Please choose a project below related to this category.
It is one of bakery products largely used by the cake manufacturer. Basic raw materials are vegetable oil, G.M.S., Xanthenes gum, Satiric Acid etc. It...
|
Capacity : 500 Kgs Cake Gel/Day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : Rs. 48 Lakhs |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 30 Lakhs |
|
Cost of Project : 0 |
There are few food items are largely used as diabetic food. There is no ill effect produce by taking of this food by the diabetic patient. It is now m...
|
Capacity : 1 MT Diabetic Food/Day |
Plant and Machinery cost: Rs. 20 Lakhs |
|
Working Capital : Rs. 85 Lakhs |
Rate of Return (ROR): 35.40 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 35 Lakhs |
|
Cost of Project : 0 |
Shelter is a basic need of the human specis. It is one of the basic rights which any human being may claim. Housing remains one of the crucial problem...
|
Capacity : 3000 Sq.mt/Day |
Plant and Machinery cost: Rs. 59 Lakhs |
|
Working Capital : Rs. 31 Lakhs |
Rate of Return (ROR): 45.16 |
|
Break Even Point (BEP): 47.64 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 8 Lakhs |
|
Working Capital : Rs. 134 Lakhs |
Rate of Return (ROR): 51.74 |
|
Break Even Point (BEP): 40.21 |
TCI : Rs. 160.00 Lakhs |
|
Cost of Project : 0 |
Plaster of paris is a white hygroscopic powder having formula CaSo4? H2O is obtained by the calcination of gypsum. Plaster of paris is extensively use...
|
Capacity : 50 MT / Day 1500 MT / Annum |
Plant and Machinery cost: 47 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 3 Crores |
|
Cost of Project : 0 |
The use of granite and other decorative stones has been increasing world over. India is endowed with vast deposits of these natural resources and is t...
|
Capacity : 100 Sq. M./Day |
Plant and Machinery cost: Rs. 168 Lakhs |
|
Working Capital : Rs. 151 Lakhs |
Rate of Return (ROR): 47.73 |
|
Break Even Point (BEP): 42.87 |
TCI : Rs. 388 Lakhs |
|
Cost of Project : 0 |
Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or ceme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 39.28 |
|
Break Even Point (BEP): 48.99 |
TCI : - |
|
Cost of Project : 0 |
Marble polishing batti is an essential item in the marble and granite polishing industries. Now a days there is good market demand of granite and marb...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 33.63 |
|
Break Even Point (BEP): 40.77 |
TCI : - |
|
Cost of Project : 0 |
Bricks may be made from a no. of different kinds of materials but they must usually posses a certain amount of plasticity. Fly ash is one of them. Fly...
|
Capacity : 250 Lacs Nos/Annum |
Plant and Machinery cost: Rs. 27.00 Lacs |
|
Working Capital : Rs. 62.0 Lacs |
Rate of Return (ROR): 27.16 |
|
Break Even Point (BEP): 65.69 |
TCI : Rs. 158.0 Lacs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : 134 Lakhs |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
With the vast potential of plastics, artificial synthetic marble is virtually replacing the use of natural marble. The qualities of artificial synthet...
|
Capacity : 3 MT/Day |
Plant and Machinery cost: Rs. 17 Lakhs |
|
Working Capital : Rs. 54 Lakhs |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 121 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 84 Lacs |
|
Working Capital : Rs. 74 Lacs |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Rs. 250 Lacs |
|
Cost of Project : 0 |