Please choose a project below related to this category.
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : 600 Ton/Annum |
Plant and Machinery cost: 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 276 Lakhs |
|
Cost of Project : 0 |
This is hardly a family in India where glittering aluminium utensils occupy significant place. Aluminium utensils of domestic use are of three broad c...
|
Capacity : 900 MT/Annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : 146 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now a...
|
Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 104 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A breed is a group of animals related by descent from common ancictors and visibly similar in most characters. A breed may come about as a result of p...
|
Capacity : 500 Ltrs Milk/Day, 66 Breeding Job/Day |
Plant and Machinery cost: 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 87 Lakhs |
|
Cost of Project : 0 |
Rubber is polymer of butadiene and one of the most chemical ingredients which is widely used in the different field of modern advance world, speciall...
|
Capacity : 300 MT/Annum |
Plant and Machinery cost: 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 60 Lakhs |
|
Cost of Project : 0 |
Roofs are basic element of shelter to protect the people themselves from cold, wind rain and sun. Tiles are thin slabs of baked clay used for constru...
|
Capacity : 5000 Nos. /Day |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 163 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 66.66 MT/Day |
Plant and Machinery cost: Rs. 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 2112 Lakhs |
|
Cost of Project : 0 |
Wheat starch is produced from wheat species such as Triticum aestivum, which is also known as bread wheat. Starch is one of the main carbohydrate in w...
|
Capacity : 1.0 Ton/Day (Gluten), 16.66 MT Wheat Starch /Day |
Plant and Machinery cost: Rs. 100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Rs. 350 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs. 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 22.00 |
TCI : Rs. 3463 Lakhs |
|
Cost of Project : 0 |
Aluminium is most abundant metallic element is used on earth. Various section of aluminium is used in building are rods, wires, channel etc are the st...
|
Capacity : 1500 MT /Year |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 415 Lakhs |
|
Cost of Project : 0 |
Aluminium is most abundant metallic element is used on earth. Various section of aluminium is used in building are rods, wires, channel etc are the st...
|
Capacity : 1500 MT /Year |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 415 Lakhs |
|
Cost of Project : 0 |