In view of the important of tomato either fresh or processed in the daily diet due to the high nutritive value, there are good potentials to develop t...
|
Capacity : 12 Ton/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 469 Lakhs |
|
Cost of Project : 0 |
Gravity casting which is in fact is a permanent mould casting in which the molten metal is poured under the force of gravity into the permanent mould...
|
Capacity : 300.00 Kgs/day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 65 Lakhs |
|
Cost of Project : 0 |
The tyre and tubes are very important rubber products and widely used everywhere in the world. Various types of tyres are available namely pneumatic s...
|
Capacity : 12 Tyres/Day |
Plant and Machinery cost: 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 340 Lakhs |
|
Cost of Project : 0 |
Prestressed Concrete poles for electrical H.T. and L.T. lines widely used now a days in different power distribution in the villages specially rather...
|
Capacity : 30,000 Nos/Annum |
Plant and Machinery cost: 71 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : 209 Lacs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |
Anodic Aluminium Labels used as an industrial, metallic labels and are widely used on industrial machinery and domestic appliances for supplying the s...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 132 Lakhs |
|
Cost of Project : 0 |
Prestressing is the process of applying a load to a structure deforming, so that it will withstand a work load more effectively or deflect less. Prest...
|
Capacity : 500 Nos./Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 514 Lakhs |
|
Cost of Project : 0 |
The American petroleum industry had its inception when the now famous drake well was drilled in the year 1859. The ratio of proven reserves to produc...
|
Capacity : 200000 Cube Meter/Day |
Plant and Machinery cost: US $ 273.3 Million |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 12.00 |
TCI : US $ 3083 Million |
|
Cost of Project : 0 |
Chemically speaking soaps are salts of fatty acid, generally mixture of various such salts. Based upon their properties, soaps are broadly classified...
|
Capacity : 8 MT/Day |
Plant and Machinery cost: 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 217 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 1307 Lacs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : Rs. 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1307 Lacs |
|
Cost of Project : 0 |