Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula CaSO4•2H2O. It is widely mined and is used as a fert...
|
Capacity : Gypsum Powder: 4800 MT/Day Plaster of Paris Powder: 7200 MT/Day |
Plant and Machinery cost: Rs. 3387 Crores |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs.3948 Crores |
|
Cost of Project : 39480000000 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 13333 Sq.mt./Day |
Plant and Machinery cost: Rs. 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project: Rs 3394 lakhs |
|
Cost of Project : 339400000 |
Gypsum Mining Business. Investment and Business Opportunity in Mineral & Mining Sector Gypsum is an evaporite mineral most commonly found in laye...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 50000 Sq.mt./Day |
Plant and Machinery cost: Rs 1605 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project : Rs12502 lakhs |
|
Cost of Project : 1250200000 |
Gypsum Plaster Board Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw...
|
Capacity : - |
Plant and Machinery cost: -- |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Gypsum board, also known as “drywall” or “plaster board,” consists of a core of gypsum surrounded with a paper covering. These gypsum board products i...
|
Capacity : Gypsum Plaster Board (Size 2440x1220x12 mm):10000 Sq.Mt./day |
Plant and Machinery cost: 549 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 3188 lakhs |
|
Cost of Project : 318800000 |
Phospho-gypsum is a by-product of the phosphoric acid industry and consists of 65-70 % gypsum, 25-30 % water and 5-10 % impurities, i.e. phosphoric ac...
|
Capacity : 600000 MT/annum |
Plant and Machinery cost: Rs 1008 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.89 |
|
Break Even Point (BEP): 43.92 |
TCI : Cost of Project: Rs. 3114 Lakhs |
|
Cost of Project : 311400000 |
Phospho-gypsum is a by-product of the phosphoric acid industry and consists of 65-70 % gypsum, 25-30 % water and 5-10 % impurities, i.e. phosphoric ac...
|
Capacity : 600000 MT/annum |
Plant and Machinery cost: Rs 1008 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs. 3114 Lakhs |
|
Cost of Project : 311400000 |
Gypsum board, also known as drywall or plaster board, consists of a core of gypsum surrounded with a paper covering. Several varieties of gypsum board...
|
Capacity : 6600 No.s/day |
Plant and Machinery cost: 192 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 26.11 |
|
Break Even Point (BEP): 61.30 |
TCI : Cost of Project : 551 lakh |
|
Cost of Project : 55100000 |
Calcium always occurs in the combined state. The most important naturally occurring compounds of calcium are calcium sulphate in mineral anhydrite an...
|
Capacity : 60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Laminated Ceiling Tiles) |
Plant and Machinery cost: 840 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 2352 Lakhs |
|
Cost of Project : 0 |
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |