PVC pipes are produced by extrusion process followed by calibration to ensure maintenance of accurate internal dia with smooth internal boxes. These p...
|
Capacity : PVC Pipes (Size 1 inches): 510 MT/Annum PVC Pipes (Size 1.50 inches): 825 MT/Annum PVC Pipes (Sizes 2 inches): 1107 MT/Annum PVC Pipes (Size 2.50 inches): 1758 MT/Annum |
Plant and Machinery cost: Rs. 58 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project : Rs. 184 lakhs |
|
Cost of Project : 18400000 |
Urea-formaldehyde resin is a major commercial adhesive, especially within the forest products industry. It offers a number of advantages when compared...
|
Capacity : Liquid Urea-Formaldehyde Resin: 8 MT/day |
Plant and Machinery cost: Rs.71 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project: Rs. 209 lakhs |
|
Cost of Project : 20900000 |
Workwear is clothing worn for work, especially work that involves manual labour. Often those employed within trade industries elect to be outfitted in...
|
Capacity : Trousers: 3000 Pcs/day High-Visibility Long Sleeve Jackets: 1000Pcs/day |
Plant and Machinery cost: Rs. 136 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project : Rs1271 lakhs |
|
Cost of Project : 127100000 |
Paprika oleoresin is a natural food colorant used to obtain a deep red colour in any food that has a liquid/fat phase. The oleoresin is slightly visco...
|
Capacity : Chilli Oleoresin: 250 Kgs./day |
Plant and Machinery cost: Rs 75 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs. 237 lakhs |
|
Cost of Project : 23700000 |
Caffeine belongs to a family of naturally occurring compounds known as xanthines. The xanthines, which come from plants, are possibly the oldest known...
|
Capacity : Caffeine: 20 MT/day |
Plant and Machinery cost: Rs. 350 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs. 2268 lakhs |
|
Cost of Project : 226800000 |
Magnesium Sulphate is commercially available as heptahydrate, monohydrate, anhydrous or dried form containing the equivalent of 2-3 waters of hydratio...
|
Capacity : Magnesium Sulphate (Fertiliser Grade): 24 MT/day |
Plant and Machinery cost: Rs. 147 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 434 lakhs |
|
Cost of Project : 43400000 |
Dehydration is a process by which shelf life of the fruits can be extended by evaporating water while preserving the taste.Dehydrated products can be...
|
Capacity : Dehydrated Fruits: 400 Kgs./day |
Plant and Machinery cost: Rs. 1084 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs1425 lakhs |
|
Cost of Project : 142500000 |
Heat Resistant Aluminum Paint. 600°C. These paints can resist heat, flames, grease, rust and smoke, which make them ideal for specific applications.Pa...
|
Capacity : High Temperature Aluminium Based Paint: 200 Kg/day |
Plant and Machinery cost: Rs 8 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs. 52 lakhs |
|
Cost of Project : 5200000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
A water soluble fertilizer is a compound that dissolves easily in water and provides nutrients for plants. This type of fertilizer may then be absorbe...
|
Capacity : NPK Fertilizer (19-19-19) (in 5 Kgs Size Pack) : 32 MT/day |
Plant and Machinery cost: Rs. 87 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs529 lakhs |
|
Cost of Project : 52900000 |
Fiber optics, or optical fiber, refers to the medium and the technology associated with the transmission of information as light pulses along a glass...
|
Capacity : Optical Fibre Preform 50 Dia: 3000000 KMeters/Annum |
Plant and Machinery cost: Rs. 3013 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs3828 lakhs |
|
Cost of Project : 382800000 |