /Day LPG Cylinders (Commercial 19 Kgs Size): 560 Nos. /Day |
Plant and Machinery cost: 88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 392 lakhs |
|
Cost of Project : 39200000 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for cooking purpose. The body of LPG cylinder is deep drawn in two pieces t...
|
Capacity : LPG Cylinders (Domestic 14.2 Kgs Size): 640 Nos. /Day LPG Cylinders (Commercial 19 Kgs Size): 560 Nos. /Day |
Plant and Machinery cost: 88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 392 lakhs |
|
Cost of Project : 39200000 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for cooking purpose. The body of LPG cylinder is deep drawn in two pieces t...
|
Capacity : LPG Cylinders (Domestic 14.2 Kgs Size) 640 nos. per day LPG Cylinders (Commerical 18 Kgs Size) 560 nos. per day |
Plant and Machinery cost: 88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 391 lakhs |
|
Cost of Project : 39100000 |
A freshly squeezed orange or fresh pulped and strained apple would supply a fruit juice drink for immediate consumption, but to expect it to maintain...
|
Capacity : 3,750,000 Ltrs. /annum |
Plant and Machinery cost: 96 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 3.00 |
|
Break Even Point (BEP): 85.00 |
TCI : Cost of Project:1144 lakhs |
|
Cost of Project : 114400000 |
Security seals are mechanisms used to seal meters in a way that provides tamper evidence and some level of security. Such seals can help to detect the...
|
Capacity : 20,000 Th. Nos. /annum |
Plant and Machinery cost: 84 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 77.00 |
TCI : Cost of Project: Rs 158 lakhs |
|
Cost of Project : 15800000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. In spite of that per capita availability of fruits and...
|
Capacity : Fruits, Vegetables, Pulses & Spices Store :20,000 MT/annum |
Plant and Machinery cost: Rs 93 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project: Rs 903 lakhs |
|
Cost of Project : 90300000 |
Iron oxides are chemical compounds composed of iron and oxygen. All together, there are sixteen known iron oxides and oxyhydroxides. Iron oxides are w...
|
Capacity : 1500Mt/annum |
Plant and Machinery cost: 84 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : Rs 292 lakhs |
|
Cost of Project : 29200000 |