Electric equipment industry contributes over 2% of GDP which is projected to increase to about 12% in 2015 according to a study by Frost & Sullivan. During the period, consumption of electrical equipment is estimated to increase from over USD 28 billion now to USD 363 billion, growing at a CAGR of about 30%. It is also expected that during 2010-2015, the Indian equipment manufacturing will grow at 5.5 times the growth rate of global electronic equipment production.
The electrical equipment and accessories industry, with its highly diversified content, may be broadly segmented into (i) generation equipment, (ii) transmission equipment, and (iii) distribution equipment. The equipments and accessories under these segments include motors, turbines, generators, switchgears, transformers, circuit breakers, induction motors, power capacitors, meters, transmission towers. Besides these, the spectrum covers a whole range of power cables including XLPE and AAC and ACSR conductors and electrical consumer products like fans, electric lamps, exhausts and domestic appliances and accessories. Inverters, gensets, UP also fall under its domain.
The electrical industry has been showing signs of recovery after poor performance in the recent years. The domestic electrical industry, which includes equipment for generation, transmission, distribution and use of power in industrial units, constitutes a major part of the electrical products.
The growth of the industry is directly related to the development of power generation and distribution. India's generation capacity of 2,300 MW in 1950 expanded to over 116,500 MW including non-utilities at the end 2000-01. The total installed capacity of electric power generation further increased to 141,080 MW in 2007-08 (upto January 2008) compared to a capacity of 128,000 MW during the same period in 2006-07. The Eleventh Plan has targeted a capacity addition of 78,570 MW.
The five years (2007-2012) may be the best of times for power equipment makers with the power sector on an expansion spree. With order-book growth expanding over the last three years, there is a good chance that this will continue. Close to 82% of the planned generation capacity for the Tenth Plan was either implemented or was in the process of being implemented. Even assuming a 70% implementation ratio for the Eleventh Plan, close to 55,000 MW will be added. Five ultra mega power projects, totaling 20,000 MW are coming up in 2008. In the transmission sector, for example, Power Grid Corporation is planning a capex of Rs 710 billion by 2010.
Earlier, the shortfalls in achieving the Plan targets of addition to power generation and up-gradation of transmission and distribution had adversely affected the electrical equipment industry. The peak shortage which was over 11% of the requirement in 2003-04 increased to 11.7% in 2004-05 and to over 12% in 2005-06. The shortage further rose to about 14% in 2006-07. In the ten months of 2007-08 the peak shortage had risen to over 15% of the peak demand of 107,010 MW.
Major players in electrical equipment segment are ABB, BHEL, BHEL Power Solutions, Havell's India, Kirloskar Electric, Crompton Greaves and Suzlon Energy.
According to the Power Ministry, the power sector has tied up Rs 2,240 billion worth of investments to build power plants with 70,000 MW capacities in the next three years.
With some fast moves at launching fast track projects to augment supplies, the Indian industry needs to improve its competitiveness. The Indian market is growing and multinationals with newer technologies are now more active.
Reasons for buying our reports:
This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product
This report provides vital information on the product like its characteristics and segmentation
This report helps you market and place the product correctly by identifying the target customer group of the product
This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials
The report provides a glimpse of government regulations applicable on the industry
The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.
Our Approach:
Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.
The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players
We use reliable sources of information and databases. And information from such sources is processed by us and included in the report
Please choose a project below related to this category.
Power generation is an essential requirement of economic growth of a country. Generation involves with the production of power and transmission and di...
|
Capacity : 5 MW |
Plant and Machinery cost: 1753 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 29.00 |
TCI : Cost of Project : 2076 Lakhs |
|
Cost of Project : 0 |
Transformer oil, or insulating oil, is usually a highly-refined mineral oil that is stable at high temperatures and has excellent electrical insulatin...
|
Capacity : 30000.00 KLS/annum |
Plant and Machinery cost: 1294 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 3675 Lakhs |
|
Cost of Project : 0 |
Robust power generation and an effective delivery model determine the bullish economic growth of a country. A weak power infrastructure impedes the gr...
|
Capacity : 5 MW |
Plant and Machinery cost: 1733 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project : 2097 Lakhs |
|
Cost of Project : 0 |
Electronic power is the main source for the operation of electric or electrical instruments/systems being used in the industries or in domestic sphere...
|
Capacity : 10.00 Nos. /day |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 165 Lakhs |
|
Cost of Project : 0 |
Capacitors are used in virtually every electronics circuit that is built today. Capacitors manufactured in millions each day, but there are several ty...
|
Capacity : 2.60 Lakhs (5UF to 5 KVA)/Annum |
Plant and Machinery cost: 87 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 249 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day,Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and fax...
|
Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day, Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
Fluorescent lamps are low-pressure mercury electric–discharge lamps in which a phosphor coating transforms the ultraviolet energy generated by the...
|
Capacity : 60 Lakhs Pcs/Annum |
Plant and Machinery cost: 446 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 0 |
A toy is an object used in play. Toys are usually associated with children and pets, but it is not unusual for adult or some non domestic animal to p...
|
Capacity : 3200 Pcs/Day |
Plant and Machinery cost: 84 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : 225 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 834 Nos./day |
Plant and Machinery cost: Rs. 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 1179 Lakhs |
|
Cost of Project : 0 |
Now-a-days for manufacturing of Modular Electrical fittings polycarbonate powder is used due to its better quality and aesthetic value. Other electric...
|
Capacity : 10,000 Nos./Day |
Plant and Machinery cost: 36 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 387 Lakhs |
|
Cost of Project : 0 |
A LED packaged for high temperature operation comprises a metal base including and underlying thermal connection pad and a pair of electrical connect...
|
Capacity : 75 Crore / Annum (1,00,000 Pcs/Day) |
Plant and Machinery cost: 34 Crores |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 49.00 |
TCI : 36 Crores |
|
Cost of Project : 0 |