The wax crayons are used for outlining and shading by the artist for drawing. Two types of crayons are produced in India chalk crayons and marking cr...
|
Capacity : 7200 Dozens / Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 50 Lakhs |
|
Cost of Project : 0 |
Sewing thread is a common household item and is the prime material for stitching purpose. Capren and lavsan used for the manufacture of sewing threa...
|
Capacity : 2000 Nos. / Day |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 51.00 |
TCI : 13 Lakhs |
|
Cost of Project : 0 |
Paper envelopes play an important role as a stationery material in any type of correspondence. The basic raw material is paper. Mostly, white or brow...
|
Capacity : 60,000 Nos. / Day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 63 Lakhs |
|
Cost of Project : 0 |
Steel is the most widely used materials in a large variety of applications. Steel is one of the most recyclable material available-40% produced in th...
|
Capacity : 1785000 MT / Annum |
Plant and Machinery cost: 836 Crores |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 1124 Crores |
|
Cost of Project : 0 |
The straw board slate is an important item for school. They are economical as they can be used again and again. They are used particularly by primary...
|
Capacity : 1000 Nos. / Day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 31 Lakhs |
|
Cost of Project : 0 |
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |
Pipe fittings are used to connect pieces of pipe made of different materials viz. connecting galvanized to copper or cast-iron drain pipe to transits...
|
Capacity : 1500 MT /Annum |
Plant and Machinery cost: 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 280 Lakhs |
|
Cost of Project : 0 |
Cement is used to designate many different kinds of substances that are used as binders. After the 19th century, there were certain process improveme...
|
Capacity : 60,00,000 MT/Annum Portland Cement |
Plant and Machinery cost: Rs. 121 Crores |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : Rs. 261 Crores |
|
Cost of Project : 2610000000 |
Bricks are the most common building materials. It is a mixture of clay and sand and small quantities of limes Bricks and classified accordingly to th...
|
Capacity : 20000 Nos. /Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.40 |
|
Break Even Point (BEP): 42.26 |
TCI : 110 Lakhs |
|
Cost of Project : 0 |
Kraft paper is one of the important papers for wrapping heavy bundles. It is used mostly in all types of packaging. Kraft paper is made from waste...
|
Capacity : 10 Ton /Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: 4 Crore |
|
Cost of Project : 40000000 |
Maize starch is the most commonly used carbohydrate found in plants. Industrially, starch is classified into two types viz. natural & modified starch...
|
Capacity : 61.56 MT/Day (Maize Starch), 50 MT /Day (Liquid Glucose) |
Plant and Machinery cost: 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 20 Crores |
|
Cost of Project : 0 |
The importance of milk in human diet especially for children and expectant and nursing matters is vital. To meet the demand of the increasing populat...
|
Capacity : 27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung |
Plant and Machinery cost: 4 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 25 Crores |
|
Cost of Project : 0 |